Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONMaintenance Certification SP

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Maintenance Certification SP

Description:
Maintenance Practice

Author:
AVATAR

Creation Date:
09/06/2017

Category:
Others

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
Which of the following are prerequisites for business completion? (Choose two) The order must have actual costs. The order must be fully settled. The balance of the order must be zero. The order must have planned costs. .
What information does the value category provide in the maintenance order? The costs details for individual technical objects The costs by work center The material costs by valuation category A summary of costs for multiple cost elements .
Which of the following Customizing settings is required to assign a notification to a maintenance order operation? Assignment of operations to all object list entries active Assignment of order type to notification type Maintain indicator for notification data on order header Create default value profiles for general order data.
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type? Priority Maintenance activity type Maintenance planner group Main work center.
A maintenance technician replaces a defective counter with a new counter. Before the users can create a standard measuring document for the new counter, what step(s) must they perform? Create a new technical object to represent the new measuring point. Create a special measuring document and set the Counter Replacement indicator. Dismantle the old measuring point and create a new measuring point. Create a new measuring point and change the measuring point from which the measurement reading was transferred. .
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category. Where do the material costs appear in the value categories for the order? In the overhead value category In a new, automatically created value category In the unassigned value category In the internal activity value category .
Which of the following always produces up-to-the-minute costing information for maintenance orders? A standard analysis from the Plant Maintenance Information System (PMIS) A standard query in SAP NetWeaver Business Warehouse A maintenance order list A shift report based on shift notes .
Which task list can have both external and internal number assignment for the task list group number? Bill of material task list Equipment task list General task list Functional location task list.
Which of the following is a function ofdeadline monitoring (transaction IP30)? Generate a Logistics Information System (LIS) report for scheduled maintenance items within a specific period. Convert maintenance notifications intomaintenance orders within a specific period. Convert maintenance calls into call objects within a specific period. Generate a Logistics Information System (LIS) report for all overdue maintenance calls. .
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications. Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated? REL (Released) ATCO (All Tasks Completed) TECO (Technically Completed) NOCO (Notification Completed).
Which of the following control characters is available in the edit mask of the structure indicator? D (numeric characters) M (alphanumeric characters) Y (special characters) A (alpha characters).
Which of the following is a benefit of SAP Solution Manager? It reduces the cost of implementation and continuous improvement. It enables central SAP NetWeaver Enterprise Search within all SAP systems. It provides common master data management within all SAP systems. It reduces the number of systems and operates only one central IT landscape.
Which account assignment category can you specify in a settlement profile? Maintenance planning plant Functional location Equipment Material.
You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operationsis already partially confirmed. Which system statuses can the order header display before all operations are finally confirmed? (Choose three) TECO PCNF CRTD CNF CLSD .
How many time-based cycles can you use in a multiple-counter maintenance plan? Three Zero Two One.
What are the purposes of technical object structures? (Choose three) To support Asset Accounting in the description of fixed assets To display the total number of an asset's individual parts from a design engineering perspective To identify objects and object parts for maintenance To collect historical data for maintenance objects To enable detailed cost analyses .
What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two) The performing work center musthave available capacity data. The performing work center must have a control key with the Determine Capacity Requirements indicator set. The numeric value for Work in the order operation must be greater than 0. The operation must have a control key with the Determine Capacity Requirements indicator set.
In order costing configuration, for what is the allocation structure used? To provide a method of consolidating costs in the Plant Maintenance Information System To allocate costs to a hierarchy of maintenance technical objects To determine the cost elements that are allowed in the plant maintenance order To determine the settlement receiving elements for costs debited to the order.
Your customer uses operating hours to execute a performance-based maintenance plan. Which of the following data must you assign in the maintenance plan header? A task list for performance-based maintenance A cycle unit of measure with a corresponding characteristic from the measuring point An order type for performance-based maintenance A technical object with a measuring point.
Your customer wants to use the dynamic availability check for stock material. What data must you use to create a scope for the check? Checking group and material type Checking rule and material type Checking rule and material group Checking group and checking rule.
What does the functional location category determine?(Choose two) Whether a fixed asset from Asset Accounting can be assigned Whether you can create linear data for a functional location The partner determination procedure The functional location class .
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically. What must you do in Customizing? Define field values for PM/PS Reference Element Define field values for PM/PS Reference Element Create a revision type and select WPS-Controlled. Create a revision type and select Not WPS-Controlled.
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically. In addition to setting the reference object view inthe order or the notification, what other settings must you make? (Choose two) Set View Profiles for Technical Objects in Customizing Set the Single Installation indicator in the equipment master data record. Set the Single Installation indicator in the Functional Location master data record Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
Your customer executes deadline monitoring(transaction IP30). What happens after you insert additional call dates using the manual call function? The system restarts the maintenance plan. The system retains the normal scheduled call dates. The system fixes the next scheduled call date. The system reschedules all previous scheduled call dates.
Your customer wants to settle costs of the refurbishment process to an inventory account. What Customizing does the process require? (Choose two) Special control keys for use in refurbishment operations A specific order type for refurbishment processin A specific settlement profile for the purpose of refurbishment A specific notification type for refurbishment processing.
Your customer wants the system to generatea serial number and an equipment master upon goods receipt of a material. Which Customizing steps are required? Create a serial number profile and assign it to an equipment master. Create a serial number profile and assign it to a serializing procedure. Create a serial number profile and assign itto a view profile for technical objects. Create a serializing procedure and assign it to an equipment master.
Which steps must you perform to activate the usage history for equipment? (Choose two) Activate the usage history for the equipment category. Set the Usage History indicator for the maintenance plant. Define history-related fields for the relevant equipment reference category. Activate the usage history for each piece of equipment in the master record.
Where do you define initial and subsequent buffers for the maintenance plan strategy? In the maintenance item In the maintenance plan category settings In the maintenance package for the maintenance strategy In the maintenance plan scheduling parameters .
Your customer wants to create a component for maintenance that does not allow physical inventory. Which material type must you use? Spare parts (ERSA) Maintenance assembly (IBAU) Non-valuated materials (UNBW) Operating supplies (HIBE) .
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted? In special stock type R (refurbishment stock), after the return from the service company and a goods receipt posting In special stock type B (batch) after the return from the service company and a goods receipt posting In special stock type F (customer order stock) In special stock type O (parts provided to vendor).
Factory calendars are assigned to the maintenance plant and work center. By default, which factory calendar is used for work order scheduling? Planning plant Main work center Maintenance plant Production work center linked to a technical object.
Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan? The call horizon The early and late shift factors The early and late tolerance The cycle modification factor.
Which of the following information can the shift report display? (Choose three) Planned and actual costs for shifts Digital signatures for approval of a shift report Maintenance plans and task lists Maintenance orders and notifications Measurement documents and goods movements.
What does the scheduling period determine in the maintenance plan scheduling parameters? The duration for which the system generates maintenance orders immediately The duration for which the system generates planned or call dates during scheduling The duration for which the system generates maintenance notifications immediately The validity period of the maintenance plan.
What does the cycle set sequence in a multiple-counter maintenance plan determine? The scheduling sequence of a maintenance item The operation sequence of a maintenance order The scheduling sequence for a group of maintenance plans The operation sequence of a task list.
To which objects can you assign a user status profile? (Choose three) An order type A task list type A maintenance plan category An equipment category A notification type.
In which lifecycle scenarios can you use SAP Solution Manager? (Choose three) Retirement Operations Implementation Optimization Scoping .
What are the prerequisites for installing equipment at a functional location? (Choose two) A cost center is assigned to the equipment. A fixed asset is assigned to the equipment. The equipment category of the equipment allows the installation. The functional location master record allows the installation. .
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two) Specify the annual estimated usage for the measuring point. Activate the Measurement Reading Transfer indicator. Define a valuation code group. Create the measuring point as a counter.
When a user creates a task list using the Copy function, all the header fields transfer to the new task list, with one exception. Which field is the exception? Usage Work Center Assembly Status .
Your customer has several plants. How do you set up the maintenance organizational structure to implement centralized maintenance planning? Assign all your work centers to one of your central planning plants. Define a plant and assign it to a company code. Assign all your work centers toone of your maintenance plants. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
Which standard aggregation of data does the Plant Maintenance Information System (PMIS) use? (Choose three) By info source By characteristics By data source By date period By key figures.
How can you maintain a distribution rule? (Choose two) Manually, prior to the first settlement Automatically, according to value categories in the order Manually, after the business completion for the order Automatically, based on a combination of Customizing and object master data.
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item. How can a user override the automatic release of the order without creating a new order type? Select a maintenance planner group and set the Do Not Release Immediately indicator. Set the Do Not Release Immediately indicator in the task list header. Set the Do Not Release Immediately indicator in planning data for the maintenance item. Select a maintenance activity type and set the Do Not Release Immediately indicator.
Your customer wants to assign personnel to order operations. Which master data must exist in the system? A requirements profile A personnel indicator in the control key A personnel profile A personnel number.
What are consequences of activating alternative labeling for functional locations? You can assign a serial number to a functional location. You can change the primary functional location label and keep the old label as a historical functional location label. The company code is automatically included in the functional location label. You can change the primary functional location label and delete the old functional location label.
What does the maintenance plan category determine? The type of maintenance call object the system generates for a due maintenance call The type of technical object for the maintenance plan How maintenance call objects are generated for a due maintenance call The grouping of similar maintenance plans together for reporting.
What does the notification type define? (Choose three) The reference object view The catalog or catalog profile The scheduling type The planner group The number assignment of the notification.
What happens when you set the system status in a maintenance order to technically completed (TECO)? (Choose two) The system sets a deletion indicator for outstanding reservations. The system sets a deletion indicator for outstanding purchase requisitions. The system posts costs to the target account assignment. The system sets a deletion indicatorfor purchase orders assigned to the maintenance order.
Which of the following can you assign to a maintenance order operation? (Choose three) Asset Equipment WBS element Maintenance order Measuring point.
Which of the following components is included in SAP Solution Manager? SAP NetWeaver Business Warehouse Master data management Service Desk SAP NetWeaver Enterprise Search.
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price. How do you accomplish this? Create various maintenance activity types with the fixed prices and assign them to the work center. Define the activity types for each maintenance planning plant. Create various maintenance activity types in each work center and assign a price. Define the activity types in Controlling and assign them to the cost center of the work center.
What does the structure indicator for a functional location determine? (Choose three) The functional location type The number of characters for each hierarchy level The edit mask The functional location category The number of hierarchy levels for a particular structure.
In Customizing, to what data must you assign digital signatures in addition to the order type? Maintenance plant Work center Maintenance planner group Planning plant.
Your customer wants to subdivide the maintenance organization by production responsibility. What do you use to designate the contact person for coordination between production and plant maintenance? Plant section Production cost center Work center Controlling area .
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing. To which parameter do you assign the costing sheet? Version for cost estimates Costing type Valuation categories Valuation variant.
Which object do you use to assign numberranges for maintenance plans in Customizing? Maintenance planner group Technical object Maintenance item Maintenance plan category.
When you create a refurbishment order,which reference objects can you use? (Choose three) Functional location Equipment without serial number Material with serial number Material without serial number Equipment with serial number.
What are the prerequisites for the calculation of planned costs in an order? (Choose three) The order operations must have a control key with the Costing indicator set in Customizing. The user must save the order orexecute the Determine costs function. The cost elements must be assigned to the order type in Customizing. A costing variant for planned costs must be assigned to the order type in Customizing for order types. The costing indicator must be set in Customizing for order types.
The view profile enables you to create a customized selection of tabs for use with technical objects. Which Customizing step(s) must you perform to make a view profile available? Activate customized tabs for each equipment category orfunctional location category. Create the view profile in the master record of either equipment or functional location. Create the view profile and assign it to an object type. Create the view profile for a particular screen groupand then assign it to a functional location category or equipment category.
What purpose does the maintenance planner group serve? It determines which maintenance call object the system generates for a due maintenance call. It identifies a person or a group of persons who is responsible for planning maintenance activities for a number of technical objects. It identifies a person who is part of the main work center and who acts as the supervisor. It represents a person or a group of persons who is responsible for maintaining task lists.
Your customer uses the dynamic availabilitycheck for stock material. Where does the system check material availability for an operation? In all plants where material inventory exists Only in the plant where the material has been reserved Only in the plant where the material is flagged with the special stock indicator for maintenance stock In all plants where the material is managed with serial numbers .
A customer wants to define an order type that includes a notification when the order is created. Which Customizing step(s) must you perform? Assign the notification type to the order type according to plant assignment in Customizing. Set the indicator for notification data or order header and assign the notification type to the order type in Customizing. Set the Notification indicator for the order type according to plant assignment in Customizing. Assign the notification type tothe order type in Customizing.
Which of the following steps must you perform to customize priorities for a maintenance order? Assign a priority type to an order type. Assign priorities to technical object master records. Assign a priority type to a technical object master record. Assign priorities to order types.
Your customer needs a maintenance order type for use with Test Equipment Management in a maintenance plan. Which Customizing setting must you make for the order type? Assign an inspection lot to order type only. Create an order type for Test Equipment Management. Assign an inspection type to an order type with plant assignment. Create a plant for inspection lots. .
What are the prerequisites for order settlement? (Choose three) The order must be technically completed. The order has not been settled previously. A settlement rule must be created for the order. The order must be released. The settlement profile used in the order type must allow settlement. .
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service? A maintenance order for settlement and an outline agreement A framework order and a maintenance order for settlement A framework order and a subcontract purchase order A subcontract purchase order and an outline agreement .
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of? Planned costs overwrite estimated costs after release of the order. A specific order type in which cost estimates are activated must be used. Planned costs must not exceed the estimated costs. Upon release of the order, estimated costs cannot be revised.
What is the purpose of the usage listfor equipment history? (Choose two) To display changes to history-related fields in anequipment master record To display the list of previous equipment operators To document the number of breakdowns for an object To track where the equipment was installed.
What step activates the Warranty subscreen as part of the equipment master data record? Setting the Master Warranty indicator in the equipment master data Setting the Use-in-Equipment indicatorin the Master Warranty transaction Adding the Warranty subscreen in View Profiles for Technical Objects Adding the Warranty subscreen in the Object Information view of the equipment master data record.
Which of the following are maintenance work center functions? (Choose three) Capacity planning Production resources/tools (PRT) allocation Scheduling Costing Material planning.
What do you use to set up a refurbishment order for external refurbishment? An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated. An external operation that contains a control key for refurbishment. An order type for external refurbishment and an assignment of a material with split valuation. An order type for external refurbishment and a material item with item category External Refurbishment.
When is the latest possible point in time that you can create a settlement rule? Before technical completion Before order release After order release After technical completion.
Your customer wants to generate costing for internal activities. For which of the following can you define various rates in Activity Type/Price Planning transaction? (Choose three) Plan/actual version Cost center Period Value category Plant.
Which steps must you perform to enable the valuation of characteristics for a piece of equipment? (Choose three) Assign characteristics tothe equipment class type. Assign characteristics to a class. Create characteristics in the classification system. Assign a class to a piece of equipment. Assign a class to the equipment category.
A maintenance work order has externalprocessing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order. With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition? Work center Storage location Planning plant Maintenance plant.
What options are available in the maintenance order when you analyze costs using value categories? (Choose two) Display of costs by responsible work center Display of costs by individual operations Display of values in an alternate currency Summary of actual costs across multiple cost elements .
Users need to be able to select operations and work centers from the task list when they create a maintenance order with tasklist selection. In Customizing, how can you accomplish this requirement? (Choose two) By setting the indicators for the order type only By setting the indicators for the planning plant only By activating the work center selection indicator By activating the operation selection indicator.
How does SAP make new functions of the SAP ERP application available to customers? Via enhancement packages Via best practices Via add-ons Via Support Packages.
For which business requirements mustyou use serial numbers? (Choose two) To uniquely identify inventory material items To have a future option to track material items as pieces offunctional locations To have a future option to track material items as pieces of equipment To have the option to track batches .