Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONadminitracion de recursos empresariales

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
adminitracion de recursos empresariales

Description:
test sobre administración de recursos empresariales

Author:
Juan Marcos Hernández Durán
(Other tests from this author)

Creation Date:
25/08/2017

Category:
Others

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
What is a feature of the simu-lation mode for material requirements planning in SAP ECC? It posts planning results to the database automatically. It propagates exception messages from a component to the finished product It calculates the delay time which may occur in planning. It triggers multilevel bottom-up scheduling.
Which of the following functions does SAP Supply Chain Management (SCM) offer? Planning and optimization of supply chains across company boundaries. Optimization of the procurement strategy with the supplier pool. Product development, safety, quality, and maintenance. Communication to customers through different interaction channels.
What sequence do you follow in master data maintenance to define the production of a material? Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center.
In what sequence are the steps of material requirements planning performed in SAP ECC? 1. Net requirements calculation2. Lot sizing3. Scheduling4. Determination of the procurement type 1. Calculation of safety stock2. Lot sizing3. Scheduling4. Determination of the procurement type 1. Net requirements calculation2. Lot sizing3. Determination of the procurement type4. Scheduling 1. Availability check2. Lot sizing3. Determination of the procurement type4. Scheduling.
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data: - Start: 7:00:00 a.m. - End: 3:00:00 p.m. - Break duration: 1 hour - Rate of utilization: 80% - Overload: 110% - Number of individual capacities: 1 How large is the standard available capacity? 7 hours 6.16 hours 5.6 hours 8 hours.
For which of the following objects can you enter a confirmation? (Choose two) Production order Production order operation Trigger Point Work Center.
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two) At the client level At the plant level At the company code level At the business area level.
What could be a consequence of the confirmation of an operation? Settlement of the actual costs Reduction of capacity requirements Rescheduling of the production order Udate of the planned costs.
In which master data object do you set the standard values for an operation? Work Center Production Resource/Tool (PRT) Material Master Routing.
You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months you have planned requirements with requirement type LSF (derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following statements are applicable in this case? (Choose two) You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
Which activity can trigger an automatic availability check for the components of a production order? Goods receipt for a missing part Material staging Order release Order rescheduling.
In the SAP ECC system, a material is produced using production orders. The planning table of repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot). What could be the reason? The repetitive manufacturing indicator has not been set. There are no requirements present. There is no valid production version for this material. There are no planned orders or production orders present.
Which objects can affect the calculation of capacity requirements for an operation? (Choose three) Standard values (routing) Transport time (routing) Operation control key (routing) Formulas (work center) In-house production time (material master).
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master. How is the resulting firming interval specified in this scenario? By the firming mechanism that spans further into the future. By the manual firming date. It is predefined in Customizing. By the planning time fence from the material master.
Which property applies for consumption with planning strategy 40 (planning with final assembly)? Consumption can result in subsequent adjustments of planned receipts. Consumption can reduce the originally planned production quantity. Consumption takes place with the planning material. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
What option for selecting a routing exists when creating a production order? Automatic selection based on settings in the production scheduling profile Manual selection based on the list of routings maintained in the material master Automatic selection of a reference operation set Manual selection based on settings in the order type-dependent parameters.
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. What procedure do you recommend for setting the planning horizon? Set the planning horizon in the MRP groups in Customizing and assign variant entries via the plant parameter settings. Set the planning horizon in Customizing using the plant parameter settings and assign variant entries via the MRP groups for the corresponding materials. Set the planning horizon in the MRP groups in Customizing and store the variant values in the material masters for the corresponding materials. Set the planning horizon in the plant parameters in Customizing and store variant entries in the material masters for corresponding materials.
Which of the following requirements is supported by using process orders? Linkage of documents to orders Use of reference operation sets Use of production/resource tools Documentation of the production using an electronic batch record.
Which of the following consequences result when a production order is set to Technically Complete (TECO)? (Choose three) Confirmations are no longer permitted. Reservations are no longer relevant for material requirements planning. The order and its operations receive the system status Locked (LKD). Capacity requirements are set to null. The order is no longer relevant for material requirements planning.
What master data do you need for material replenishment using the KANBAN procedure? (Choose two) Production supply area Product cost collector Rate routing Production version Control cycle.
What can you use to organize material staging for production orders? (Choose three) Transfer orders Logistics Information System (LIS) KANBAN Material documents Pull list.
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this scenario? Planned orders that are created by requirements planning are shifted to the end of the planning time fence. Requirements planning considers only changes that are relevant for scheduling within the planning time fence. The MRP controller cannot create planned orders within the planning time fence. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
Which Customizing element controls the determination of planned costs in production orders? Costing variant Calculation procedure Settlement profile Accounting type.
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing? Lead time scheduling cannot take place. Requirements planning creates an appropriate exception message in basic dates scheduling. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Where in the SAP ECC system can you define production versions? In the bill of material In the work center In the material master In the routing.
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three) Standard values in the operations of routings General operation values of routings General values from work scheduling view of the material master User-defined fields in the operation of routings General item values of bill of materials.
Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer orders is correct? An ATP check creates fixed links between customer orders and their confirmed receipts. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements. If the ATP check determines non-availability. It then checks in the next step whether it is possible to procure or produce in time. The ATP quantity is the available quantity, which can be used to confirm incoming customer orders.
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procurement type properties are valid? (Choose two) If procurement type E (in-house production) is set, external procurement may still be possible depending on the material type. A material's procurement type can be freely selected between E (in-house production), F (external procurement) and X (both procurement types) independent of material type. Procurement types E (in-house production) and F (external procurement) have to be further refined with special procurement types. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
What data can be posted directly via the Plant Data Collection (PP-PDC) interface? Goods receipts Goods issues Maintenance notifications Confirmations.
What is SAP Solution Manager? A part of the SAP ECC System A managed system in a system landscape A stand-alone system that communicates with other systems in a system landscape An add-on industry solution.
You select the master data for production orders via production versions. Which information is contained in a production version? The control parameters for selecting routings and BOM The default order type to be used The routing and BOM alternatives to be used The explosion dates for the routing and BOM.
Which of the following elements can be used in a process order? (Choose three) Phases Process instructions Relationships Suboperations Parallel sequences.
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two) ATP checks are automatically performed during Material Requirements Planning (MRP) runs. ATP checks are used to evaluate the free capacity on a certain work center. ATP checks can be adjusted to also consider future requirements and receipts. ATP checks can be carried out automatically when releasing a production order. ATP checks are mandatory for lead-time scheduling.
Which master data is necessary for the creation of material reservations for production orders? Material master records Routings Production versions Production/resource tools.
Which of the following statements regarding lot size procedures is correct? The lot size quantity can be influenced using a minimum lot size and the rounding profile. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied. If a long-term lot size is used, procurement is conducted with a long-term perspective. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
In which scenario will the error message shown in the attached screenshot occur? The selection method is set to "selection only by production version" in the material master. The routing is not valid at the explosion date. The Customizing for the order type is set to manual routing selection and a valid routing exists. The material master is set to manual routing selection and a valid routing exists.
What functions can you use for suboperations? (Choose two) Material component allocation Production/Resource tools allocation Capacity planning Costing.
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released? Activate the availability check and assign an overall profile in checking control for the business function order release. Assign an appropriate availability checking rule to the material master for the product. Activate the availability check and assign an overall profile in the production scheduling profile. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three) Confirming the operation Rescheduling the operation Setting the status technically complete (TECO) Reducing the order quantity Posting the goods receipt for the production order.
Which of the following efforts can be minimized using the KANBAN procedure? Effort for Sales and Operations Planning (SOP) Organizational effort for material staging Effort for master data maintenance Organizational effort for capacity planning.
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three) Material master Bill of material Production version Task list Work center.
You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC. How can you fulfill this requirement? Use the core interface (CIF). Use the service application interface (SAPI). Use the PI-PCS interface. Use the PP-PDC interface.
Which statements regarding SAP ECC long-term planning (LTP) are correct? (Choose two) In case of external procurement, LTP creates purchase requisitions. Reorder point planned materials can be included in LTP. Generally, LTP is operational planning of important components. A planning scenario must be released to use it in LTP.
Which of the following items of master data are needed for repetitive manufacturing? (Choose three) Product cost collector Repetitive manufacturing profile Production version Production supply area Master record for serial numbers.
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. Which of the following statements are true for the two lists at this stage? (Choose two) The MRP list displays the production order. The stock/requirements list displays the production order. The stock/requirements list was updated at the precise time it was accessed. The MRP list has the status "processed". .
In which of the following objects can you activate backflushing for production orders? (Choose three) Production scheduling profile Material master (finished product) Material master (component) Routing Work center.
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements? When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run. In multi-level backward scheduling, dependent requirements are calculated to the exact second. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur. What could be the reason? (Choose two) Requirement planning has not been carried out. The MRP elements are linked via fixed pegging The fixed planned order is outside the rescheduling horizon. The delta between the availability dates falls within the tolerance window defined in Customizing.
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three) A suitable repetitive manufacturing profile that contains an option for automatic line selection Manual assignment of planned production quantities in a planning table Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP) Automatic selection of the production version in material requirements planning (MRP) using selection methods setting A planning algorithm from capacity planning.
You want to enhance the system statuses of a production order with user statuses. How do you do this? Define a status profile in Customizing and assign it to the production scheduling profile. Define the user statuses in the Customizing table of the system statuses. Define the user statuses in the order type-dependent parameters. Define a status profile in Customizing and assign it to the order type.
Which function is supported by production orders? Automatic creation of transfer orders at order release Automatic printing of order documents at order creation Automatic reading of PP master data at order release Automatic selection of a work center at order release.
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three) Availability check Digital signature Resource selection Electronic batch record Approved master recipes.
Which of the following statements about consumption are correct? (Choose two) Consumption takes place on the material level between the planned independent requirements and the planned orders. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group. Consumption is restructured with the planning run. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
Where can you define the valid receivers for production order costs? In the valuation variant In the production scheduling profile In the settlement profile In the costing variant.
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective? Interactive single-item planning for the delayed assembly Multi-level single-item planning with the "simulation mode" option Total planning online Multi-level single-item planning with the "display material list" option.
What does SAP ERP mean? SAP ERP is a planning system in which extended planning processes can be mapped. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
Which functions can be triggered before releasing a production order? (Choose three) Confirmation Selection of a routing Scheduling Selection of a BOM Stock determination.
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you should be able to use a second sequence on other work centers for operations 30 and 40. What sequence category do you use to create the second sequence in the system? Substitute sequence Standard sequence Alternative sequence Parallel sequence.
Where can you define the default storage location for the material component of a production order? (Choose three) Material master (component) Routing Production supply area of a work center Production version (product) BOM header (product).
Which of the following statements about the planning functions available in SAP ECC is correct? Master production scheduling (MPS) refers to preferred planning of important materials. Material requirements planning (MRP) includes automatic capacity leveling. Long-term planning (LTP) is a long-term form of forecast planning. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
Which properties does ECC Master Production Scheduling (MPS) have? (Choose three) MPS items can be taken into consideration by a standard MRP run. Non-MPS items can be taken into consideration by an MPS run. The planning of MPS and Non-MPS items is always carried out in one planning run. MPS items can be defined on MRP Area level. MPS items can be defined on plant level.
You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason? Goods movements have been posted. Order papers have been printed. The material availability check has been performed. The production order has been released.
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC. On which specifications is the dynamic safety stock calculation based? The average daily demand and the desired days supply The static safety stock and the material forecast The static safety stock per day and the safety time The average daily demand and the safety time.
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000. What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC? Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
What are characteristics of repetitive manufacturing? (Choose three) Period-based planning of the quantities to be produced Production without using production orders and without status management Continuous material consumption, production flow and output Automatic line loading based on capacity limits across all production lines Shop fabrication.
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order. Which BOM item category must you set to fulfill this requirement? D (document item) M (phantom material) N (non-stock item) E (external procurement).
You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures? Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning Material requirements planning -> Demand management -> Sales and operations planning -> Longterm planning -> Capacity planning Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning.
The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use? Planning with make-to-stock (strategy 10) Planning with final assembly (strategy 40) Planning at the assembly level (strategy 70) Planning without final assembly (strategy 50).
Which of the following features are offered by MRP areas in SAP ECC? (Choose two) An MRP area may include different storage locations. Subcontracting is supported by MRP areas. Make-to-order production is supported by storage location MRP areas. A storage location may be assigned to different MRP areas.
You want to create a new material with the following properties: the material is kept in stock, is externally procured, and is used as a component in the bills of material for various final products. The material must not be sold directly. Which standard SAP material type do you use? HAWA (trading good) ROH (raw material) NLAG (non-stock material) FERT (finished product).
The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement? Maintain appropriate checking rules in checking control for order creation and order release. Maintain appropriate availability checking rules in the production scheduling profile. Maintain an appropriate availability checking group in the material master. Maintain appropriate availability checking rules in the order type-dependent parameters.
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt? Set "Container in transport" Set "Container empty" Set "Container full" Set "Container in process".
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type. What does a firming type define? (Choose two) Handling new requirements within the planning time fence. Handling new procurement proposals that need to be created due to new requirements within the planning time fence. Handling existing procurement proposals outside the planning time fence. Handling existing procurement proposals within a planning time fence.
Which of the following master data can be used with process orders? (Choose three) Serial numbers Production versions Resources Master recipies Production/resource tools.
During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two) Work center Planned order Product cost collector Production order.
Which of the following properties applies to multi-site planning in SAP ECC? Multi-site planning can be activated using the corresponding planning strategy. Both withdrawal from alternative plant and stock transfer from another plant are defined via special procurement keys. The use of "scope of planning" (cross-plant total planning) is mandatory for multi-site planning. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three) Finite capacity scheduling Setup time reduction Midpoint scheduling Lot size optimization Batch size optimization.
Which of the following scheduling types can only be used within capacity planning? Forwards Only capacity requirements Backwards Midpoint.
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG). What is the easiest way to fulfill this requirement? Create a new material with a reference to the original material and assign the metric unit of measure to the new material master. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1 Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand. How can you fulfill these requirements in SAP ECC? (Choose two) Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Report abuse Consent Terms of use