Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONSAP PP Produção e Manufatura 2

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP PP Produção e Manufatura 2

Description:
Simulado do módulo PP planejamento e manufatura

Author:
AVATAR

Creation Date:
28/01/2016

Category:
Others

Number of questions: 61
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
You can use Supply Chain Planning in ECC to analyze demand program and check its feasibility True False.
Consumption-based planning is based on historical consumption values and uses forecasting or statistical procedures to determine future requirements True False.
Demand Management is the management of __________ Independent requirements Dependent requirements Planned orders Production orders.
__________ strategies are designed for planning the procurement of components by planning the finished product in the net requirements segment Make-to-stock production Make-to-order production.
Which of the following parameters are determined by the planning strategy? Planned independent requirement type Order Type (production order or process order) Customer requirement type Procurement type.
In pure make-to-stock production strategy, you determine the demand program without reference to sales orders True False.
In production by lot size (strategy 30), the requirements for the finished product are added up for MRP. True False.
Identify the planning strategy that includes the settings for the consumption of sales orders and planned independent requirementes from the material master of the finished product Planning Strategy 10 Planning Strategy 40 Planning Strategy 70.
Identify the consumption type in which the sales order consumes planned independent requirements after the customer requirement's date Forward consumption Bakcward consumption Forward and backward consumption.
With the subassembly planning strategy 70, the consumption periods are calculated on the basis of the dependent requirements or reservations True False.
Which individual/collective indicator settings can be used in make-to-order production to ensure sales order stock of a component? 1 2 Blank.
Identify the strategy in which procurement or production is triggered by the sales order only. Strategy 20 Strategy 10 Strategy 40.
The planning without final assembly strategy enables you to reduce delivery times. True False.
Planned orders with order type VP can be used for the following purposes External Procurement Subcontracting Stock Transfer Final assembly before sales order.
Assembly processing is a form of sales order processing. The procurement element are created upon creation of the sales order item True False.
Which of the following is true for assembly processing carried out dynamically? Partial Deliveries Lost (direct) reference to the sales order One assembly order per sales order item Several assembly orders per sales order item.
Identify the strategy through which the planned independent requirements are reduced by the goods issue for the production order for the finished product Strategy 59 Strategy 30 Strategy 70 Strategy 74.
With strategies 70 and 74 the assembly's planned independent requirements are reduced by the goods issue for a production order or cost center True False.
A strategy group can contain a main strategy and up to seven alternative strategies True False.
Identify the areas where availability check happens Classical sales and distribution applications Planned orders from production planning Production or process orders from production Goods issue from production.
Material requirements planning takes current and future sales as its reference point True False.
Identify the components that the system uses to plan the external procurement quantity Planned order Purchase requisition Production order.
The setting in plant parameters takes priority over the setting in the MRP group True False.
If materials were created before the MRP run for a plant was activated, you must create an entry in the planning file for all MRP-relevant materials in this plant. True False.
Identify the level at which you can execute the planning run Plant level Individual material level Purchase group level.
Indentify the targets that can be achieved through parallel processing Improved performance Robustness Increased safety stock level.
When you start the planning run, which parameters can you set on the entry screen? Define the planning type as regenarative planning or net change planning within the total horizon or within the planning horizon only. Determine whether or in which period purchase requisition and schedule lines and required as a result of the planning run Define whether the planning run is to generate MRP lists Define requirements classes.
You want the system to plan a BOM structure interactively and step-by-step. Which optic will you use? Singles item interactive Single item multilevel planning with display results before they are saved Single item multilevel planning with simulation mode.
During __________ planning, the system explodes the material's bill of material and creates and plans the dependent requirements of the assemblies and components Single-item, multilevel Single-item, single-level.
You can define the firming period using the planning time fence or a manual firming date True False.
The firming entries for the planned order or the components of the planned order can be changed ________ Manually Automatically Depending on the requirement date.
The lot-size calculation is executed on the basis of the net requirements and a calculation is made for a procurement proposal True False.
During net requirements calculation, the system checks whether the requirements can be convered by ____________ and ____________ Available warehouse stock Fixed dispatched receipts Independet requirements.
When the inventory is lower than the defined safety stock level, which of the following condition happens? Safety stock increases the stock available for planning System replenishes the safety stock during the planning run.
The safety time can be defined with the following option Safety time should not be taken into account (indicator = blank) Safety time should only be taken into account for independent requirements ( indicator = 1) Safety time should be taken into account for all requirements (indicator = 2) Safety time should be taken into account for dependent requirements (indicator = 3).
Idenfity the different groups of procedures in the lot-size calculation Static lot-sizing procedures Period lot-sizing procedures Optimum lot-sizing procedures Dynamic lot-sizing procedures.
Optimizing lot-sizing procedures optimize the total costs resulting from ordering (order and setup costs) and storage costs. True False.
The procurement type is used to determine whether a material is to be produced in-house or procured externally True False.
The _________ specifies how the receipts should be distributed among each source of sypply. Quota arrangement Procurement type Procurement proposal.
The positive lead time is taken into account in lead-time shceduling True False.
Which of the following are individual time portions from routing? Wait time Lead time Labor time Machine time.
If the system does not find a valid BOM in the selected usage, identify the next action The system selects the usage with the next highest priority and carries out the check for valid BOMs The system selects the usage with the next lowest priority and carries out the check for valid BOMs.
When determining routing, the system uses the __________ maintained in cutomizing to search for a routing with usage and status of the highest priority Scheduling profile Strategy Group Selection ID Application ID.
The MRP list is static and the stock/requirements list is dynamic True False.
Which of the following functions in the MRP list and Stock/requirements list evalutions groups the planning results into periodic buckets? Period Totals Display Filters Selection Rules.
In repetitive manufacturing, orders are generally planned according to quantity and period True False.
Changes that you make in the planning table are not written to the database unless you ________ them Upload Save Convert.
Which of the following indications are true for exception messages? Newly created order proposals from planning Dates in the past (for example, opening date) Problems with BOM explosion or scheduling Planned independent requirements.
Indentify the MRP elements through which the order report evaluation enables you to gain an overview of the status of all BOM levels Sales order Production order Planned order Safety stock.
The stock days' sypply enables you to recognize potential shortages at an early stage True False.
Master production scheduling is executed with the same logic as material requirements planning. True False.
Identify the objectives of long-term planning is to simulate different versions of te demand program. True False.
A planning scenario must be released before long-term material requirements planning can be carried out True False.
Long-term planning can be executed as __________ and _________ Total Planning Single-item Planning Collective Planning.
Idenfity which of the following items can be transferred to the simulative planning area Active or inactive planned independent requirements versions Sales orders Firmed, operative planned orders Unfirmed, operative purchase requisitions.
The operative demand program results from the total of all active planned independent requirement versions True False.
When companies want a very simple process of transferring stock from one plant to another, they can make use of the on-step procedure True False.
Idenfity the plant in which the procut's bill of materials is created Planning Plant Production Plant Issuing Plant.
Subcontractor material requirements planning areas are used to plan the staging of components for individual subcontractors True False.
Using MRP areas, planned independent requirements can be created for each MRP area. True False.
Idenfity the area in which the sales orders for make-to-order production are always planned Stock/requirements area Goods issue area Plant MRP area.