Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Change planned order quantities Enter time-ticket confirmation for production orders Change sales order quantities Undo for drag & Drop planning activities.
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Please choose the correct answer. Kanban Pick parts Release order parts Crate parts.
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Scheduling Sort Forecast Filters Drilldown.
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Bill of Material Engineering Change Record Routing Production Version.
In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Process order Control recipe PI sheet Process message Control recipe Process order Process message PI sheet Control recipe Process order PI sheet Process message Process order Control recipe Process message PI sheet.
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. MRP 4 Purchasing Basic Data 1 Work Scheduling.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the material master In the requirements class In the plant parameters In the MRP group.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Production scheduling profile Scheduling margin key Operation control key Confirmation profile.
What must be used in the system to plan the requirements for different subcontractors separately? MRP areas Planning plant Storage locations Production versions.
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Occasional Expert Business partner Employee Developer.
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Enhanced characteristics based processes Parts interchangeability Enhanced Kanban Processing Packaging Logistics Equipment and Tools Management.
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Outline agreement Purchasing info records Production versions Quota arrangements Special procurement keys.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Infinite resource and infinite strategy Finite resource and finite strategy Infinite resource and finite strategy Finite resource and infinite strategy.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. When you need to determine the work in progress You require an up-to-date inventory for components When goods issues can wait for final confirmation For production lines with short lead times.
A customer is considering switching from order-related settlement to product related settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for manufacturing with collective orders. They can be applied to make-to-stock production order. They can be created automatically during month end process. They can be used for repetitive manufacturing.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer. Planning without final assembly (50) Make-to-order production (20) Planning with final assembly (40) Production by lot size (30).
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? Please choose the correct answer. The requirement no longer exists A firmed planned receipt cannot be rescheduled The requirements date occurs before that of a firmed planned receipt The requirements date occurs that of a firmed planned receipt.
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Stock transfers Purchase orders Collective orders Planned orders Transfers from batch to batch.
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Handling Unit Management Expected goods receipt Yard Management Labor Management Slotting.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Repetitive manufacturing profile Production version Cost collector Bill of material.
Which Kanban master data object controls the relationship between the supply and demand source? Please choose the correct answer. Kanban container Rate routing Control cycle Production supply area.
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Default values for the item status Allowed material type Maximum allowed low-level code Default unit of measure.
Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Hybris SAP Human Capital Management SAP Fieldglass Concur SAP Visual Enterprise.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. Routing, in the component allocation Material master of the finished product BOM, in the item for the material Work center, in the production supply area.
Which process order function uses a resource network? Please choose the correct answer. Resource selection Resource scheduling Capacity leveling Capacity planning.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Work center Material Production version Plant.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The ATP category for restricted-use stock The checking group from the material master The checking control for the order type The checking rule from the business application.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Capacity planning Demand planning Available-to-promise Supply Network Planning Backorder processing.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. Operation list Planning file entries WIP list Production list Production overview.
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual control recipes Individual operations Individual process instructions Individual phases.
Which data object can be updated with the scheduling results of a routing? Please choose the correct answer MRP profile Production version Production scheduling profile Material master.
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. Stock transfer Subcontracting In-house production Vendor consignment.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? Please choose the correct answer. A user can trigger material staging via mass processing (transaction COHV). A user can schedule a background job to release production orders (transaction COOIS). A user trigger printing of shop floor paper manually (transaction CO02). A user trigger material availability check via mass processing (transaction COHV).
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? Please choose the correct answer. The presence of production orders The presence of firmed planned orders The viability of the proposed solution The priority of the proposed solution.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Purchasing Info Record Production Version Selection Method Contract.
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Use a planning strategy with requirements consumption Set the requirements reduction indicator in the requirements class Maintain adjustment parameter in the MRP group Reorganize planned independent requirements.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material.
Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. The Selection Method must be set to “2 Selection by production version”. A repetitive manufacturing profile must be assigned on the MRP4 view At least one valid production version must exist on the MRP4 view An overall profile be assigned on the Work Scheduling view.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? Please choose the correct answer. By creating routings with alternative sequences By assigning different materials to the same routing By creating routings with parallel sequences By assigning the same production version to different materials.
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question. Float before and float after production Goods receipt processing time Opening period Setup time.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. System activation Landscape transformation New implementation System upgrade System conversion.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can priorities demand from sales orders MRP Live can create production orders automatically MRP Live can plan materials with recursive BOMs MRP Live can propose alternative solutions.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. Material Master –> MRP Group –> Plant Settings Material Master –> Plant Settings –> MRP Group Plant Settings –> MRP Group –> Material Master MRP Group –> Material Master –> Plant Settings.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer. Warehouse task Warehouse order Outbound delivery request Outbound delivery order.
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? Please choose the correct answer. APO Demand Planning Integrated Business Planning PP Standard Sales and Operations Planning Flexible Planning.
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer Production order total order quantity Shop floor information system Warehouse transfer order status Production order header status.
What is the correct sequence of the following Activate methodology phases? Please choose the correct answer. Validate, Realize, Test , Deploy Prepare, Realize, Iterate, Continuous Improvement Prepare, Validate, Test, Go-Live Prepare, Explore, Realize, Deploy.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating material master tables By eliminating hybrid tables By eliminating inventory tables By eliminating inventory history tables By eliminating fields for different stock types.
Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Generate alerts based on defined threshold values Nominate time-dependent substitutes for a planner Automatically reschedule in case of overload alerts Automatically predict alerts in future planning cycles Automatically send alerts with Alert Notification Engine.
What are prerequisites for using batch derivation? There are 2 correct answers to this question. Batch determination selection conditions Process instructions Receiver-sender relationships Batch where-used list.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Periodic lot sizing Exact lot sizing Minimum lot sizing Fixed lot sizing.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 20 – Make to order production 40 – Planning with-final-assembly 50 – Planning without final assembly 10 – Anonymous make-to-stock.
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Please choose the correct answer. Dependent Requirements indicator Storage Location MRP Indicator Mixed MRP indicator Individual/Collective Indicator.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Validity dates Lot sizes BOM status Task list group number Work center hierarchy.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. The Individual/Collective indicator of the component The MRP Type of the component The Planning Strategy of the finished product The item category of the component in the BOM.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Material master Production plant Work center Contract.
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. ABAP Managed Core Data Services (CDS) HANA Live Multidimensional Reporting client (MDRC) Smart Business Cockpit.
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question. Manually changing the quantity of a planned order Assigning a production scheduling profile Setting a planning time fence in the Material Master Record Creating a planned order within the planning time fence.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Routings (N) Reference operation sets (S) Master recipes (2) Rate routings (R).
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer. By providing cross-plant planning and deployment By providing replenishment proposals with exact times By providing multilevel material requirements planning By providing future demands from demand figures in the past.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Only the OLAP system has the latest data The OLAP system needs to write back the data to the OLTP system Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has a predefined subset of the data Multiple copies of the data exist.
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define selection profiles Define order-type-dependent parameter Define production scheduling profile Define scheduling parameters for production orders.
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4HANA on premise SAP S/4HANA Professional services cloud SAP S/4HANA private cloud SAP S/4AHANA Enterprise Management cloud.
Which of the following apply to MRP Live? There are 2 correct answers to this question. The BAdIs for classical MRP also apply to MRP Live. The sequence of planning materials is calculated across plants. The definition of the planning scope is more flexible. Planned orders need to be converted to purchase requisitions for externally procured materials.
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Bill of material Material master Routing header Work center.
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default? There are 2 correct answers to this question. Posting of production costs to cost collector Staging of components for the next order in the sequence Reduction of the capacity requirements Archiving of backflush documents.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP order Fulfillment replaces ERP SD Availability Checking Settlement Management replaces ERP SD Rebates SAP GTS replaces ERP SD Foreign Trade SAP Sales Support replaces SAP CRM.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of output condition tables Elimination of status tables Elimination of customer master tables Elimination of LIS tables for rebates Elimination of document index tables.
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question. High product stability Low product stability High product complexity Low product complexity.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Rough-cut capacity planning Monitor Production Orders Fiori app Flow manufacturing Material Coverage Fiori app Lock-free inventory movements.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer. Net change planning Planning horizon Parallel processing across servers MRP list.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It details transaction and solution capabilities at a functional level It can have a business and a technical impact It was created for better planning and estimation of your way to S/4HANA It is only a grouping of related technical simplifications It contains references to the relevant training material.
What is the first step in the MRP run? Please choose the correct answer. Lot size calculation Source determination Net requirements calculation BOM explosion.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. It is mostly accomplished by manual postings It is a simplified form of production control Replenishments are based on centralized planning Replenishments are created close to the actual need.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Strategic analysis Real time decision support Comparison of current data with historical data to identify trends Automatic update of story boards.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to a common change status for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a defined separate change status for product and each assembly With respect to a common key date for product and each assembly.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? Please choose the correct answer. The warehouse clerk still carry out goods issue transactions The production operator cannot enter additional confirmations The production manager can still see the capacity requirements The buyer can still see component reservations.
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer. In use Empty Full Wait.
What are properties of MRP Live? There are 2 correct answers to this question. It is executed on the database server The code is written in SQL Script Data is read sequentially from the database tables It uses the same BAdis as classic MRP.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Detailed scheduling functions Heuristics Backorder processing Optimization Demand consumption.