Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONfun

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
fun

Description:
superfuntimes

Author:
jeremy wilks
(Other tests from this author)

Creation Date:
22/07/2014

Category:
Others

Number of questions: 179
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process? Sampling Scheme Sampling Procedure Dynamic Modification Rule Sampling Condition.
Which of the following are control parameters that can be set on the material master for Quality Management (choose 3) MRP Type Inspection Type Sample Determination Requirements for the vendors QM system.
You can change 'Master inspection characteristics' and/or 'inspection methods' with history. Which of the following are true If you change basic data with history, the changes are not automatically made in the inspection plan, material specifications or certificate profile If you want to use a history, the inspection characteristics with history indicator, or the inspection methods with history indicator (or both) must be set in Customizing If you change basic data with history, the system creates a new version for the changed master record that has the same validity period as the "old" version all the above.
The assignment of a profile to an object has a validity period. However the profile itself does not have a validity period. True False.
In the quality management component, you process quality inspections on the basis of inspection lots. You must also implement one or more components in the logistics supply chain, depending on your requirements for inspection lot processesing. Which of these is FALSE? Materials management is required if you want to process goods issue inspections when delivieries are created. Production Planning is required if you want to process inspection during production when production orders or process orders are released. Plant Maintenance is required if you want to process calibration inspections for equipment or functional locations when maintenance orders are released.
With reference to Multiple Specifications in inspection planning, which of the following statements are true? Multiple specifications must be stored in an inspection plan. You cannot create multiple specifications using the engineering workbench. You can create the multiple specifications in a new inspection plan, but not on an existing inspection plan. You need to define object types permitted for multiple specifications, but not objects for each object type.
Quality management data is primary maintaned at the; Cost center level Plant level Company code level Sales organization level.
Which of the following types of orders are used in machine construction? Run schedulers Production orders Process orders Inspection orders.
Which of the following are the only master data in QM that is required for an inspection during producation with defects recording Lots Info records Defect records Catalogs.
Which indicators must be set in the inspection type for origin 03 or 13 (for example in the inspection setup of the material master to record results by characteristic for the order)? Choose 2 Inspect with task list inspect with material specification inspection with dynamic data inspect with modification rule.
Which of the following recording methods can be used for quantitative characterists? Choose 3 class confirmation summarize confirmation single values implicit value.
What status will be set by the system if an inspection lot is created successfully ilcr ilnc ilss ilnn.
Which quality inspection method do you prefer if you want to record results for several inspection lots? has worklist -> results recording inspection result -> for inspection point -> record inspection result -> results recording -> record has worklist -> inspection recording.
Which of the following to PP customizing settings can the system propose if the inspection point completion variant allows confirmation? Choose 3 partial confirmation final confirmation no confirmation automatic confirmation.
Identify the field that is used to define, whether the quantaties of the materials assigned to the inspection points are to be assigned to partial lots or not ( assume you have activated the function for inspection points) field combination PL assignment PL details dynamic mod level.
Which of the following control indicators must be set when you create master inspection characterists for control charts Choose 2 sampling characteristic SPC procedure sampling procedure SPC characteristic.
Which of the following have to assigned to an inspection lot if you want to record inspection results for inspection characteristics inspection characterists inspection materials inspection tasks inspection specfication.
How do you determine the samples size once an inspection specification has been assigned to an inspection lot. Choose 2 the system calculates the sample size automatically the system calculates the size based on characteristics you can enter the sample size manually manual sample calculation.
How does the system create an inspection lot automatically when goods are returned from a customer. Choose 2 Blocked stock returns Warehouse unblocked stock returns Blocked warehouse.
Which inspection allows you to inspect one or more pieces of test equipment to check the equipments operation, accuracy and suitability for use Calibration inspection non-calibration inspection Maintenance inspection Test inspection.
Which of the following conditions should be met to be able to make a usage decision when creating a task list with QM data. Choose all that apply Create a piece of equipment as test equipment assign a measuring point or counter to this piece of equipment you have created a master inspection characteristics in QM You must have created the characteristic of the measuring point/counter with reference to a class characteristic of the classification system.
In which type of maintenace plan rescheduling does the system assume that the counter readings are current and calculates the plan dates accordingly time based maintenance plan quality based maintenance plan performance based maintenance plan period based maintenace plan.
Which of the following are of utmost importance for effective planning and execution of extensive maintenance work while planning the order. Choose 2 planner groups chronological sequence settlement rules dependancy of individual operations.
How do you activate the functions for external processing in QM? Choose 3 you must make sure that the operation control key in the production order specifies external processing you must activate a goods reciept inspection for the operations to be processed externally by specifying an inspection type (inspection lot origin 01) in the routing (external processing data for the operation) you must activate a goods reciept inspection for the operations to be processed externally by activating this inspection type in the material master of the final product the system automaticaly creates an inspection lot so you can inspect the internally processed goods.
which of the following are primarily used in inspection during production to monitor and control the production processess? control charts usage decisions batch management stand points.
Which of the following is used as a basis after an inspection lot has been released in order for inspection results to be recorded, and you need to make allowances for additional characteristics for results recording fully maintain master inspection characterists partially maintain master inspection characteristics master inspection task list sampling procedure.
which function helps you to force the closure of an inspection characteristic if the inspection results have not been completely recorded for the characteristic manual closure characteristic closure inspection closure forced closure.
while calculated the share of defects, which distrubution category is only used for characteristics with at least one toloerance limit for which the measured values are confirmed? normal distrubution bi-nomial distrbution poisson distrbution multiple distribution.
Which type of control charts are based on the specificed tolerance and control the share of scrap in the process? acceptance charts shewhart charts mean value chart statistical chart.
which of the following displays a chronological curve of the measured value or sample mean values for a characteristic control chart run chart pie chart median chart.
which paramater in customizing determines whether seperate or common control charts are maintaned for different orders, work centers, materials, manufactorers or customers control charts number ranges control limits SPC criteria.
while creating a production version for an inspection lot, how the quality will be affected if the dynamic modification rule specifies that the quality level must be updated when the usage decision is made the system creates one the system does not update the quality level now the system updates the quality level now the system deletes quality level now.
Which of the following processess can be carried out seperatly when a final backflush is carried out at the end of the production. choose all that apply posting goods recipets for finished parts posting goods issues for components reducing planned orders or production quantaties posting production costs to the product cost collector.
What are the new worklists for results recording transactions that are available for inspection processing in PM. Choose 2 QE53 worklist for recording results for equipment QE51 worklist for recording results or equipment QE54 worklist for recording results for function locations QE55 worklist for recording results for function locations.
What are the prerequisites that have to be met to make the usage decision for an inspection lot. Choose 3 you have the user authorization to make the usage decision the inspection lot is released the inspection lot is created you have recorded inspection results for the inspection characteristis and all pieces of equipment have been valuated for each operation.
if inspection results are to be copied to a measurement point for the equipment, a link must be established to which of the following, when you assign a corosponding class characteristic master inspection characteristic QM master inspection characteristic inspection characteristic class characteristic.
which of the following helps you to plan the operations in the order they are to be performed externally by vendors in quality inspection for external processing? references maintanence flag control key inspection lot.
which of the following criteria should be satisfied if you want to post a material to unrestricted use stock immediatly for a goods movement even though a quality inspection is scheduled and the goods are to be posted to inspection stock. choose 2 activate the control for posting the goods to inspection stock stock is managed by the inspection lot the control indicators for skips have been activated for the corrosponding inspection type in the material master (QM inspection data) the automatic usage decision have been activated for the corrosponding inspection type in the material master (QM inspection data).
Which of the following conditions should be satisfied for an inspection lot to be created automatically as soon as the warehouse recipt is posted appropriate inspection type is entered in the material appropriate inspection plan is entered in the material warehouse reciept indicator set inspection plan indicator set.
you cannot change the setting in which of the following if the quality control indicator is set in the inspection setup for the material master Choose 2 material master order header restricted stock warehouse reciept.
what happens if the batch or storage location differs from the planned batch or storage location at the time of goods reciept inspection lot gives an error inspection lot is deleted inspection lot marked as defective new inspection lot created.
When the system releases a production order or process order, it can create an inspection lot for which of the following? choose 2 inspection lot for a GR from production (lot origin 04) inspection lot for a production inspection (lot origin 03) inspection lot for a production inspection (lot origin 02) inspection lot for a production inspection (lot origin 01).
To create an early inspection lot for a GR from production ( lot origin 04) when a production or process order is released, which of the following indicator must be set to Y for the inspection type assigned to inspection for lot origin 04 in the material master for the material to be inspected (quality management view) control inspection point control inspection lot control inspection task control production lot.
What are the various options available to manage test equipment. Choose 3 Material master document master equipment services.
which of the following strategies are helpful when implementing a calibation inspection. choose 2 time based counter based equipment based performance based.
which of the following determines how the sample is calculated in the sampling procedure valuation mode sampling type fixed sampling parameter variable sampling parameter.
How do you assign a previously processed inspection point to a current partial lot PL function reassign PL function reassign PI function PI function.
What are the different order types that can trigger quality inspections when released for processing so that QM can automatically create inspection lots in preperation for the quality inspection. Choose 3 Process orders Production orders Maintenance orders Purchase orders.
Identify the inspection which is created by the system regardless of whether an inspection lot exists for the corresponding order Goods reciept inspection early goods reciept inspection process inspection order inspection.
Which of the following can be created when the order is released and can run in parallell to inspection lots during production ( origin 03) good reciept stock goods reciept posting early GR lots production lots.
What options do you have to generate a maintenance order and an inspection lot from a maintenance call. Choose 2 you can release a maintenace call automatically you can release a maintenace call manually the system generates an order and inspection lot automatically within the inspection lot function the system generates an order and inspection lot automatically within the scheduling function.
how do you define the chronological sequence in which an operation is divided into sub operations in an order work center operation link task links relationships.
which type of inspection lot do you use to inspect the completed production goods before the stocks are posted to the warehouse stock in a goods reciept inspection lot for a production inspection (03) inspection lot for a production inspection (03) inspection lot for a goods reciept from production (04) inspection lot for a goods reciept from production (03).
what will you do if an inspection lot already exists for a production version and it is incomplete you can ignore and directly create a new one you must first complete the current inspection lot before you create a new one you can save the current inspection and create a new one you can create a duplicate inspection.
the inspection characteristics in quality management are integrated to which of the following functions in production planning component. choose 2 work scheduling production processing inspection points workshifts.
What are the different QM functions available to record defects manually. choose 3 defects recording results recording usage decision order defects recording.
what are procedures available for operation based results recording. choose 2 direct entry to results recording using the worklist function choose results -> worklist function choose results -> for an operation choose results -> results recording.
What happens when you only set the indicicator (posting in inspection stock) in the quality manegement view of the material master triggers automatic posting in the inspection stock no inspection lots are created automatic inspection lots are created goods movement done automatically.
which indicicator is used to activate quality management in procurement for all plants of a client 100% inspection inspection without plant QM procurement active QM active.
Which of the following restrictions apply if you perform a simplified quality inspection using the material specification. Choose 3 you cannot pre define work centers you cannot use inspection methods you cannot perform dynamic modifcations you cannot perform inspection task lists.
Which inspection lot setting will you use for goods movement if you are working with materials that are subject to batch management. ' ' one inspection lot for each material document item 'X' one inspection lot for each purchase order item/order item '1' one inspection lot for each material document and material '2' one inspection lot for each material and batch.
Which of the following conditions should be met in order for the system to create an inspection lot automatically when a goods movement occurs. choose 2 an inspection lot origin is assigned to the movement type an inspection type is active for the material in the inspection settings of the material master an inspection type is active for the material in the inspection settings of the movement type an inspection lot origin is assigned to the material master.
which type of goods movement involves a material withdrawal, material issue or shipment of goods to a customer Goods reciept Goods issue stock transfer return delivery.
in procurement process quality management is involved in which of the following. choose all that apply RFQ purchase order processing goods reciept vendor evaluation.
which of the following documents are considered for procurement documents. choose 2 quality assurance agreement( document type Q01) Quality certificates (document type D01) technical delivery terms (document type Q02) quality purchase order (document type QP1).
Which of the following is set in the inspection lot if there is no certificate available at goods reciept usage decision status certificate inspection certificate.
Which of the following specified in each inspection characteristic controls whether or not the data will be copied from the electronic certificate or whether the data will be dertermined by inspection recipient results data origin interface certificate indicator.
Which of the following conditions should be met for a certificate record to be created at goods reciept (at the latest) choose 2 the relevant material requires a certificate the relevant purchase order requires a certificate the corresponding settings have been made in customizing for the certificate type the corresponding settings have been in customizing for the purchase order.
which field in QM inspection data in the material master allows you to specify that an inspection lot is to be created for the first partial delivery only for each purchase order item copy specification automatic usage decision inspection upon first goods reciept only individual QM order and qm order number.
Which of the following define that under certain circumstances, an existing inspection lot may be extended for a sequence of goods movement parameters for lot creation controls for lot creation lot combinations for lot creation order criteria.
under which of the following conditions does the system set the reason for blocking quality for an item. choose 2 goods reciept related invoice verification no goods reciept related invoice verification automatic invoice verification no invoice information.
how do you specify a procedure for the procurement process procurement info record quality info record purchasing info record quality assurance record.
Identify the contents of the dynamic modification rule. choose 3 definition of inspection stages time of updating the quality level conditions for an inspection stage change sampling scheme.
Which of the following conditions have to be fufilled for the material to be immeditaly posted to unrestricted use stock (required settings are made in the inspection set up) inspection lot completion quality lot work list skip to stock.
which of the following conditions have to be fufilled by the inspection lot to be part of a list of inspection lots for which a collective usage decision has to be made. choose all that apply no usage decison has been made no characterists were rejected no defects were recorded characteristic processing has been completed.
The quality information record must relate to which of the following, if the manufactorer part profile defines manufacturer related QM processing. choose 2 Vendor material customer manufacter part.
Under which of the following conditions the posting of the goods issue does not necessarily have to wait until the usage decision has been made and the goods have been accepted. inspection performed after shipping inspection performed parallel to shipping goods have been issued inspection by customer is present in the system.
how do you determine the stage at which quality control takes place for a particular combination of material and customer delivery category preliminary series quality info record customer info record.
what happens to the characteristics that are valuated for the configuration but do not exists in the task list or material specification they are not inspected inspected set to pending status set to deletion status.
which of the following do you use if goods are returned by a customer for repair or replacement because of a technical defect quality returns quality notifications replacement authorization quality tasks.
_____ are used to track quality issues and trigger further actions, such as rework or scrapping quality certificates quality notifications certificates of approval certificates of acceptance/rejection.
The scenario of "quality management in discrete manufactoring" focuses on..choose 3 inspection result recording goods reciept based on production order goods reciept based on external processing only with pre installation of scenario usage decison after inspection only in case the inspection lot was passed after manufactoring.
The Prerequiset "S" for "quality management in discrete manufactoring" is/are choose 2 execute the material requirements planning run the cost run both a & b, but a preceeding b (special characteristic of "quality management in discrete manufactoring") both a & b, but b preceeding a.
with the usage of "quality management in production" in the case of discrete manufactoring, the "inspections" can be processed during production _____ phase operation stage batch portfolio.
What are the types of intervals which apply in case of "inspection during production" choose 3 quantity based intervals time based intervals freely defined intervals only A & B in case of dicrete manufactoring.
to monitor the production process contiuously with respect to the inspection characteriscs what do you recommend from below allocate inspection points with the same usage decision to partial lots allocate inspection points with the different usage decisions to partial lots partial lots do not apply in the scenario in picture partial lots do apply but the usage decisions cannot be linked to partial lots.
the concept of "task list types" is of great significance in quality management. it is one of the master data to be maintained in case an inspection has to be processed during production. In the stated scenario the task list types which are to be used are? choose 3 routing master recipe rate routing both A and B above.
"sampling procedure" determines the sample size for an inspection. please choose the correct response the sampling type in the sampling procedure determines the rules for accepting or rejecting a characteristic or sample the valuation mode defines how the sample is calculated when sampling procedures are maintained, a fixed sample for inspections during production with inspection point processing should be specified none of the above is correct.
The number of inspections to be performed for each characteristic is defined by choose 2 inspection grid inspection frequency number of usage decisions linked to each lot "1;1" number of inspection is not derived by any of these factors but is determined independently at run time.
In case of inspection during production with inspection point processing, quality management view of the material master has to be maintained. in case of indiciator for the inspection type, the following indicator "S" can be set choose 2 INSP. with task list INSP. by characteristcs inspect with material specification an inspection cannnot be carried out with both task lists and material specification and hence there doesnt exists any indictco as in c above.
while maintaning default settings at plant level for QM, a user field definition for inspection points has to be specified. choose 2 by specifying a user field combination in the task list header of each task list, you can override the plant dependant settings defined in customizing If you do not maintain this field in the task list header, the system copies the respective settings defined in customizing into the inspection lot by specifying a user field combination in the task list header of each task list, the plant dependant settings defined in customizing cannot be over written the settings defined in customzing cannot be copied into the inspection lot as both become dlinked when a user field definition for inspection points is specified.
an inspection lot can be created choose 3 when the first operation is released for production order or process order manually but only if the order released when a run schedule header is created manually if the order is not released.
if you assign a task list with inspection characteristics to a production order or process order after an inspection lot as been created, these inspection characteristics are not to be taken into consideration in the inspection become irrelevant for inspection are taken into consideration even if these are assigned late. this is the dynamic inspection characteristcs assignment are considered only for the next lot onwards.
the prerequisite "s" to create inspection lots in the production order or process order is/are choose 3 the inspection data for the material to be produced has been maintained in the quality management view of the material master and the corresponding inspection types have been activated the inspection data for the material to be produced has been maintained in the quality management view of the material master. the corresponding inspection types can be activated even after creation of inspection lots the order does not contain a deletion indicator or deletion flag in the header the order has not been completed technically.
in manufactoring with QM, you can confirm the inspection results to QM in two ways- can call up results recording in QM directly from process instruction (PI sheet) or can copy summerized inspection results from process messages. the above is true for only discrete manufactoring only process manufactoring either discrete or process manfuctoring neither discrete or process manfctoring.
with production lots with inspection point processing, the system transfers the results to the batch classification when the usage decision is made when you record results for the inspection point not prior to recording of results for the inspection point recording of results is not related to batch classification.
A job for the automatic usage decision for production lots is possible to be defined using the task list function using the work list function using both worklist and tasklist function automatic usage decision is not possible in this way.
In the screen "valuate inspection point", the system proposes a usage decision code. A user can choose 2 change the partial lot valuation change the partial lot valuation and description change the usage decision code within the predefined code group change the usage decision code even outside of the predefined code group.
when you make confirmations for an inspection point, the system proposes the partial lot that was last processed ( provided partial lots already exists) always proposes a blank value (editable by user) doesnt propose any lot only if the last lot was processed partly proposes the partial lot that was last processed (provided partial lots was created only manually).
The function "reassign PO" is used to assign previously processed inspection points to last partial lot assign previously processed inspection points to current partial lot assigned currently in process inspection poinits to current partial lot there is no function as reassign PO.
When you save the characterists results, you make the confirmations for the operation. you make the confirmations in accordance with the following indicators. choose 3 partial confirmation final confirmation no confirmation none of the above.
The inspection point quantities for the last QM relevent operation are proposed for the goods reciept posting for the order only those quantities that are confirmed to PP as yield are taken into account only open quantities are taken into account only those quantities that are yet to be confirmed to PP as yield are taken into account quantities have to be put manually only as there is no provision of auto proposal.
inspection results can be recorded choose 2 for planned co product for planned parent product for unplanned co product for unplanned parent product.
Please the correct option (S) choose all that apply You can confirm the inspection point quantities to production planning when you make confirmations for operations or back flush operations you can record inspection results for planned or unplanned co products if necessary the actual activties are valuated at target cost ( based on the settings in customizing in PP) in addition to the inspection point quantities and target activties (actual quantities valuated with planned times) , you can also confirm other data (for example, actual times) in a detailed confirmation for the production order.
Which of the following are covered under "quality planning" choose 2 Results recording inspection planning functions defects recording QM specific master data.
you have to carry out "inspection planning" in the automobile industry space. what cross application data will you focus on choose 2 quality info record procurement material specification customer info record batch classification.
there are multiple documents used in quality planning. Please identify the correct combination (S) of documents and document types .choose all that apply quality info record sales: Q03 quality info record procurement : Q01 additional data in material master: Q02 vendor master records: Q02.
Which of the following are true regarding "quality planning" choose all that apply in the QM component, you can execute quality inspections on the basis of inspection plans, as well as on the basis of material specifications that are valid company wide you can use the material specification to define inspection specifications for a material that are valid across all clients you assign the required master inspection characteristics to the material in the material specification you can create a time reference for the material specification.
The following specifications can only be changed at inspection lot creation choose 2 operation short-text control indicator required characteristic only control indicator optional characteristic only sampling procedures.
the following specification can be changed at inspection lot creation and in results recording choose all that apply characteristcs short text all limit pairs( upper / lower tolerance, limit pairs 1 and 2, plausability limits) target value selected set.
regarding "inspection lot completion" which of the following hold true. choose 2 a usage decison specifies whether the lot is accepted or rejected it is not possible for the system to calculate quality scores for the material even once the inspection results have been recorded, the inspection lot is not completed with the usage decision the system can automatically make inventory postings on the basis of the usage decision.
The digital signiture enables you to meet the security requirements stipulated in the good manufactoring practices with regard to the execution of the these transactions. The digitial signiture ensures that choose 2 a transaction is only performed by users with special authorization the user cannot be uniquely identified but there cannot be any forgories the users name, the signed transaction, the time and date are documented and cannot be forged the users name, the signned transaction only and not the time and date are documented.
you can define the procedure for caluculating the qm score in customzing and store this procedure in the inspection set up in the QM view of the material master. The following calulation procedures are available. choose 3 quality score based on the share of scrap in the inspection lot quality score based on the maximum share of scrap for the characteristics quality score based on the weighted share of scrap for the characteristics QZK from the usage decision code.
A dynamic modification rule contains the definition of the inspection stages, the dynamic modification time, and the conditions that lead to an inspection stage change. The functions for maintaining and displaying dynamic modification rules are primarily contained on 3 screens.Please select what are appropriate for these screens. choose 3 on the initial screen, you enter the indentifier for the dynamic modification rule On the header data screen, you maintain a shorttext and the blocking indicator on the inspection stages screen, you edit the inspection stage data and can also create the rules for inspection stage change on the screen on the inspection stages screen, you edit the inspection stage data but cannot create the rules for the inspection stage change on the screen.
In case of " quality levels" , the following information (among other data) is contained in the quality level at the header or characteristic level. choose 2 The levels of inspection through which the process passes the number of inspection that have occured since the last stage change the number of inspection that were unsuccessful the number of inspections that have occured including the last stage change.
The quality planning componet allows you to. choose 3 manage quality information for materials, vendors, manufactorers but not customers monitor the QM systems of manufactoers and vendors plan a source inspection at the vendors premesis and trigger this inspection before the delivery date plan inspection for goods reciept, stock transfers, for production orders, for predefined inspection points, in shipping when deliveries are created and plan recurring inspections.
quality inspection has in built control mechnism for choose all that apply inspeciton set up quality assurance agreements and sales technical delivery terms quality assurance agreements in procurement.
When you make the usage decision, you decide whether to accept or reject the goods in the inspection lot based on the results of the inspection. While you are in the transaction for the usage decision, you can also choose all that apply record defects activate quality notifications confirm activities for QM orders make stock postings.
The following " quality certificates" can be created choose 3 certificate of conformity certificate of analyis work center certificate work test certificate.
the prerequiste for "enhanced certificate processing" is for the certificate type, set the "enhanced certificate processing" indicator Set the "enhanced certificate processing" indicator for the certificate group, there is no pre requisite for this and this cannot be set in configuration there is no concept like "enhanced certificate processing".
Certificate processing in goods issue covers Choose 2 inspection lot processing at goods issue certificate planning work test certificate certifcate processing.
The output of characteristics data for materials in production chain can refer to. choose 3 finished products packaging materials semi-finished products raw materials.
A certificate type. choose 2 can describe the general features of a certificate cannot contain control data for certificate processing in the procurement process cannot be linked to a user status profile for maintaining the certficicate profile can be based on standards.
The certificate profile controls choose 2 lot selection the selection and order of the characteristics displayed on the certificate the selection of the characteristics displayed on the certificate and not the order the order of the characteristics displayed on the certificate and not the selection.
you define the following data for characteristics that you want to print on the certificate, in the certificate profile on the characteristic data screen or on the characterictc detail screen. choose all that apply The output strategy in case of a skipped characteristic the data origins for results, specifications, and short text the characteristic category the order in which the charactersitics are to be displayed.
What is true regarding certificate creation? choose 2 the delivery item certificate is dispatched to one or more reciepients ( partner functions) the data for a certificate cannot be obtained from then sales order, delivery note, material master, batch , inspection lot the system can transfer inspection results to a batch. the results can then be used in an order or delivery for batch determination the characteristic results data does not originate from inspection lots and or batches.
the following recording types are available for quantitative characteristics choose 3 summerized results recording ( for example, mean value) classed recording time phased recording single value recording.
Process optimized results recording enables flexable tabluar characterstic processing. You can record inspection results exactly as required by the recording process and work center. In the standard system, the following recording options are available. choose 3 Results recording for a master inspection characteristic for all inspection lots and operations Results recording for several inspection points ( physical samples, equipment) in one inspection lot and operation Results recording for inspection characteristics for all inspection lots and operations results recording for single inspection poinnt in one inspection lot and operation.
in a quality notifcation for a customer complaint, you can specify one or more reference objects. a reference object has a relationship to the problem in a quality notification. a customer complaint may include the following reference objects: choose 3 vendor customer inspection lot device data.
the system records the changes you make in a notification in the action log. the following are included choose 3 when were the changes made who made the changes data changes for the selected fields but not status' changes status' changes for the selected fields.
the document flow can directly display the following objects: choose 3 quality notification material master inspection lot sales order.
what are the statuses that a quality notification can have: choose 2 user statuses user define statuses system statuses system define statuses.
you can define default values for users for the following data (quality notifications), choose 3 general data (for example, notification type, reference object, or contact person) plant maintenance data (for example, work orders) sales and distrubution data (for example, sales organization) purchasing/internal data (for example, purchasing organization or work center).
which of the following hold true "quality certificates". choose all that apply a quality certificate verifies the quality of goods the certified chemcial or physical properties of the goods can be recorded as inspection results you can create general certificates you can create customer specific certificataes whose contents and layout are modified to meet customer requirements.
The notificstions enable you to. choose 3 describe a problem and define the reference objects that are effected estimate the time required for processing problems on the QM order Compile a list of recorded notifications for processing or for evaluation monitor the progress of corrective actions using status management.
An audit object is a combination of choose 3 work area organizational unit work center product.
In audit management, the information relevent to the data elements become available if the audit object can be defined by data elements from repository resulting from the information record maintained audit object can be defined by data elements from repository such as combination of supplier and material audit objects are cleared through the quality management processes pre-audit approvals are in place.
Which of the following are true regarding "audit management" choose 2 You can employ interfaces as required, such as XML interface but not for transfer of question list You can define official documents, materials, notes, texts and personal input with the data objects used in audit management You can determine the relevant partners for each auditing phase and comminicate with them audit management is not applicable at normed standards.
In procurement, the Qm component has functions for managing, controlling, and processing the following objects. choose 3 Material quota arrangement material and vender vender and manufactorer.
The QM component has extensive applications in the procurment area of SAP. the vender management can be done through this. What are the activities which can be taken care of by QM? choose 2 evaluation of Vendors but not selection release of vendors selection of vendors creation of vendors.
The quality information record procurement contains data relating to. choose all that apply vendor release certifcate control certification quality assurance agreements.
on the basis of the vender or manufactoer quality information stored for a particular material the purchasing department can draw on quality related information but not the standard criteria ( price, and so on) when selecting a vendor the purchasing department can draw on quality related information in addition to the standard criteria (price, and so on) when selecting a vendor the purchasing department can draw on quality related information even if the material has not been activated from quality point of view the purchasing department cannot draw pricing related information from the info records.
you store the quality based control information for the combination of vendor or manufactorer and material in the quality information record procurement. choose 3 release periods certificate processing but not inspection control release quantity release status type (model, vendor of regular deliveries etc).
QM at goods reciept controls whether. choose 3 the goods are posted to inspection stock inspection lots are created at goods reciept the delivery or invoice is to be blocked as a result of a complaint none of the above.
Which are the salient in which SAP-QM application component supports sales and distribution processes. choose 2 quality inspections for a delivery( dependant on sales orginization, customer and material) quality notifications for a delivery ( with reference to sales orginization, customer and material) Management of purchasing information records Management of customer terms of delivery.
If a customer master record has been created for a customer, you can use the quality information record in sales to define inspection relevent specifications for the customer these specifications apply to all materials that are delivered to the customer and include the control paramters quality inspection, delivery category and documents these specifications dont apply to all materials that are delivered to the customer and includes only those which where the inspection lot was cleared lastly these specifications dont apply to all materials that are delivered to the customer and includes only those which where the inspection lot was passed lastly These specifications apply to all materials that are delivered to the customer but dont include the control parameters as there is a different provision for this inclusion.
If a delivery for a product or a material is created, then QM automatically generates an inspecton lot for the inspection relevent delivery items a delivery item can be inspection relevent even if it has not been so indicated in the master record a delivery item is inspection relevent if the corresponding control paramaters are active in the sales processes and in QM if the delivery is not recieved, the delivery item doesnt become inspection relevant when a delivery is created the quality relevant settings start to apply.
batch managment words in tandem with the quality in managemente processes choose 2 in case of batch management, there cannot be any autocreation of inspection lots if a delivery is made up of batch requirement materials, partial lots can be automatically formed for the inspection lot the inspection of the individual batches is carried out with reference to the relevant partial lot for batch management to work properly, the lot has to be full.
you record the problem in a quality notification for a customer complaint (notification orgin Q1) and then use the functions of the quality notification in integrated action box to: choose all the apply create a repair order post a goods movement to the appropiate stock execute a technical inspection confirm the result of the technical check to the repair order and complete the notification.
in the sales quality information record, one can choose 3 specify the material for general inspection processes but not material specific ones enter an additional short or long text define customer specifications manage a relation between customer and the material from quality point of view.
when the quality certificates are created, the system retrieves information from its environment, this includes data from choose 2 quality management (inspection lot, usage decision, inspection results) materials management (delivery) sales and distrubution (sales order) production planning (batch master).
in SAP, there is a provision to create quality notification for a production order which of the following hold true regarding this provision, choose 3 you can do so from the operation confirmation for the production order the transaction 'CO11N' is blocked and this provision due to quality restrictions if notificatoins already exist for the production order (for example, notifications related to defects recording), then you can process these notifications if you are creating a new quality notification, you can freely define the notification type.
the QM scenarios that can be applied in the production area (process/descrete manufacturing). the basic data for QM includes choose all that apply inspection characteristics inspection methods catalogs basic data for sample determination.
what all hold true for process industries with reference to the quality managemente area, choose all that apply you can integrate the QM inspection characteristics into the work scheduling you can integrate the QM inspection characteristics into the production processing activities you can create the characteristics (inspection characteristics) for a production operation you can create the characteristics (process characteristics) for a production operation.
regarding sales order creating in a process industry scenario what all apply, choose 3 sales order is not relevant to the process industry scenario sales order is created using a material variant a sales order is created with make to order (MTO) a sales order is created using product describing attributes.
which is true regarding physcial sample drawing physcial sample drawing can be subject to a seperate confirmation process using a sample scheme physcial sample drawing can not be subject to a seperate confirmation process as it is integral part of the whole process physcial sample drawing can be subject to a seperate confirmation process using a status scheme no seperate confirmation proccess can be applied to physical sample drawing unless and until it is a failed case.
in sample drawing procedure the following are applicable choose 3 pooled samples primary samples standard samples reserved samples.
subpopulation that is taken from a population and that relfects the quality of this population the number of physical samples is always fixed the number of physical samples cannot be determined on the basis of sampling scheme the number of physical samples can either be fixed or determined on the basis of a sampling scheme the number of physical samples can either be fixed or determined on the basis of a quality record scheme.
the sample drawing item contains instructions relating to choose all that apply sample categories number of physical samples physical sample sizes lot container for inspection lot.
sample data records contain different data. the header part of the data contains choose 2 sample category material document number status information manufacturer.
physical sample drawing data of a sample record covers information about physical drawing. this can cover choose 2 status of the physical sample sample type lot sample container unit storage duration.
you use a sampling scheme if you want to choose all that apply determine the sample size on the basis of the lot size, inspection severity, or combination of inspection severity and AQL store how a decision is made to accept or reject a characteristic determine the number of physical samples based on the lot size determine the number of physical samples based on the number of containers in an inspection lot in sample management.
you can create sampling schemes choose 3 for variable inspections based on the S method without valuation parameters, if you use the sampling scheme in a sample drawing procedure or in a sampling procedure that calls for a sample calculation without a task list for attributive inspections without valuation parameters, if you use the sampling scheme in a sample drawing procedure or in a sampling procedure that calls for a sample calculation including a task list.
depending on the valuation parameter used, the sampling plan consists of choose 3 the sample size, acceptance number, and rejection number for attributive inspections the sample size and G-factor for variable inspections the sample size and K-factor for variable inspections the sample size if "without valuation parameters" was specified.
you use sampling schemes wihtout valuation paramters to determinet he sample size when you inspect without a task list in choose 2 lot sizing procedures sample- drawing procedures sampling procedures sampling authorization.
When you evaluate the inspection results of dependent multiple samples, you have the following options choose all that apply the sample is accepted immediately the sample is rejected immediately a clear valuation of the sample cannot be made because the number of nonconforming units or number of dects inthes ample is higher than the acceptance number and lower than the rejection number the system uses the assigned sampling scheme to determine the next sampling plan and displays this in a dialog box.
stability planning choose 2 create inspection lot for the inital sample define storage condition store stability samples perform initial test.
the stability study process consists of these main phases initial test, stability planning, stability test initial planning, stability test initial test, stability planning none of the above.
the overall stability study process supports the following activiites creating the stability study creating, confirming, but not testing the initial sample as that is taken care through the "test data management" planning the stability tests performing the stability tests.
the basis of stability study is quality inspection plan quality notification quality information record quality management plan.
if you do not have to complete the stability study as planned. you can choose 2 cancel the stability study at any time for one particular storage condition but not for all storage conditions cancel the stability study at any time for one particular storage condition or for all storage conditions deactivate the stability study for selected storage conditions but not for all storage conditions deactivate the stability study for selected storage conditions or for all storage conditions.
when you complete the stability study choose 3 they system sets he user status COMP (completed) in the sability study. this status cannot be revoked and it prevents any other user statuses from being set in the study the system deactivates the testing schedule the system locks all of the physical samples that belong to the study (initial sample and stability samples) including any outstanding inspection lots remaining the system locks all of the physical samples that belong to the study (initial sample and stability samples). if there are any outstanding inspection lots remaining, you must cancel these or make the usage decision for them.
all physical samples processed in a stability study are associated with exactly one physical sample drawing number, which is created automatically by the system when you create the intial samle this physical sample drawing number applies to all of the physical samples that are crated and processed only during the active course of a stability study this physical sample drawing number applies to all of the physical samples that are created and processed over the entire course of a stability study this physical sample drawing number applies to all of the physical samples that are created but not processed during the active course of a stability study this physical sample drawing number applies to all of the physical samples that are created but not processed during the entire course of a stability study.
test equipment management uses functions from which area sales and operations planning materials requirement planning plant maintenance project management.
test equipment is included in the inspection plan or task list using the funtions for test equipment planning production planning production resources/tools maintenance planning.
the plant maintenance functions include choose 3 managing master data monitoring managemente plans editing maintenance plans and strategies calibrating.
in QM, you process calibratoin inspections. this means choose 3 inspection characteristics are created results are recorded inspection lots are created (inspection lot origin 10) the usage decision is made.
you can manage test equipment as choose 2 equipment material quality record production planning tools.
you process the inspectoin lot in QM that was created by the plannin activities and release of the maintenance order in plant maintenance the items of equipment assigned in the maintenance item are copied into the inspection lot as objects to be inspected the items of equipment assigned in the maintenance item are copied into the bill of material as objects to be inspected the items of equipment assigned in the bill of materials are copied into the inspection lot as objects to be inspected the items of equipment assigned in the bill of materials are not copied into the inspection lot as objects to be inspected.
Report abuse Consent Terms of use