Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONaleatorio sap

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
aleatorio sap

Description:
Certification

Author:
Valdevair
(Other tests from this author)

Creation Date:
26/06/2020

Category:
Others

Number of questions: 489
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
You can use Supply Chain Planning in SAP ERP to analyze a demand program and check its feasibility True False.
Demand Management is management of Independent Requirement Dependent Requirement Planned Order Production Order.
Consumption-based planning is based on historical consumption values and uses forecasting or statistical procedures to determine future requeriments True False.
________ strategies are designed for planning the procurement of components by planning the finished product in the net requirements segment Make-to-stock production Make-to-order production.
Which of the following parameters are determined by the planning strategy? Planned Independent requirement type Order type (production order or process order) Customer requirement type Procurement type.
In pure make-to-stock production strategy, you determine the demand program without reference to sales order True False.
In production by lot size (strategy 30), the requirements for the finished product are added up for MRP True False.
Identify the planning strategy that includes the settings for the consumption of sales order and planned independent requirements from the material master of the finished product Planned strategy 10 Planned strategy 40 Planned strategy 70.
Identify the consumption type in which the sales order consumes planned independent requirements after the customer requirement data Forward consumption Backward consumption Forward and Backward consumption.
With the sub assembly planning planning strategy 70, the consumption periods are calculated on the basis of the dependent requirements or reservations True False.
Which individual / collective indicator settings can be used in make-to-order production to ensure sales order stock of a component 1 2 Blank.
Identify the strategy in which procurement or production is triggered by the sales order only Strategy 20 Strategy 10 Strategy 40.
The planning without final assembly strategy enables you to reduce delivery times True False.
Planned order with order type VP can be used for the following purposes External procurement Subcontracting Stock transfer Final assembly before sales order.
Assembly processing is a form of sales order processing. The procurement elements are created upon creation of the sales order item True False.
Identify the strategy trough which the planned independent requirement are reduced by the goods issue for the production order for the finished product Strategy 59 Strategy 30 Strategy 70 Strategy 74.
With strategies 70 and 74, the assembly´s planned independent requirements are reduced by the goods issue for a production order or cost center True False.
A strategy group can contain a main strategy an up to seven alternative strategies True False.
Identify the areas where availability check happens Classical Sales and Distribution applications Planned orders from production planning Production or process order from production Goods issue from production.
Identify the levels at which you can execute the planning run Plant level Individual material level Purchase group level.
Identify the targets that can be achieved trough parallel processing Improved performance Robustness Increased safety stock level.
When you start the planning run, which parameters can you set on the entry screen? Define the planning type as regenerative planning or net change planning within the total horizon or within the planning horizon only Determine whether or in which period purchase requisitions and schedule lines are required as a result of the planning run Define whether the planning run is to generate MRP lists Define requirement classes.
You want the system to plan a BOM structure interactively and step-by-step. Which option will you use? Single item interactive Single item multilevel planning with display results before they are saved Single item multilevel planning with simulation mode.
You can define the firming period using the planning time fence or a manual firming date True False.
The firming entries for the planned order or the components of the planned can be changed manually automatically depending on the requirement data.
The lot size calculation is executed on the basis of the net requirements and a calculations is made for a procurement proposal True False.
During net requirements calculations, the system checks whether the requirements can be covered by _________ and _______ available warehouse stock fixed dispatched receipts independent requirements.
The safety time can be defined with the following options Safety time should not taken into account (indicator = blank) Safety time should only taken into account for independent requirements (indicator = 1) Safety time should be taken into account for all requirements (indicator = 2) Safety time should be taken into account for dependents requirements (indicator = 3).
When the inventory is lower than the defined safety stock level, which of the following condition happens? Safety stock increases the stock available for planning System replenishes the safety stock during the planning run.
Identify the different groups of procedures in the lot-size calculation Static lot-sizing procedures Period lot-sizing procedures Optimum lot-sizing procedures Dynamic lot-sizing procedures.
Optimizing lot-sizing procedures optimize the costs total resulting from ordering (Order and set up costs) and storage costs True False.
The procurement type is used to determine whether a material is to be produced in-house or procured externally True False.
The ____________ specifies how the receipts should be distributed among each source or supply Quota arrangement Procurement type Procurement proposal.
The positive lead time is taken into account in lead-time scheduling True False.
Which of the following are individual time portions from routing? Wait time Lead time Labor time Machine time.
If the system does not find a valid BOM in the selected usage, identify the next action The system selects the usage with the next highest priority and carries out the check for valid BOM The system selects the usage with the next lowest priority and carries out the check for valid BOM.
Which of the following functions in the MRP list and stock/requirement list evaluations groups the planning results into periodic buckets Period totals Display filters Selection rules.
In repetitive manufacturing, orders are generally planned according to quantity and period True False.
Which of the following indicators are true for exception messages? Newly created order proposals from planning Dates in the past (for example, opening date) Problems with BOM explosion or sheduling Planned independent requirements .
The stock day´s supply enables you to recognize potential shortages at an early stage True False.
Master production scheduling is executed with the same logic as material requirement planning True False.
Identify the objectives of long-term planning Forecast of safety stock Reconciliation of capacities Reconciliation of cost center planning Purchase forecast.
The principle of long-term planning is to simulate different versions of the demand program True False.
A planning scenario must be released before long-term requirements planning can be carried out True False.
The operative demand program results from the total of all active planned independent requirement versions True False.
Identify which of the following items can be transferred to the simulative planning area Active or inactive planned independent requirement version Sales order Firmed, operative planned orders Unfirmed, operative purchase requisitions.
When companies want a very simple process of transferring stock from one plant to another, they can make use of the one-step procedure True False.
Identify the plant in which the product´s bill of material is created Planning plant Production plant Issuing plant.
Subcontractor material requirement planning area are used the staging of components for individual subcontractors True False.
Using MRP areas, planned independent requirements can be created for each MRP area True False.
Identify the area in which the sales order for make-to-order production are always planned Stock / requirements area Goods issue area Plant MRP area.
Which of the following is true for assembly processing carried out dynamically Partial deliveries Lost (direct) reference to the sales order One assembly order per sales order item Several assembly order per sales order item.
Material requirements planning takes current and future sales as its reference point True False.
Identify the components that the system uses to plan the external procurement quantity Planned order Purchase requisition Production order .
The setting in plant parameters takes priority over the setting in the MRP group True False.
If materials were created before MRP run for a plant was activated, you must create any entry in the planning file for all MRP-relevant materials in this plant True False.
During _______ planning, the system explodes the material´s bill of material and creates and plans the dependent requirements of the assemblies and components Single-item, multilevel Single-item, single-level.
When determining routing, the system uses the __________ maintained in Customizing to search for a routing with usage and status of the highest priority Scheduling profile Strategy group Selection ID Application ID.
The MRP list is static and the stock/requirements list is dynamic True False.
Changes that you make in the planning table are not written to the database unless you ______ them upload save convert.
Identify the MRP elements through which the report evaluation enables you to gain an overview of the status of all BOM levels Sales Order Production order Planned Order Safety Stock.
Long-term planning can be executed as _______ and ___________ total planning single-item planning collective planning.
Sales planning for requirements forecast at aggregated level, demand management, simulative planning (long-term planning), operative material requirements planning, capacity planning with reference to the production plant True False.
The production BOM contains the assemblies or components that are involved in the production of a material True False.
Planned independent requirements are created when the Sales and Operations is released True False.
The forecast check (or check against planned independent requirements) and the check with ATP logic (Available-to-Promise) are the two types of Availability Check True False.
You can use the procurement type to allow both in-house production and external procurement to be used True False.
The current stock / requirement list is a dynamic list that shows the current levels of stock, requirements and receipts True False.
Material requirement planning and capacity planning occur simultaneously in SAP ECC True False.
Simulation of a demand program at all BOM levels, alignment of capacities, alignment of cost center planning, purchasing forecast, and inventory controlling forecast are the goals of long-term planning True False.
You must create special material master records for long-term planning True False.
The prerequisite for planned orders from long-term planning to be transferred to operative material requirements planning is that the planned orders of the long-term planning scenario must be firmed True False.
Which receipts can be taken into account in long-term planning? Firmed receipts Firmed purchase requisitions Firmed planned order.
Shop floor control and process manufacturing (good), repetitive manufacturing (only few possibilities), Kanban (hardly any; self-controlling) are the basic production types according to the ability of controlling the production process manually True False.
The order category is used to distinguish between the various orders that are used in the different applications True False.
A material master contains material-related information for procurement, production, storage and sales True False.
In SAP ECC strategy 20, net requirements are calculated between individual sales order or with make-to-stock warehouse stock True False.
MRP generally uses forward scheduling True False.
What is the name interface between SAP ERP system and SCM-APO named? Plant Data Collection Interface Human Machine Interface Core Interface Business Application Interface.
Which of the following characteristics are the basic functions of production orders Cost estimate Assembly orders Process messages Status management.
Which of the following supports data exchange between the SAP ERP system and the process control system from different manufacturers in the area of industrial production SAP Manufacturing Integration and Intelligence Open Connectivity in Industrial Amazon SAP Online Data Access Plant Data Collection.
SAP Manufacturing Integration and Intelligence is an independent SAP software component True False.
Which of the following is the master data for production order? Material Bill of Material (BOM) Material requirement planning Work center.
Single-level bills of materials are used to create production orders True False.
Which of the following are periodic tasks of Cost Object Controlling Work in Progress (WIP) determination Goods Issue Variance Calculation Settlement.
Which of the following information is displayed on the Operation details screen of a production order Variable size item data Interoperation times Process Instructions Operation dates.
Which of the following activities are involved in order creation? Scheduling Goods receipt Capacity requirements planning Cost estimate.
When you delete an Operation, the system automatically renumbers the remaining operations True False.
Mass processing can be used to convert planned order one at a time True False.
Which of the following are the alternative ways to create a production order? Create for Sales Order Create with Purchase Order Create with Material Create without Material.
Which of the following activities are involved in the creation of production order? Scheduling Back flush of components Calculation of planned costs Determination of capacity requirements.
Which of the following functions can be defined in a production version validity dates lot sizes alternative sequences alternative BOM.
Which of the following are the scheduling methods for production planning? Routing scheduling Lead time scheduling BOM scheduling Planned order scheduling in MRP.
If you use order-related cost object controlling, a cost object is managed for every single process object True False.
Which of the following elements are included in the planned costs of a production order? Breakdown cost Material cost Overhead cost Activity cost.
You can either check the material availability in a collective check for all components (automatically or manually), or in a separate check for each component (only manually) True False.
If the total required quantity of a material component is not available at the required date, the system updates the status as _____ REL (released for operation) MACM (material confirmed) MSPT (material shortage).
Which of the following system status use implies that there is a capacity shortage CRTD CSPL MSCP MANC.
You can use the capacity availability check to determine whether sufficient capacity is available True False.
For material-related PRTs, you can run the availability check against the unrestricted-use stock of material True False.
A dispatched operation is given the DSPT status True False.
What is the new status of the production order after it has been released by the mass release function? CRTD REL PRT CNF.
Which of the following switch needs to be activated in the operation control key to print an operation Time ticket Confirmation Print.
Under which of the following conditions are confirmation slips generated for operations? Operation control key print confirmation slip has been activated Operation control key print has been deactivated The operation control key for confirmations is 1, 2 or blank The number of completion confirmation slips is greater than 0.
Which of the following background programs is used to print flagged orders? SAPLATP4 PPPRBSCM PPPRBBTCH PPBICO40.
Which of the following functions is used to carry out stock transfer for a material Picking function Pull list function Production order Engineering workbench.
Which of the following components helps in controlling the creation and update of goods movements Movement type Goods Issue Negative Stocks Backflush posting.
Which of the following operation defines whether an operation needs confirmation Confirmation number Operation control key Order type Confirmation parameter.
When you perform milestone confirmation for an operation, all preceding operations are confirmed automatically True False.
Which of the following rules determine the reduction in capacity requirements, while performing confirmation Proportional to the quantity Proportional to the activity Full reduction of capacity requirements with partial confirmation Full reduction of capacity only with final confirmation.
Delivery tolerance limits can be maintained in ________ Work center Material master work scheduling view Production orders Bill of material.
Automatic goods receipt function can be set in Confirmation parameters Operation control key Order type dependent requirement Production scheduling profile.
Inventory management is performed on the basis of quantity and value True False.
Which of the following components are required while executing a goods receipt for a production order? Plant Work center Storage location Movement type.
In product-related Cost Object Controlling, all costs are debited to a product cost collector True False.
Which of the following are types of deletion procedures? Custom deletion Group deletion Individual deletion Mass deletion.
Residence time are determined based on the order type True False.
You can use the _________ for the role of a production scheduler to process and track production orders Process messages Event manager Enterprise portal Quality notification.
Which of the following components are the information system available in SAP? Control system Business information warehouse Order information system Missing parts information system.
Automation is possible for which of the following functions Goods receipt of an order Schedule order Change in operations Confirm operations.
In a collective order, the lot size indicator from the material master is taken into account when individual orders are created True False.
Which of the following statements are true regarding collective orders? Less effort is required for planning managing, and maintaining orders Availability checks can be carried out for collective orders The lot size indicator from the material master is taken into account when individual orders are created Order release and confirmations can be carried out for collective orders.
Which of the following options are automation functions triggered by events at operational level? Set and / or remove status Inclusion of reference operation set System and / or user status Starting a workflow task.
The business functions LOG_PP_PROD_ORD_SPLIT enables you to use enhanced functionality for the order split True False.
In which of the following ways can you split an order? Split with same material Split with other material Split with backflush Split to warehouse.
Which business function enables you to display several lists of shift notes simultaneously? LOG_PP_PROD_ORD_SPLIT LOG_PP_SRN_02 LOG_PP_WIP_BATCH LOG_PP_XS_RTG_PO.
Which of the following criteria can trigger an alert? Shift note type Order processing Work center Reference object type Category.
A WIP batch is a special type of batch that exists only inside a manufacturing order True False.
Which of the following are usage scenarios of WIP batches? While running MRP For supporting subcontracting operations within a manufacturing order Creating a goods receipt for a WIP batch quantity, while confirming an operation or phase Analyzing the work in process stock, by using the batch information cockpit.
Which of the following creates production requirements? Process messages Material requirement planning (MRP) Execution steps PI sheets.
The data for process management / process integration is maintained as XSteps True False.
Which of the following functions need a released production order as a prerequisite for downloading data? Material data download Initial download Delta download Transaction data download.
Which of the following BAPIs are used for data transfer, as of SAP release 4.6? BAPI_PROCCOMP_READMULTIPLE BAPI_PRODORDCONF_PDC_UPLOAD_TE BAPI_PROCESS_MESSAGE_CHK_EXIST BAPI_PRODORDCONF_PDC_UPLOAD_TT.
SAP MII provides a flexible development environment and enables customers to design composite applications True False.
Which of the following functions is not supported by handling units? Goods Issue Backflush Confirmations Goods receipt.
The use of the order-related Cost Object Controlling is beneficial in which of the following cases? Sales order controlling only in profitability analysis Flexible production environment Flexible product range Cost management of individual production lots High setup costs Repetitive manufacturing and mass manufacturing Manufacture of co-products.
Which features does order splitting provide for costing and financials? Order processing Transparency on cost element Fair split of planned costs between parent and child order ATP recheck of components.
Which of the following statements are true with respect to WIP batches? WIP batches are not automatically assigned to the corresponding production or process order WIP batches can be used for production and process order WIP batches are not subjected to inventory management WIP batches can be created during order confirmations at operation level.
You can use PP-PDC interface for process control with process orders True False.
The _______ server has a sandbox client and golden client Quality Assurance (QA) Development (DEV) Production (PROD).
In which client do the team members try different interactions of configuration to tests the results Sandbox Golden Transactional.
Which data is often referred to as slowly changing data? Master Data Configuration Transactional.
All transactional data is related to some form of master data or configuration data True False.
The _______ is the highest hierarchical level in SAP ERP application Client Company Code Plant Storage Location.
A __________ is the smallest organizational unit of external accounting for which a complete and self-contained bookkeeping system can be replicated Client Company code Plant Storage location.
A _________ is a means through which saleable materials or services reach the customer Sales organization Distribution channel.
Which of the following are based on the planned time (standard values) in an operation? Lead-time scheduling Product costing Capacity planning All of the above.
Plant is the main organizational element in production planning True False.
Which of the following is an organizational element to which a plant is assigned? Company code Material master Bill of material Work center.
All master data, planning, and execution activities are defined and performed at client level True False.
Which of the following is an example of plant dependency? Company code Routing Sales organizations.
Inventory management is carried out in the plant on a quantity basis at storage location level True False.
The standard system can be set in such a way that the storage location data is created automatically for all types of receipts True False.
A plant belong to multiple company codes in the SAP ERP application True False.
MRP areas are part of the physical organization structure? True False.
The three types of MRP areas are plant, storage location and vendor (subcontractor) True False.
The material master record integrates data from different areas of a company True False.
Which table contains the general material data that applies to the entire company? MARD MARC MARA.
Which view contains the user-defined class assignments for a material? Basic data view Classification view Material planning view.
The classification system, all classes, characteristics, and characteristics values are predefined by SAP and delivered with the system and cannot be changed by users True False.
Which information are relevant according the Industry Sector? The screens appear and in which order The industry-specific data The branch of industry the material is assigned to All of the above.
When you create a material master record, you must define material type for the material True False.
The base unit of measure must be defined when the first view for each material master record is created True False.
Which alternative unit of measure is used for ordering the material and is the default unit for purchasing functions? Sales unit Production unit Order unit Unit of issue.
Which unit of measure is the stock keeping unit? Sales unit Base unit of measure Order unit Unit of issue.
The base unit of measure must not be entered in the unit of measure group True False.
When using MRP groups, the fields values appear in the material master True False.
Which of following characteristics for MRP profile? Set default values for MRP data fields Specify whether the values can be changed during material master maintenance The forecast profile allows you set default values for forecast data fields .
Which transaction is used to create a material master planned for future MM01 MM11 MM#1 CEWB.
Which transaction is called to extend new views for material master? MM#1 CEWB MM17 MM50.
A class type describes a group objects that have common or similar specifications True False.
Only material master records can be classified using the classification view True False.
As a material approaches the end of its life cycle, you need remove it from the database True False.
You can display the archived data as well as retrieve it True False.
A batch is a unique homogeneous subset of a material that is not reproducible True False.
A bill of material is a complete, formally structured list of components that make up a product or assembly True False.
A material BOM is the only BOM category that can be created in the SAP ERP application True False.
A material BOM can have many differents usages for specific departments within a company True False.
Each material BOM is uniquely defined for a material and a plant, and each material plant combination BOM has a separate internal number assigned to it True False.
At minimum one view of a material master record must exist before you can create a BOM for that material True False.
The base unit of measure defaults to the BOM item but can be overridden with issue unit of measure from the Work Scheduling view if it is populated True False.
Each time a BOM is saved the system calculates the low level code that is used for planning True False.
Which of the following elements is defined by the area of validity is? The material that can use a BOM The plants that can use a BOM The materials that are used by a BOM as component The industry that can use a BOM.
Which of the following is not an item category Stock item Non-stock item Class item PRT item Text item.
Once an item category is assigned to a BOM item, it cannot be changed True False.
A variable-size item category requires you to enter the dimensions of the item True False.
A non-stock item category does not require a material number True False.
A recursive component in a BOM appears twice as a component with two different item numbers True False.
When you make a change to a BOM using a change number, the validity dates in the BOM are changed to match the key date in the change number True False.
Which report would you use to determine which BOM are affected by a component change? BOM comparison Level-by-level BOM explosion Multilevel BOM explosion Material where-used list.
Which report would use to display an overview of all the necessary parts and materials? BOM comparison Level-by-level comparison Multilevel BOM explosion Material where-used list.
Which report would use to display the differences between two BOM with different change status use BOM comparison Level-by-level BOM explosion Multilevel BOM explosion Material where-used list.
A material with any material type can be used as a BOM component and this cannot be changed in the system True False.
Which of the following can be set in the user-specific settings? Item increment Item category for materials Default BOM usage Default BOM category.
Routings form the basis only for lead-time scheduling and capacity planning True False.
A routing stores the planned time for each operation as standard values True False.
A major function of work center is to support capacity planning and scheduling True False.
Capacities can be entered and changed in work centers, but cannot be maintained independently True False.
Work centers determine the place where the operation is to be executed True False.
Capacity refers to the ability of a work center to perform a specific task True False.
The capacity header for the reference capacity differs from a work center capacity header True False.
You can assign a work center to only one cost center during a specific time period True False.
Which of the following is a non-order-related method for implementing an activity Task list Routing Master receipe Network.
Which of the following is not a prerequisite for component allocation? Operations in the routing must exist Production version must exist BOM for the material to be produced must exist Backflush indicator must be set.
Any material component that you do not assign to an operation in the routing will default to the first operation True False.
You can assign each item in the bill of material (BOM) to only operation in the routing True False.
Suboperations can be used for more detailed capacity planning and costing True False.
When suboperations are used, costing is automatically performed at operation level regardless of the control keys True False.
A where-used list can show you the task list that will be affected by a change in a work center True False.
It is not possible to make mass changes to routing using an engineering change management (ECM) number True False.
One of the differences between co-products, by-products and waste products is their inventory valuation and settlement True False.
A component with negative quantity exists in a BOM. Select each of the following answers that could apply A co-product A by-product A waste product A recursive product.
The components in a phantom assembly are ___________ immediately placed into the superior assembly first assembled to produce the header material, which is placed into the superior assembly.
Identify the reasons for replacing a component in a material New safety regulation Cost-intensive part Materials management.
A component is replaced by a follow up material when the stock available for material requirement planning of the discontinued component is zero True False.
All assembly materials can be entered in the same ______ item group usage probability alternative requirements planning sub.
If you want to assign one name to all alternatives in a multiple, you have to enter a BOM group in the ___________ material master BOM header master data.
When a single material consists of more than one list of components, which of the following is used? BOM Multiple BOM Material master.
You can convert a multiple BOM into a variant BOM True False.
Identify the various type of BOM Simple Variant Multiple item category BOM.
Complex products mean complex configuration tasks in both _______ and __________ sales production characteristics.
You can __________ data either locally or in multiple systems using the product structure only display evaluate and process only change.
Parallell sequences are special types of overlapping operations True False.
In the simplest case, a routing has one sequence, the ________ sequence parallel alternative standard.
You can create parallel sequences in which of the following task lists Routing Rate routing Reference operation sets.
An alternative sequence is a ___________ sequence of operation that is an alternative to a sequence of operations in the standard sequence standard parallel linear.
Which of the following is the main reason for an alternative production method being required for different production lots? Validity date Efficiency Lot size Labor availability.
You can store _________ production version (s) for different lot size intervals in the material master single multiple.
A product can have a maximum of 100 alternative bills of materials (BOM) True False.
A reference operation set allows for parallel and alternative sequences True False.
You create a _________ for a reference operation set in the operation overview template reference material component.
Which of the following can you assign to an operation in a reference operation set? Material components Tools (PRT) Trigger points.
If you copy a reference operation set from a routing sequence is copied True False.
The in house production time for a _________ can be calculated using lead-time scheduling BOM material sales order.
Lead time scheduling calculates the basic dates True False.
If material requirement planning (MRP) is carried out without lead-time scheduling. it calculates capacity requirements True False.
You can use a scheduling margin key to define floats before and after production in the material master record True False.
You can pre define the order float and control it using the __________ margin key scheduling set up processing.
The system can carry out reduction measures in __________ scheduling for orders basic lead time longtime.
You can combine several standard trigger points into a trigger point group True False.
Assembly scrap is used only when the material is an assembly True False.
Component scrap increases the dependent requirement quantity of the __________ assembly component material.
Operation scrap in the bill of material (BOM) relates to the quantity of a component to be processed in an assembly True False.
In the SAP ERP application, you can assign various production resources and tools categories to an operation in a routing or production order True False.
PRT is another name for a component that is used in production True False.
The engineering workbench (EWB) is a complex tool that support integrated processing of bill of material (BOM) and routing True False.
Which of the following views support the full scope of processing? Filter Compound Create Change Delete.
Design and technical changes require ___________ change (s) to the assembly in the bills of material (BOM) and to the sequence in the routing Individual Single Simultaneous.
In the engineering workbend (EWB) only data that lies entirely or partially in the validity period is copied to the _________ Focus Worklist Structure.
The system automatically displays the tab page on which the object of the focus has been placed True False.
The copy range must include the object you need to copy True False.
Which of the following controls the engineering workbench (EWB)? Cockpit Context Worklist.
The cockpit is used to display the hierarchical relationship of objects in the overview screen True False.
For which of the following can you set the focus? Operation Routing header BOM header Production resource and tools.
Using the Product Lifecycle Management Web User Interface (PLM Web UI), you can grant project team members access to just the project data assigned to them True False.
The product Lifecycle management Web User Interface (PLM Web UI) is a ________ based interface Web looker Web browser Design.
The product Lifecycle management (PLM) work center is a flexible display tool that provides navigation help for complex object relations on an integrated user interface True False.
Status and action management (SAM) on the Web User Interface (Web UI) helps you improve __________ Time-to-market for new products Products enhancements Interactive approach to managing product maturity.
When you work with a document info record, you work with a status network True False.
The product Lifecycle Management Web User Interface (PLMWebUI) uses the ________ document status network Simple Classical Detailed.
The release record is an engineering record with a special record type True False.
Guided Structure Synchronization (GSS) is a solution for transferring engineering data to manufacturing True False.
Which of the following activities are the functions of Guided Structure Synchronization (GSS)? Guiding and supporting users Processing structures and BOM Supporting continuous reconciliation.
End-to-end mapping of business process in IT systems is a decisive factor in maintaining an enterprise´s competitiveness and reducing costs True False.
The engineering bill of material (EBOM) represents the ________ of a product Functional Structure Production flow Sequence of assembly steps.
Redlining is provided with the standard shipment and can be used for material bill of materials (MatBOM) True False.
Identify the fields of the materials bills of material (MatBOM) for which redlining can be performed Description Category Subitem Status.
The materials planning view contains plant-specific data used in procurement planning True False.
Which view contains plant-specific data is used in procurement planning? Basic data view Classification view Materials planning view Scheduling view.
When a company needs to create a new material master record, it has to match the process to the SAP ERP transactions True False.
The MRP profiles allows you to set default values for MRP data fields and determine whether the values can be changed during material master maintenance True False.
You can limit the use of a material by using a material status True False.
It is possible to change the material type without restriction even if stocks, reservations or purchasing documents exists True False.
Variant configuration uses object to select specific items on the bill of material and the corresponding operation on the routing for products that have many different options True False.
Which of the following are reasons for using engineering change management (ECM)? Monitoring and documenting of changes Planning and execution at a specific point in time You can save several change status use for the same object Integration in the logical process chain All of the above None of the above.
Which of the following are ways of deleting a BOM? Deleting the entire BOM Delete a BOM item Set the deletion indicator Delete with a change number Archive the BOM.
Networks are used to view resource loads in sales and operations planning without bill of material (BOM) explosion True False.
More than one bill of material (BOM) can have components allocated to the same routing True False.
Which of the following is a non-order-related method for implementing an activity? Task list Routing Master recipe Network.
Which of the following is not a method of creating routing material assignments in SAP ERP? Create a material-specific routing Copy a material master record. The bill of material (BOM) and routing are automatically copied Create a material assignment in the routing header Create a production version.
Component allocation to an operation is the only additional information that can be entered with regard to components True False.
You can use user-defined fields to assign data fields to an operation or sub operation for information purposes only True False.
Which of the following are ways of making changes to routing in SAP ERP Without history With change documents With history using engineering change management (ECM) All of the above.
Co-products, by-products and waste products are materials in the BOM that you can choose to produce True False.
In order to use a material in a BOM as a co-product, you must first enable it to be used a co-product in the material master True False.
A phantom assembly is usually created within engineering to describe a number of components and to manage them as a whole True False.
Phantom assemblies facilitie _________ easy maintenance of the material master component assignment simple structuring of BOM.
The highest level to determine a part as phantom assembly is the _________ level material master BOM.
Which of the following is carried out when the stock available for material requirements planning (MRP) of the discontinued material is zero in simple discontinuation? The dependent requirements are diverted from the discontinued material to the follow up The follow up material is acquired (in place of the discontinued material) if it is not available for material requirement planning The successor group contains a summary of the associated follow up items in a BOM.
The plant and usage are part of the unique key that identifies a BOM True False.
A product made of different combinations of components is often represented by alternative BOM´s or alternatives True False.
Which of the following situations help a user to create a variant? A BOM does not already exists for the material The base unit of measure of the variant materials is the same You need an alternative BOM to the existing BOM.
You can use the mass change function to make changes to the items in several BOM using only one function call True False.
When MRP groups are used, the fields values appear in the material master True False.
The MRP profile allows you to set default values for MRP data fields and determine whether the values can be changed during material master maintenance True False.
You can limit the use of a material by using a material status True False.
It is possible to change the material type without restriction even if stocks, reservation or purchasing documents exists True False.
Identify the item changes for material items, documents items and class items that the mass change function report Changing the item data Replacing the item data Deleting an item.
Which of the following are possible with alternative production methods? Producing the same material with different routing, which can be from different plant Manufacturing a single product with one BOM using different technologies Using an automatic assembly line for large quantities and a manual assembly line for small quantities.
A reference operation set is a standard operation sequence for performing a task that is frequently used True False.
Identify the functions of material requirements planning (MRP) Explode a material´s bill of material Generate planned orders Calculate basic order dates Updated a routing.
Triggers points can trigger functions when the status of an operation changes or when an operation is confirmed True False.
Identify the functions that triggers points can trigger Release succeeding operations Create orders by copying Insert a reference operation set.
Identify the scrap calculation procedures supported by the system Assembly Operation Component PRT.
Identify which of the following production resources and tools are differentiated according to their properties and business functions Materials Equipment Documents Material requirement planning.
For which of the following can you use as the selection criteria procedure Several individual values Value intervals Generically Effectivity window .
What is the motivation behind the development of SAP S/HANA Enterprise Management Growth of digital information and complexity in an organization Advancements in technology and a need to centralize information Mobile technology advancements.
Which statements are true concerning the SAP S/4 HANA system? SAP S/4 HANA is a new ERP system The SAP HANA database is an integral part of the SAP S/4 HANA system SAP S/4 HANA contains embedded SAP SucessFactors SAP S/4 HANA contains embedded SAP SCM APO.
Which global trends could motivate a customer to implement SAP S/4 HANA Enterprise Management? Increased data volume that processes need to deal with Need for a scalable infraestructure Decreasing digitalization Mature ERP core process.
What are examples of improvements in SAP S/4 HANA in the area of inventory management? Elimination of aggregates Simplification of the ERP data model Data redundancies for higher security Higher data footprint leveraging SAP S/4 HANA.
Why is the DIMP industry solution included in SAP S/4 HANA Enterprise Management? It is always been active in the standard SAP ERP system It is the most widely used industry solution in SAP It adds industry-specific functionality for Discrete Industries and Mill Products that customers from other industries could also benefit from.
What content does the Simplification List contain? A description of the impact of a simplification Services offerings from SAP related to a simplification Notes related to simplifications items References to other education material .
Which requirements would you need to address, with regard to the graphical user interface for an occasional user? It should be browser-based It should be provide overall authorization It should be simple It should be locally installed.
Which of the following statements apply to the "New" category of the SAP User Experience strategy? The new applications are delivered with the latest UI technology SAP Fiori is used for existing applications Customers improve applications with various UI technologies .
Which of the following characteristics apply to SAP Fiori Launchpad? It requires Google Chrome as a browser it can be used side-by-side with other UIs It can be personalized It is role-based.
What are planned independent requirements? They are customers independent requirements They are anonymous demand elements They are real sales figures They are placeholders for sales order.
Which system components can provide planned independent requirement numbers? SAP APO Demand Planning SAP Manufacturing Execution SAP S/4 HANA Standard SOP SAP Integrated Business Planning.
What does the Material Requirements Planning run trigger? The creation of planned independent requirement The creation of dependent requirements The creation of planned orders The creation of production orders.
Which of the following MRP types belongs to consumption-based planning? MPS - Master Production Scheduling VB - Reorder point PD - Material requirement planning.
What are new features of SAP S/4 HANA with regard to MRP? Automated MRP run MRP live Consumption mode "Consumption in own period" Finite MRP planning by default.
Which functions does SAP S/HANA offer in Sourcing and Procurement? Stock can be evaluated over time Vendor selection Separate transactions for customers and vendor maintenance Determination of supply source.
Which of the following apps can be used for invoice processing? Supplier Invoice List Supplier Invoice Correction Center Create Supplier Invoice.
In which areas are usually production orders used? In repetitive manufacturing In chemical industry In mechanical engineering.
Which of following processes require an order release? Confirmation of the order Creation of the order Printing of order documents Order settlement.
On which of the following data objects can confirmations have direct impact on? HR data Actual costs Capacity requirements Material Master.
Comparing the former SAP ERP - SAP EWM system landscape and today´s embedded SAP EWM in SAP S/4 HANA, which data object has been skipped due to simplification in the embedded EWM process? Outbound Delivery EWM Outbound Delivery Outbound Delivery Request EWM Outbound Delivery Request.
Which of the following replacements are included in SAP S/4 HANA Sales Simplifications? SAP GTS replaces ERP Foreign Trade Settlement Management replaces ERP Rebates Order Fulfillment Management replaces SAP CRM SAP Revenue Accounting replaces ERP Recognition.
Which of the following are business partner categories in SAP S/4 HANA? Resource Person Group Organization.
In SAP TM driver management, which master data object do you use to define a drive for a truck? Production resource / Tool Material Business Partner Distribution Center.
What does SAP S/4 HANA Analytical provide? ETL (extraction, transformation, loading) process Data replication via jobs Single source of truth Precomputed aggregates Real-time analytics .
What does the abbreviation OLAP mean? On List As Planned Offline Aggregated Packages Online Analytical Processing Organizational Layer Applied Product.
What are the names of the different transition scenarios? New Implementation Fast Track Transition Landscape Transformation System Conversion.
What is included in SAP Best Practices as part of SAP Activate? A reference solution A set of custom-specific solution Ready-to-run business process Education material on the business process.
Which of the following statements is correct in terms of SAP S/4 HANA? SAP S/4 HANA is a new product that builds on the database of the SAP Business Suite SAP S/4 HANA is a new product that builds on the success of the SAP Business Suite SAP S/4 HANA is a new release of the SAP Business Suite SAP S/4 HANA is an upgrade of SAP Business Suite.
Which of the following are relevant resources for the further information on SAP S/4 HANA Enterprise Management SAP Training Web Shop SAP Help Portal SAP Simplification List SAP Merchandising Kiosk.
Which requirements do you need to address with regard to the graphical user interface for a developer user? Browser-based, simple UI Front-end orientation Overall authorization Multiple system access.
Which of the following characteristics apply to SAP Fiori Launchpad? It requires Google Chrome as a browser It can be used side by side with other UIs It can be personalized It is role-based.
Which specific technique of planning material requirements (represented by the subsequent processing keys) became obsolete in MRP in SAP S/4 HANA? NETCH NETPL NEUPL.
What are key capabilities of SAP S/4 HANA MRP Live? Analysis of MRP lists Exception handling based on real-time data Simulation of "what if" scenarios in real-time.
What does "one MRP" mean in SAP S/4 HANA Enterprise Management? The MRP run in carried out once a day at nightime There is one MRP in S/4 HANA that can plan all materials Materials should be either planned in SAP APO or S/4 HANA, not both Quantities and capacities are always planned synchronously in one planning run.
What are key benefits of the SAP S/4 HANA MRP Live? Significantly higher data footprint leveraging SAP HANA Runs on any device Real-time analysis of disruptions in the material flow Simultaneous capacity planning by default.
Which of the following statements are true for make-to-stock production? Sales order are fulfilled by anonymous warehouse stock Planned Independent Requirement always trigger assembly Sales Order always trigger production Planning assemblies can be continued with make-to-stock concept.
Which of the following planning strategies are make-to-stock strategies? Production by lot size Planning with final assembly Planning at assembly level Planning without final assembly.
Which of the following statements are true for make-to-order production? Sales order are fulfilled by anonymous warehouse stock Planned independent requirements always trigger final assembly Sales order always trigger production Planning assemblies can be combined with the Make-to-Order concept.
Which of the following strategies are make-to-order strategies? Production by lot size Planning with assembly Planning at assembly level Planning without final assembly.
Which of the following statements apply to planning at assembly level? You can use any planning strategy for the finished product Consumption only takes place on the level of the finished product Forecast is done for the assembly / assemblies Consumption is triggered by the MRP run.
In which of the following can you find the main items and tasks of PP/DS planning? Demand forecasting Cross-location, period-based planning Location-related material requirement planning Location-related capacity planning.
At which level is scheduling performed? Production Data Structure Order Resource Material.
Which of the following are alert types in PP/DS? Alerts to update the time serie Quantity alerts Date and time alerts Capacity alerts.
To view alerts in PP/DS, what set up needs to be created? Create an application-specific profile Configure alerts in the core interface Assign an alert profile to the planning tool Select material-specific alerts in the product master.
Which of the following settings are contained in a product heuristic? Available-to-promise Net requirements Lot-sizing Scheduling strategy.
At which level does detailed scheduling (DS) heuristic plan? Product Order Resource Vendor.
In which of the following master data objects do we find control settings for pegging (interval, tolerance e procedure)? Material master Resource Production Data Structure Production Process Model.
Operations can be rescheduled from a resource to an alternative resource using which of the following ways: Manual drag and drop Using a PDS with multiple modes Attaching a production note to the PDS Selecting a different PDS using a heuristic.
What are major reasons for the SAP S/4 HANA Enterprise Management system? It is based on stable core process It provides a scalable infraestructure It includes CRM, SRM and APO It offers analytics with real-time.
Taking the MRP cockpit as an example - what are key capabilities of SAP S/4 HANA´s new user interface System-based decision support On-the-fly simulations Mobile access Personalization.
Which of the following items are part of the end-to-end process in Demand-Driven Replenishment Coupling of Production Lines Buffer Positioning Replenishment Planning Buffer Sizing.
What are some of trends driving the need for a re-engineered business suite built for the digital? Massive increase in device connectivity Business users are taking on more technical IT tasks Increase in ownership of mobile devices Adoption of cloud computing.
Why was the application cod completely re-written for SAP S/4 HANA? The optimized ABAP code that we developed for Suite on HANA would not work with SAP S/4 HANA To take advantage of the simpler data model SAP S/4 HANA is now with JAVA To ensure that the code is optimized for SAP S/4 HANA.
What is the missing acronym? With SAP S/4 HANA, OLTP and _______ applications are managed within the same system HTTP JSON ETL OLAP.
What is the name of the SAP S/4 HANA core? Enterprise Resource Management Enterprise Management Enterprise Central Component Enterprise Line of Business (LoB).
What are the names of SAP S/4 HANA cloud editions? (3 correct answers) Enterprise Management Cloud Professional Services Cloud Marketing Cloud Finance Cloud.
What is SAP Fiori? Mobile technology User experience Data model Reporting tool.
SAP S/4 HANA is built to natively integrate with Business Newtwork such as: SAP Ariba Linkedin Concur SAP Fieldglass SAP Hybris.
What features of SAP HANA enable massive data footprint reduction for SAP S/4 HANA? Support for data aging strategies Column store tables On the fly aggregation from line item tables Use of hierarchical cache.
What characterizes the architecture of a simple application? Use of dedicated aggregation tables Works with any database Push data intensive tasks to SAP HANA Reduction in number of tables No data redundancy.
Which editions allows more extensive customer modifications? On-premise Cloud.
What does the word Fiori mean? Fire Flower Fury Fast.
SAP Leonardo builds on SAP´s digital transformation framework with the goal of enabling faster innovation with less risk True False.
What are key functionalities in SAP Cloud Plataform? Open APIs Integration Edge Computing Microservices.
Identify some of the benefits of SAP Fiori Increases productivity Allows users to take quick and informed actions Focuses on business function Increases user satisfaction.
SAPUI5 is the leading UI technology of SAP´s user experience strategy True False.
Allows the user to focus on the most important tasks, and view filter and react to information quickly List Report Object Page Overview Page Analytical List Page.
Offers a way to analyze data step by step from different perspectives, investigative a root cause through drilldown and act on transactional content List Report Object Page Overview Page Analytical List Page.
Offers a powerful features to find and act on relevant items List Report Object Page Overview Page Analytical List Page.
Allows the user to display, create or edit an object List Report Object Page Overview Page Analytical List Page.
What are the different types of SAP Fiori apps? Transactional Factsheet Analytical Personas.
Only a subset of all design items in the SAPUI5 library is allowed for SAP Fiori True False.
SAP Screen Personas is available with both the on-premise and cloud editions of SAP S/4 HANA True False.
You want to view your leave requests from SAP SuccessFactors and your purchase requisitions from SAP S/4 HANA in one place. You can do so by having a conversation with SAP CoPilot True False.
Which recent hardware architecture trends does SAP HANA exploit? Multi-core processors Cheaper and larger memory size Faster disk speeds Multi CPUs working in parallel .
What type of table storage does SAP HANA support? Column Row Vector Flat.
What type of tasks does SAP HANA typically take over from the application server? Filter Aggregate Validate screen input Sort.
Event though SAP HANA utilizes a full in-memory database, disk storage is still required True False.
SAP HANA automatically takes a snapshot of the memory every few minutes and stores this on a disk layer. This called a ____ warm standby savepoint hot standby failover.
Standby servers can be on hot standby, which means they are ready to go immediately and do not need to be started True False.
What data types can be SAP HANA natively store and process Voice Transactional Textual Spatial.
In SAP S/4 HANA Enterprise Management, a new responsive user experience design has been implemented for the roles of: Sales representative order management and billing Inventory Manager Procurement Clerk Material planner.
Sales KPI are integrated in SAP Cloud Analytics True False.
Customer Engagement and Packages Service Offerings support efficient issues resolution through multichannel customer engagement and smart interactions True False.
Identify the features of Advanced Available to Promise Advanced transportation scheduling Mass enable fast availability check Use-case driven product allocation check Sem-manual plant substitution.
With MRP live, the MRP controller can match demand and supply more efficiently than was previously possible True False.
SAP Fiori apps help in managing supplier invoices and payments blocks True False.
_______ leverages embedded software management for holistic modeling Variant configuration Project Financials Controls Project Logistic Control Product Development Foundation.
Maintenance Planning and Scheduling reviews ongoing maintenance activities with the ability to reschedule multiple times a day True False.
The universal journal represents the single source of truth in SAP Simple Finance True False.
The time sheet and Organizational Management business capabilities integrate HR information on availability and actual working times into logistical processes True False.
The simplification list is a key document that is used in the implementation phase and is relevant for all customers True False.
What are the 3 pillar of SAP activate Methodology Performance tunning Guided configuration Best Practices .
What implementation scenarios are covered by SAP Activate? System conversion New implementation Landscape Transformation Database migration.
Put the following SAP Activate Methodology phases into the correct sequence Explore - Deploy - Realize - Prepare Explore - Realize - Deploy - Prepare Prepare - Explore - Realize - Deploy Prepare - Realize - Explore - Deploy Explore - Prepare - Deploy - Realize.
With SAP S/4 HANA Readiness Check, you get separate reports to check readiness of your productive ERP system for conversion to SAP S/4 HANA True False.
SAP Best Practices content for SAP S/4 HANA consists of the following layers: Solution Package Scope Items Configuration Guide Building Blocks.
______ is used to used to activate SAP Best Practices content in the customer system Expert Configuration SAP Solution Builder Tool Self Service Configuration UIs IMG and SAP Solution Manager.
Only companies with lower levels of standardization benefit from SAP Model Company services True False.
What type of checks must you make to your custom ABAP code prior to conversion? Use of Object Oriented ABAP Use of pool and cluster tables Use of native SQL Use of database hints Use of Select All.
The next generation data migration software embedded in SAP S/4 HANA requires programming by the Customer True False.
Identify the features of SAP S/4 HANA embedded analytics SAP S/4 HANA embedded analytics focuses on deeper, more advanced BI scenarios SAP S/4 HANA embedded analytics are part of the core SAP S/4 HANA license SAP S/4 HANA embedded analytics focuses on operational analytics SAP S/4 HANA embedded analytics uses an SAP BW system wherever deep multidimensional analysis is required.
What does a virtual data model provide? A copy of the database that is optimized for analytical use Reporting tools for users Consumption ready views of data Ready to use business reports.
Which of the following is used to build the SAP S/4 HANA virtual data model? SAP HANA live Universes ABAP logical databases ABAP CDS views.
With SAP S/4 HANA Embedded Analytics, which tools are aimed at end users? View Browser SAP Lumira, designer edition Analytical SAP Fiori applications Query Designer Smart Business Cockpit.
The _________ is a powerful reporting tool that can be used to create simple, Excel-based reports all the way up to the most advanced, highly formatted reports Multidimensional Report Client Query Designer Smart Business Cockpit SAP Business Object Analysis edition Microsoft Office.
Develop the KPI titles and follow-on evaluations and drilldowns Query Designer SAP Lumira, Designer Edition Analysis Patch Framework KPI modeling.
Provide insights to help focus on where to dig deeper to find the root cause of an issue Query Designer SAP Lumira, Designer Edition Analysis Patch Framework KPI modeling.
Develop dashboards within SAP S/4 HANA embedded analytics Query Designer SAP Lumira, Designer Edition Analysis Patch Framework KPI modeling.
Build reports from scratch Query Designer SAP Lumira, Designer Edition Analysis Patch Framework KPI modeling.
Which tools are used by the IT users in SAP S/4 HANA Embedded Analytics? CDS view maintenance using Eclipse Query Designer Analytical SAP Fiori applications Custom CDS views.
Which of the following are typical tools used by key user to develop various analyses in SAP S/4 HANA Embedded Analytics? SAP HANA Live Browser KPI Builder SAP Lumira, designer edition Query Designer.
Why do we still need SAP BW when we have SAP S/4 HANA Embedded Analytics? To provide a full data life cycle management framework To consolidate multiple data sources To support SAP BW powered business application To provide SAP S/4 HANA Embedded Analytics with real-time data.
Which requirements do you need to address with regard to the geographical user interface for a developer user? Browser-based, simple UI Front-end orientation Overall authorization Multiple system access.
What are key benefits of the SAP S/4 HANA MRP live? Significantly higher data footprint leveraging SAP HANA Runs on any device Real-time analysis of disruptions in the material flow Simultaneous capacity planning by default.
What are some of the trends driving the requirement for a re-engineered business suite built for the digital world? Increase in device connectivity Business users taking on more technical IT tasks Increase in ownership of mobile services Adoption of Cloud computing.
Which organizational unit in Profitability Analysis (CO-PA) is the highest reporting level for profitability and sales and marketing controlling? Company code Profit center Controlling area Operating concern.
Due to a high level of integration with other SAP components, Personnel Development is an ideal tool for constantly extending and updating employee knowledge True False.
Which of the following are typical tools used by key users to develop various analyses in SAP S/4 HANA Embedded analytics? SAP HANA Live Browser KPI Builder Design studio Query Designer.
The SAP Fiori Launchpad is configured and the roles and users are maintained in the backend server of the Fiori architecture True False.
The capacity requirements can change after confirming the sales order and quantities True False.
When operation are scheduled infinitely for an order, the capacity requirements of others orders are NOT taken into account as that can lead to capacity overloads True False.
The evaluation interval is fixed and cannot be changed after the capacity evaluation begins True False.
An advantage of using evaluation reports is that the minimum and maximum load can be adjusted interactively True False.
Which of the following are advantages of using the Manage Work Center Capacity App? You can flexibly forecast consumption and optimize supply per work center You can flexibly evaluate the capacity situation of work center capacities You can display the pegged requirements, that is, the individual operations and orders You can display and interactively change the shifts of the work center capacity.
The formula for calculating free capacities is: Free capacity = Available work center capacity - Requirements of dispatched operations - Requirements of operations not dispatched True False.
If you want to dispatch an operation to a certain work center and a certain period, you can select the operation to be dispatched, the desired target work center, and the desired target period. Then you can choose the Dispatch function True False.
Which of the following statements describe the Schedule Production app? It maintains capacity and raw material constraints to achieve right product mix It is a straightforward tool for the capacity leveling of planned, production and process order It records sales order to ensure all demands are at the same level of fulfillment It is specially designed for dispatching orders to pacemaker or bottleneck work centers .
Which of the following are functions provided by the graphical planning table? You can find technical objects with enhanced filter and list functionality You can view all the relevant information about recurring standardized work sequences inspection and repairs You can use a planning log and a scheduling log to evaluate the results of your planning process You can sort and dispatch operations in a defined sequence.
The dispatching of an operation terminates if no available capacity is found in the planning direction within a planning period True False.
In which of the following situations is the dispatch of an operation likely to be cancelled? When the desired dispatching time of an operation coincides with an operation that is already dispatched When there is a critical bottleneck for a work center When inserting an operation infinitely fails due to lack of capacity When an operation is shifted out of a planning period.
You can reduce the float before production, the float after production, the queue times and the move times True False.
If there is not enough capacity available in the current shift, then operations are cancelled as they cannot be dispatched True False.
Which of the following are plausible when using dispatching sequences and methods for setup time optimization? Automatic adjustment of setup times in planning Automatic adjustment of the setup matrix entries Dispatching several operations without gaps and in a sequence Always a feasible production plan.
Products can be manufactured alternative work centers, however, an alternative routing an alternative production version need to be created for each work center since alternative work centers can differ in their production rates and others characteristics True False.
In mass processing, the operation data can be changed according to user-specific requirements True False.
In which of the following ways can you model downtimes of work centers capacities? Defining special downtime work centers without activity types Defining non-working periods in factory calendars Creating alternative resources to relieve the non-working capacity Defining time periods that are not plannable in the planning table.
Which of the following Statement is correct? SAP Fiori is primarily a tool for analytical evaluations SAP Fiori is a collection of UX-driven apps SAP Fiori offers single complex transaction for many user roles.
Which of the following statements are correct? Production orders are mainly used in mass production Production orders control the whole of external procurement Production orders are integrated in the functions of Production Planning When a production order is created, a production version is selected Kanban offers an alternative for the use of production orders.
Which of the following statements are correct? Production orders can be created by planned order conversion Planned order conversion is only possible in background processing Production orders can be created by the conversion of purchase requisition Production orders can be created for sales orders Production orders cannot be created without material.
Which of the following statements are correct? Production orders can be created without master data The selection of the master data for production order is made by the selection of production versions The usage of quota arrangements is mandatory if several production version exist.
Which of the following statements is correct? The planned costs for internal activities are calculated from the process costs The planned costs for material components are calculated by: Planned quantity*price The planned costs for internal activities are defined in the material master of the product.
Which of the following statements are correct? A production order cannot be released with status MSPT An availability check can be triggered automatically or manually On Order creation, only stocks can be checked The scope of check is determined uniquely for each material component per order type and plant You assign a checking rule to each material in the material master.
Which of the following statements are correct? Tabular planning tables enable you to carry out time-continuous finite scheduling An Operation status DSPT is also set as a result of capacity availability checks Capacity evaluation and leveling can be performed with the tools and methods in Capacity Requirements Planning (CRP) and Production Planning / Detailed Scheduling (PP/DS) The available capacities are defined in the routings A dispatched operations is given the status DSPT.
Which of the following statements are correct? An availability check can be executed automatically at order release System status can be set or deleted by a user status The production order must have status Released so that goods movements and confirmations can be performed Shop floor papers can also be printed with status CRTD A production scheduling profile has to be assigned to work centers.
Which of following statements are correct? The scheduling margin key determines the print output of an operation There are two prints modes: Original print and reprint As a prerequisite for printing shop floor paper, the print control must be set up in Customizing Shop floor cannot be printed in the dialog Various production order lists can be printed by calling SAPscript or PDF-based forms in print programs.
Which of the following statements are correct? The issue location can be defined in the material master For materials to be backflushed, no issue storage location can be determined You can use the picking list to transfer material stock With EWM, material components are staged in storage bins in production based on warehouse orders You can control backflushing in the material master.
Which of the following statements are correct? Goods receipt from production can only be posted manually when the order is confirmed The automatic goods receipt can be set either via the control key of an operation or via the production control profile in the material master of the product The proposal for the storage location of the goods receipt comes from the production scheduling profile When the Delivery Completed indicator is set, you cannot post goods receipts for remaining quantities The proposal for checking delivery tolerances originate from Work Scheduling view of the material master.
Which of the following statements are correct? The deletion or archiving of orders can be only be carried out in mass processing The order must be delivered or technically completed in order to set the deletion flag Prerequisites to set the deletion flag are: There are no payables and functions requests for confirmations, the costs balance = 0 The order must have status CLSD in order to set the deletion flag.
Which of the following statements are correct? Assembly orders can be created with planning strategy 82 Availability checks can be automatically triggered by confirmations Production orders for rework can automatically be created via trigger points Capacity levelling cannot be performed by background processing Collective orders are created via trigger points.
Which of the following statements are correct? Manufacturing for production engineering and operations closes the gap between manufacturing and plant maintenance Production Engineering strives to bridge the gap between the manufacturing and design engineering by providing a seamless process flow and a more detailed definition of the process plan Production Engineering provides Shop Floor Routings with less detail more effective data maintenance Production operations provides you with the features you requires to provide more detailed instructions for your production operators, to verify that the production process has been executed properly and to record production progress data Production operations provides you with the features you need to verify that the production process has been executed properly and to record production progress data.
Which of the following statements are correct? Shift notes and shift reports are two separate means of documenting special occurrences within a shift with reference to a sales order You use the shift note in order to enter times and comments for an event that cannot be entered elsewhere in the system A shift report is a PDF document that is created automatically by the background processing The shift report serves to collect all the important information on a work center or work center hierarchy in a shift Shift reports can be changed at any times.
Which of the following are scheduling time elements of an operation? Queue time Setup time Processing time Teardown time Wait time Move time.
Which of the following are options to perform confirmations? Production order confirmation Time event confirmation Time ticket confirmation Collective entry Milestone confirmation Progress confirmation.
Order-related COC and product-related COC are the available variants of costs object controlling (COC) True False.
Which of the following are information systems for Batch Management? Batch Information Cockpit BMBC Batch Where-Used-List Excess Component Consumption WIP-Batches.
Which of the following options are available for external processing of production orders via data exchange with the process control? PP-PDC Interface PI-PCS Interface and Work Instructions SAP PCo SAP MII SAP ME.
Split with same material, split with other material and split to warehouses are the split methods available for order splits True False.
Which of the following make use of the Material Requirements Planning (MRP) run? Period-based planning and production Planning for discrete manufacturing Integrated business planning Assembly processing with production order.
Which of the following belong to production master data in SAP S/4 HANA? Work center Stock transfer Product cost collector Bill of materials.
A planning strategy supports make-to-stock production in case you may not start production or purchasing, until you receive a sales order True False.
If you use mode 1 do not maintain the backward consumption interval, only the requirements on the current day are consumed True False.
This indicator for individual requirements means that the material is being specially manufactured or produced for a sales order. An individual segment is specially created for each requirement. An individual requirement is only created if the higher-level material does not generate a collective requirement ECC indicator 1 ECC indicator 2.
This indicator for collective requirements means that the materials is produced or procured for various requirements. The requirements are contained in the net requirements segment ECC indicator 1 ECC indicator 2.
If materials have been created before activating the MRP run for a plant, you must create an entry in the planning file for all MRP-relevant materials in the plant True False.
Which alerts types does the Alert Monitor in SAP S/4 HANA Advanced Planning offer? Error Notification Information Warning.
Which of the following tasks can you do with the product view in SAP S/4 HANA Advanced Planning? Interactive planning Change procurement elements Start optimization run Set up ATP check.
Sales orders consumes planned independent requirements after the customer requirement Forward consumption (consumption mode 3) Backward consumption (consumption mode 1).
Sales orders consumes planned independent requirements before the customer requirement Forward consumption (consumption mode 3) Backward consumption (consumption mode 1).
Which of the following are benefits of improved MRP and PP with Suite on SAP HANA? More frequent MRP runs providing more timely and accurate material stock information Only visibility to materials shortages from a site specific and material point of view Single, real-time view of material shortage information across sites without having to navigate across multiple ERP transactions New views of material shortages from a sales order, inventory and procurement point of view, instead of just a material view New ability to simulate recommended solution viability and effectiveness in real time across sites and thousands of material situations.
Which of the following components belong to SAP Integrated Business Planning (SAP IBP)? Production Planning and Detailed Scheduling Demand Response and Supply Available to Promise.
Which traditional components can you replace with the embedded PP/DS in SAP S/4 HANA? Demand Planning (DP) Standard SOP Capacity Requirement Planning (CRP) Material Requirement Planning (MRP).
Which master data object must you CIF-transfer from an ERP system, to obtain a resource on the SAP SCM system side? Plant Work center capacity Material MRP area.
Which of the following are affected by the individual / Collective indicator? The procurement type The scheduling of the procurement element The way of inventory management Make-to-order vs Make-to-stock production.
What happens with consumption in terms of planning strategies? Planned independent requirements can consume sales order Sales order can consume planned independent requirements Sales order can reduce stock Planned independent requirements can reduce stock.
What is safety stock in material requirements planning? An unrestricted-use stock A blocked stock A requirement A receipt.
In terms of PP/DS in SAP S/4 HANA what is heuristic? A customizing setting for advanced planning A function module with control parameters A set of statistical planning parameters for the planning run A job to be run with year end closing activities of the current year.
Which kinds of heuristics exist in SAP S/4 HANA PP/DS? Process Control Heuristics Product Heuristics Performance Heuristics Service Heuristics.
Which settings do you find in a detailed scheduling strategy? Whether scheduling takes place in non-working times Whether planned orders or purchase requisitions are created The planning direction, starting from the desired date The lot-sizing procedure.
Which tool is the central tool for interactive capacity planning in SAP S/4 HANA Advanced Planning? Product View Product Overview Detailed Scheduling Planning Board Planning Table.
Which of the following are apps provided for detailed scheduling in SAP S/4 HANA? Capacity Overview Table Gap Analysis Heuristic Monitor Capacity Utilization Production Scheduling Board.
MRP Live cannot execute the PP/DS planning and the production planning in SAP S/4 HANA in parallel True False.
What does the PP/DS optimizer optimize? It maximizes the ROI It minimizes an objective function It minimizes the resource utilization It minimizes the number of possible solutions.