option
Questions
ayuda
daypo
search.php
ERASED TEST, YOU MAY BE INTERESTED ON SAP Activate Project Manager Test
COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP Activate Project Manager Test

Description:
SAP Activate Project Manager

Author:
Deepak SCloud
Other tests from this author

Creation Date:
18/05/2020

Category: Others

Number of questions: 80
Share the Test:
New CommentNuevo Comentario
Ely_user ( uploaded 3 years )
Report comment
This exam does not help. Very different questions in the actual exam. I just got my certification and it was only because I studied and I have been involved with the Agile methodology, not because of these questions.
Ely_user ( uploaded 3 years )
Report comment
Hello, could you tell me which code of exam are these questions for? is it C_ACTIVATE 12? Thanks!
AVATARaddii ( uploaded 3 years )
Report comment
is it activate12 and has got all the questions from the exam?
Content:
How do you gain access to the SAP Activate Methodology Jam site? Register on SAP Service Marketplace Send e-mail to SAP contact address Submit e-mail address via on-line form Join SAP S/4HANA group on SAP Community Network.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition?(Choose Three) Operations impact analysis Custom code adjustment Delta configuration Development system migration Sandbox system migration.
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition? End-to-End Integration Test User Acceptance Test Unit Test Technical System Test.
What do you do during an iterative approach to build a solution? Build the solution module by module Deliver a prototype of the solution Provide a working solution only at the end of the release Include frequent inspection check-points.
Which deliverable is specific to on-premise and NOT for the cloud? Technical Design Solution Knowledge Transfer Adaptation Specification Learning Needs Analysis.
Which activities are critical for delivering Agile projects?(Choose two) Retrospective agenda creation Sprint planning Release planning Blueprint scheduling.
Which key deliverable includes the development of RICEFW objects? Development Build Enhancement Delivery Sprint Execution Custom Extensions Management.
In Which phase does the Transition to Operations work stream start? Explore Realize Deploy Prepare.
What is the purpose of the Solution Validation activity in the Explore phase?(Choose Three) To verify technical installation To identify gaps To log additional scope items To challenge changes to standard To educate project participants.
What is the most granular level of the methodology you can view in the Roadmap Viewer? Scenario Task Deliverables Phase.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? SAP Jam SAP Solution Manager SAP Implementation Assistant Roadmap Viewer.
Which content packages are available in the SAP Package Library?(Choose Two) SAP Activate Methodology SAP Best Practices Solution Builder Rapid Deployment Solutions.
In which SAP Activate methodology phase does the team complete the Integration Validation? Explore Realize Deploy Prepare.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? During the daily SCRUM meeting During the sprint retrospective During the sprint review During user acceptance testing.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Project Charter Project Documentation Knowledge transfer to end users Learning plan.
Which activity helps the project team to add the user stories to the product backlog? Planning the User Acceptance Test Preparing a Project Schedule Conducting the Solution Validation Assessing Project Risks.
Which key activities does the Guided Configuration support you with?(Choose three) Manage roles of configuration users Train new users Create test data Test configured processes View solution scope.
What are the responsibilities of the Product Owner in release and sprint planning?(Choose two) Analyze the functional and technical dependencies between the user stories Define objectives for each release Prioritize backlog user stories by business priority Estimate the backlog user stories.
What is the purpose of the SAP Activate Methodology? To enable access to the SAP ecosystem To accelerate the initial implementation of SAP S/4HANA To provide end-to-end integrated application lifecycle management To manage project and solution documentation.
Who determines the tasks that are required to complete the committed backlog items in a sprint? Project Manager Product Owner Project Team SCRUM Master.
What is the purpose of the scrumboard?What is the purpose of the scrumboard? To document the results of integration testing To manage the resource load To show the functional breakdown of the solution scope To visualize team progress.
Which of the following is a Key Deliverable of the Prepare phase? Solution Scope and Value Determination Change Impact Analysis and Communication Plan Baseline Build Release and Sprint Plan.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise?(Choose three) For the cloud edition, there is an additional work stream for integration with on-premise systems For the cloud edition, there is an additional Q-Gate for integration with on-premise systems For on-premise, there is an additional Q-Gate for system installation For on-premise, there are additional deliverables for the system setup.
What are deliverables of the Application: Integration work stream in the prepare phase? Fit/Gap Analysis Data Cleansing Security Checks Adaptation Specifications Network Connectivity Checks.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? A. a. Code adjustment B. Detailed System Assessment C. Production Readiness Check D. Validation of Migration E. a. Production Readiness Check F. Detailed system Assessment G. Code Adjustment H. Validation of Migration I. a. Detailed system Assessment J. Code Adjustment K. Validation of Migration L. Production Readiness Check M. a. Detailed system Assessment N. Production Readiness Check O. Code Adjustment P. Validation of Migration.
Which of the following tasks are part of the Production support after the Go Live key deliverable?(Choose two) Resolve issues identified during the Hyper Care period Provide further training to customer end users Set up the Operations Control Center Perform a Technical systems test.
What is the key characteristic of Agile project delivery? Frequent and detailed project scheduling Formal and detailed documentation Iterative build with frequent inspections Frequent Quality Gates.
Which collaboration features can SAP Activate Jam users access?(Choose two) Ask questions Update Key Deliverable wikis Tweet questions Comment on documents.
In what respect is SAP Activate Methodology different from the ASAP Methodology? Supports cloud deployments Supports only new implementations Leverages iterative incremental build Includes Fit/Gap analysis instead of Blueprint.
Which content is made available after you activate SAP Best Practices for a new financial implementation?(Choose two) Implementation Guide Online help Pre-configured business processes Standard chart of accounts.
Which of the following tasks are required in the Prepare Phase?(Choose three) Train the project team Set up the infrastructure to support the project Define the communication plan Approve the test strategy Identify relevant SAP Best Practices.
Which tools does SAP Activate provide to support Guided Configuration?(Choose three) Solution Builder Expert Configuration Self Service Configuration SAP Solution Composer Model Company.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Prepare Prepare Realize Deploy.
How are the build and test tasks planned and executed in the Realize phase? By using the sprint backlog list as input for each iteration. By executing regression tests after each iteration With Q-Gates for sign off after each iteration By using incremental build in fixed-scope iteration.
What can users do in the Roadmap Viewer tool? Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Download full SAP Activate methodology content for use off-line Create a customer-specific version of SAP Activate Methodology.
How can SRCUM teams be organized? By job title By work stream By project phase By project governance level.
What is the objective of a sprint retrospective meeting? Define the stakeholder management approach Review and prioritize the backlog Provide formal feedback to the project manager Improve the SCRUM process.
What tool do you use to configure an SAP Business Suite on-premise solution? ABAP Workbench SAP Implementation Guide Configuration Composer Expert Configuration.
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase?(Choose two) Sprint Backlog Template RICEF Specification Template Solution Validation Workshop Quality Gate Checklist.
What are the benefits of the SAP best practices?(Choose three) Fast time to value Predictable results Simple on-boarding to cloud Fixed organizational structure Reduced functional scope.
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Navigate by assigned Delivery Mode Navigate by RACI matrix accountability Navigate by work stream Navigate by Project Team Member Role.
What does a project jump-start include for a new implementation of SAP S/4HANA onpremise edition? SAP Best Practices Rapid prototyping Project team training Full project SCRUM.
Which of the following content best outlines the scope of the Integration Test? Prototype Delta/gap solutions Data flows with non-SAP application Prototype Delta configuration Data flows between SAP solutions Solution baseline Delta/gap solutions Data flows with non-SAP application Solution baseline Delta configuration Data flows between SAP solutions.
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? SAP Implementation Assistant SAP Activate Methodology Guided Configuration SAP Best Practices.
What are the three pillars of SAP Activate?(Choose three) SAP Activate Methodology SAP Best Practices SAP S/4HANA in-memory database SAP Solution Manager Guided Configuration.
Which criterion does the Product Owner use to sequence the product backlog? Resource availability Complexity Business priority Relative effort.
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Deploy Explore Prepare Realize.
According to the Definition of Done, which activity must be completed for each sprint? End user training must be delivered Solution must be built and configured in the development system (DEV) Functionality must be tested in the Quality system (QAS) Functionality must be released to the business.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? Value Audits Production Support Plan Value Determination Change Management Plan Scope Validation.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? SAP Hybris SAP S/4HANA Cloud Edition SAP S/4HANA On-Premise Edition Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.
Who determines the priority of user stories in the backlog of an Agile project? Project Manager Project Team SCRUM Master Product Owner.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Activate and apply SAP Best Practices content with the self-service configuration UI Activate and apply SAP Best Practices with SAP Solution Manager Apply SAP Best Practices with the Configure your Solution application Assemble and apply SAP Best Practices to the system.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Business Process Mapping Value Determination Custom Extension management Fit/Gap Workshops.
What are the responsibilities of the Project Team on level 4 in the picture below?(Choose two) Set Project policy, standards and oversight Set business priorities, goals and objectives Identify and resolve issues and risks Perform status reporting and communication.
In which phase you execute the User Acceptance Test? Build and Test Deploy Final Preparation Realize.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Explore Deploy Realize Prepare.
In which phase do you create a prioritized list of user requirements? Realize Explore Prepare Deploy.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Deploy Explore Prepare Prepare.
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Available project resources Test strategy Definition of Done Overall project schedule.
What are key characteristics of the implementation approach in SAP Activate Methodology?(Choose three) Premium engagement ready On-premise only Fixed scope Validate solution Start with SAP Best Practices.
What does SAP Activate recommend to keep team members informed and aligned? Daily status meeting with project manager Daily team stand-up meeting Daily e-mail status updates to project manager Daily progress review meeting with sponsor.
What do you do during Sprint Execution? End a sprint when the sprint backlog items are all complete Measure the sprint progress with a percentage complete report Hold a retrospective at the end of each week Present status of selected user stories in the sprint scope on a scrumboard.
Which of the following building blocks are part of the SAP S/4HANA platform?(Choose two) SAP Fiori UX SAP HANA in-memory database SAP Solution Manager LOB Cloud Solution.
What is the focus of a SCRUM of SCRUMS in an Agile context? Best Practice adoption Communication to the Project Management Office Backlog management Integration topics.
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Key Deliverable Scenario Work Stream Task.
What is SAP Activate? A step-by-step instruction on how to remove from SAP best practices to your custom solution A methodology for each of the deployment modes (cloud , on-premise, hybrid A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions A combination of SAP best practices , methodology, and guided configuration.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Start with executable content Limited involvement of business stakeholders Waterfall approach Design-based.
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? Data migration End-to-End walkthrough Readiness check Solution validation.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition?(Choose two) Solution Activation Optimize software Change Control Management Training delivery Access organizational and production readiness.
Which new project roles are introduced with the SAP Activate Agile methodology?(Choose two) SCRUM Master Product Owner Integration Lead Design Thinking Coach.
What is the purpose of a firm-up sprint? To demonstrate functionality from previous sprint To perform sprint testing To revise a release plan and sprint plan To run end-to-end integration test.
In which tools can the project team across the SAP Activate Methodology content including accelerators?(Choose two) SAP Community Network Roadmap Viewer SAP Jam SAP Service Marketplace.
What do you do during post cutover? Setup Operational Support Perform the Verification Session of the SAP Going Live Check Perform Technical System Test Conduct Organizational Readiness Check.
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? Custom code Adjustment planning Data aging configuration Non-production systems migration Value determination.
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? A. a. Conduct Solution Validation workshops B. Set reference value C. Prioritize initial backlog D. Conduct Delta Design workshops E. a. Set reference value F. Prioritize initial backlog G. Conduct Delta Design workshops H. Conduct Solution Validation workshops I. a. Conduct Solution Validation workshops J. Conduct Delta Design workshops K. Set reference value L. Prioritize initial backlog M. a. Set reference value N. Conduct Solution Validation workshops O. Prioritize initial backlog P. Conduct Delta Design workshops.
What technique helps agile project teams to prioritize a large, flat backlog? Fit/Gap Analysis User Story Mapping Retrospective Planning Poker.
When do you perform User Acceptance Testing during the Agile Build? Before Integration Testing During each Firm-up Sprint After each Sprint After Integration Testing.
What is the minimum number of quality gates mandated by the SAP Activate methodology? 0 3 4 5.
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity Product Owner's relative estimate of the effort that will be needed to implement the user story.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase?(Choose three) Design for the Gaps and Deltas Baseline Build Data Migration Approach Validation Workshops Solution Scope and Value Determination.
Report abuse