What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Default values for the item status Default unit of measure Maximum allowed low-level code Allowed material type.
Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. The Selection Method must be set to “2 Selection by production version”. A repetitive manufacturing profile must be assigned on the MRP4 view An overall profile be assigned on the Work Scheduling view At least one valid production version must exist on the MRP4 view.
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Please choose the correct answer. Number of individual capacities Available capacity version Work center category Capacity category.
Which Kanban master data object controls the relationship between the supply and demand source? Please choose the correct answer Production supply area Rate routing Kanban container Control cycle.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? Please choose the correct answer. By creating routings with parallel sequences By assigning different materials to the same routing By creating routings with alternative sequences By assigning the same production version to different materials.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material.
In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Process order Control recipe Process message PI sheet Process order Control recipe PI sheet Process message Control recipe Process order Process message PI sheet Control recipe Process order PI sheet Process message.
What must be used in the system to plan the requirements for different subcontractors separately? Planning plant Storage locations MRP areas Production versions.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? Please choose the correct answer. The production operator cannot enter additional confirmations The buyer can still see component reservations The warehouse clerk still carry out goods issue transactions The production manager can still see the capacity requirements.
Which data object can be updated with the scheduling results of a routing? Please choose the correct answer Material master Production version Production scheduling profile MRP profile.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Flow manufacturing Lock-free inventory movements Material Coverage Fiori app Rough-cut capacity planning Monitor Production Orders Fiori app.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer Make-to-order production (20) Production by lot size (30) Planning with final assembly (40) Planning without final assembly (50).
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Production Version Selection Method Contract Purchasing Info Record.
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. Multidimensional Reporting client (MDRC) ABAP Managed Core Data Services (CDS) HANA Live Smart Business Cockpit.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The checking rule from the business application The ATP category for restricted-use stock The checking group from the material master The checking control for the order type.
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Filters Scheduling Sort Drilldown Forecast.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are based on centralized planning It is mostly accomplished by manual postings It is a simplified form of production control Replenishments are created close to the actual need.
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define production scheduling profile Define scheduling parameters for production orders Define order-type-dependent parameter Define selection profiles.
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Undo for drag & Drop planning activities Enter time-ticket confirmation for production orders Change planned order quantities Change sales order quantities.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Routings (N) Reference operation sets (S) Master recipes (2) Rate routings (R).
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer. By providing replenishment proposals with exact times By providing future demands from demand figures in the past By providing multilevel material requirements planning By providing cross-plant planning and deployment.
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Outline agreement Special procurement keys Quota arrangements Production versions Purchasing info records.
Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Human Capital Management SAP Hybris Concur SAP Fieldglass SAP Visual Enterprise.
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Transfers from batch to batch Stock transfers Purchase orders Collective orders Planned orders.
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4HANA on premise SAP S/4HANA private cloud SAP S/4HANA Professional services cloud SAP S/4AHANA Enterprise Management cloud.
Which process order function uses a resource network? Please choose the correct answer Capacity leveling Resource scheduling Capacity planning Resource selection.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It links receipts from an alternative location in case of a shortage in the default location It enables the propagation of network alerts across the bill of materials structure It propagates changed sales order priorities to the pegged planned orders It replaces fixed pegging relationships unless they have been created for stock.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Supply Network Planning Capacity planning Available-to-promise Backorder processing Demand planning.
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be applied to make-to-stock production order. They can be created automatically during month end process. They can be used for manufacturing with collective orders. They can be used for repetitive manufacturing.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. Planning file entries Production list WIP list Production overview Operation list.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Lot sizes Validity dates Task list group number BOM status Work center hierarchy.
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer. Production order header status Shop floor information system Warehouse transfer order status Production order total order quantity.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of document index tables Elimination of output condition tables Elimination of customer master tables Elimination of status tables Elimination of LIS tables for rebates.
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. Stock transfer Subcontracting Vendor consignment In-house production.
Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Automatically reschedule in case of overload alerts Nominate time-dependent substitutes for a planner Automatically predict alerts in future planning cycles Automatically send alerts with Alert Notification Engine Generate alerts based on defined threshold values.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer. Warehouse order Outbound delivery order Outbound delivery request Warehouse task.
What is the correct sequence of the following Activate methodology phases? Please choose the correct answer. Prepare, Validate, Test, Go-Live Prepare, Explore, Realize, Deploy Validate, Realize, Test , Deploy Prepare, Realize, Iterate, Continuous Improvement.
Which of the following apply to MRP Live? There are 2 correct answers to this question. The definition of the planning scope is more flexible. The BAdIs for classical MRP also apply to MRP Live. Planned orders need to be converted to purchase requisitions for externally procured materials. The sequence of planning materials is calculated across plants.
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual phases Individual control recipes Individual operations Individual process instructions.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use DS heuristic “Schedule Sequence” Use multilevel MRP run for the products on the resource Use a bucket-oriented capacity check Use optimization with respect to set-up times Use rescheduling with an alternative mode.
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? Please choose the correct answer. PP Standard Sales and Operations Planning APO Demand Planning Flexible Planning Integrated Business Planning.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating material master tables By eliminating inventory tables By eliminating fields for different stock types By eliminating inventory history tables By eliminating hybrid tables.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. You require an up-to-date inventory for components When you need to determine the work in progress When goods issues can wait for final confirmation For production lines with short lead times.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer. Net change planning Planning horizon MRP list Parallel processing across servers.
On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Material master MRP controller Production order type Production controller.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to defined separate key dates for product and each assembly With respect to a common key date for product and each assembly With respect to a common change status for product and each assembly With respect to a defined separate change status for product and each assembly.
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Maintain adjustment parameter in the MRP group Use a planning strategy with requirements consumption Set the requirements reduction indicator in the requirements class Reorganize planned independent requirements.
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. Work Scheduling Basic Data 1 MRP 4 Purchasing.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Strategic analysis Real time decision support Automatic update of story boards Comparison of current data with historical data to identify trends.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Work center Production version Plant Materia.
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? Please choose the correct answer. The viability of the proposed solution The presence of production orders The presence of firmed planned orders The priority of the proposed solution.
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Please choose the correct answer Kanban Crate parts Pick parts Release order parts.
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default? There are 2 correct answers to this question. Posting of production costs to cost collector Staging of components for the next order in the sequence Archiving of backflush documents Reduction of the capacity requirements.
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Enhanced characteristics based processes Packaging Logistics Equipment and Tools Management Enhanced Kanban Processing Parts interchangeability.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has the latest data Only the OLAP system has a predefined subset of the data Multiple copies of the data exist The OLAP system needs to write back the data to the OLTP system.
What is the first step in the MRP run? Please choose the correct answer. Net requirements calculation BOM explosion Lot size calculation Source determination.
What are prerequisites for using batch derivation? There are 2 correct answers to this question. Batch determination selection conditions Batch where-used list Receiver-sender relationships Process instructions.
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer. Empty In use Wait Full.
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Please choose the correct answer Individual/Collective Indicator Dependent Requirements indicator Mixed MRP indicator Storage Location MRP Indicator.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. Work center, in the production supply area BOM, in the item for the material Routing, in the component allocation Material master of the finished product.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. Landscape transformation System upgrade System activation System conversion New implementation.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 40 – Planning with-final-assembly 50 – Planning without final assembly 20 – Make to order production 10 – Anonymous make-to-stock.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Big and affordable memory Multi core processors enabling parallelism of tasks Wide adoption of web standards such as Service oriented architecture Advances in the three-tier architecture approach Capability to add to server landscape and scale.
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question. Tear down time Floating time Move time Queue time Processing time.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Please choose the correct answer. Vendor rating Component availability Quota arrangement Costs Delivery date.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Scheduling margin key Production scheduling profile Operation control key Confirmation profile.
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question. Setup time Opening period Goods receipt processing time Float before and float after production.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. Plant Settings –> MRP Group –> Material Master MRP Group –> Material Master –> Plant Settings Material Master –> MRP Group –> Plant Settings Material Master –> Plant Settings –> MRP Group.
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Process diagrams Solution packages Configuration guides Scope items Building blocks.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Contract Production plant Material master Work center.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. The Individual/Collective indicator of the component The item category of the component in the BOM The Planning Strategy of the finished product The MRP Type of the component.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It details transaction and solution capabilities at a functional level It can have a business and a technical impact It was created for better planning and estimation of your way to S/4HANA It contains references to the relevant training material It is only a grouping of related technical simplifications.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Minimum lot sizing Periodic lot sizing Fixed lot sizing Exact lot sizing.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the MRP group In the plant parameters In the requirements class In the material master.
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Work center Bill of material Material master Routing header.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Demand consumption Backorder processing Detailed scheduling functions Heuristics Optimization.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can plan materials with recursive BOMs MRP Live can priorities demand from sales orders MRP Live can create production orders automatically MRP Live can propose alternative solutions.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? Please choose the correct answer. A user can trigger material staging via mass processing (transaction COHV). A user trigger material availability check via mass processing (transaction COHV) A user trigger printing of shop floor paper manually (transaction CO02). A user can schedule a background job to release production orders (transaction COOIS).
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question. Setting a planning time fence in the Material Master Record Assigning a production scheduling profile Creating a planned order within the planning time fence Manually changing the quantity of a planned order.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Repetitive manufacturing profile Bill of material Production version Cost collector.