Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONsubodh-7

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
subodh-7

Description:
subodh-7

Author:
subodh-7
(Other tests from this author)

Creation Date:
09/02/2020

Category:
Others

Number of questions: 80
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default? There are 2 correct answers to this question. Staging of components for the next order in the sequence Archiving of backflush documents Posting of production costs to cost collector Reduction of the capacity requirements.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Work center Production plant Contract Material master.
Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Generate alerts based on defined threshold values Automatically predict alerts in future planning cycles Nominate time-dependent substitutes for a planner Automatically reschedule in case of overload alerts Automatically send alerts with Alert Notification Engine.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. System upgrade System activation Landscape transformation New implementation System conversion.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question Elimination of document index tables Elimination of LIS tables for rebates Elimination of customer master tables Elimination of output condition tables Elimination of status tables.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material.
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? Please choose the correct answer. The priority of the proposed solution The viability of the proposed solution The presence of firmed planned orders The presence of production orders.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Purchasing Info Record Contract Selection Method Production Version.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Finite resource and infinite strategy Infinite resource and finite strategy Infinite resource and infinite strategy Finite resource and finite strategy.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It links receipts from an alternative location in case of a shortage in the default location It enables the propagation of network alerts across the bill of materials structure It propagates changed sales order priorities to the pegged planned orders It replaces fixed pegging relationships unless they have been created for stock.
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. Purchasing MRP 4 Work Scheduling Basic Data 1.
What is the correct sequence of the following Activate methodology phases? Please choose the correct answer. Validate, Realize, Test , Deploy Prepare, Realize, Iterate, Continuous Improvement Prepare, Validate, Test, Go-Live Prepare, Explore, Realize, Deploy.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Scheduling margin key Operation control key Confirmation profile Production scheduling profile.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Batch process are required to keep OLTP and OLAP in sync The OLAP system needs to write back the data to the OLTP system Only the OLAP system has a predefined subset of the data Only the OLAP system has the latest data Multiple copies of the data exist.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Real time decision support Strategic analysis Automatic update of story boards Comparison of current data with historical data to identify trends.
Which Kanban master data object controls the relationship between the supply and demand source? Please choose the correct answer. Kanban container Production supply area Rate routing Control cycle.
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer. Smart Business Cockpit ABAP Managed Core Data Services (CDS) Multidimensional Reporting client (MDRC) HANA Live.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. WIP list Production list Operation list Planning file entries Production overview.
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Handling Unit Management Labor Management Slotting Expected goods receipt Yard Management.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can create production orders automatically MRP Live can plan materials with recursive BOMs MRP Live can priorities demand from sales orders MRP Live can propose alternative solutions.
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Sort Scheduling Drilldown Forecast Filters.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It contains references to the relevant training material It was created for better planning and estimation of your way to S/4HANA It details transaction and solution capabilities at a functional level It is only a grouping of related technical simplifications It can have a business and a technical impact.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? Please choose the correct answer. By creating routings with alternative sequences By creating routings with parallel sequences By assigning the same production version to different materials By assigning different materials to the same routing.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. The Individual/Collective indicator of the component The item category of the component in the BOM The MRP Type of the component The Planning Strategy of the finished product.
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question. Float before and float after production Setup time Goods receipt processing time Opening period.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer. Make-to-order production (20) Planning with final assembly (40) Production by lot size (30) Planning without final assembly (50).
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer. Production order header status Shop floor information system Production order total order quantity Warehouse transfer order status.
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Purchasing info records Special procurement keys Production versions Outline agreement Quota arrangements.
Which data object can be updated with the scheduling results of a routing? Please choose the correct answer MRP profile Production version Production scheduling profile Material master.
What are properties of MRP Live? There are 2 correct answers to this question. The code is written in SQL Script It is executed on the database server It uses the same BAdis as classic MRP Data is read sequentially from the database tables.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Big and affordable memory Wide adoption of web standards such as Service oriented architecture Multi core processors enabling parallelism of tasks Advances in the three-tier architecture approach Capability to add to server landscape and scale.
Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. At least one valid production version must exist on the MRP4 view The Selection Method must be set to “2 Selection by production version”. A repetitive manufacturing profile must be assigned on the MRP4 view An overall profile be assigned on the Work Scheduling view.
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Developer Expert Occasional Employee.
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Routing Engineering Change Record Bill of Material Production Version.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to a common change status for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a defined separate change status for product and each assembly With respect to a common key date for product and each assembly.
How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer By defining a status profile and assigning it to the order type By creating a user profile and assigning it to the production scheduling profile By enhancing the system status customizing table with user statuses By activating the user statuses in status and action management.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer Outbound delivery order Warehouse task Outbound delivery request Warehouse order.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Supply Network Planning Available-to-promise Demand planning Backorder processing Capacity planning.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the MRP group In the material master In the requirements class In the plant parameters.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Material Coverage Fiori app Lock-free inventory movements Flow manufacturing Monitor Production Orders Fiori app Rough-cut capacity planning.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating inventory history tables By eliminating hybrid tables By eliminating inventory tables By eliminating material master tables By eliminating fields for different stock types.
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question. Move time Tear down time Processing time Queue time Floating time.
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? Please choose the correct answer. APO Demand Planning PP Standard Sales and Operations Planning Integrated Business Planning Flexible Planning.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer. MRP list Parallel processing across servers Planning horizon Net change planning.
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Allowed material type Maximum allowed low-level code Default values for the item status Default unit of measure.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Lot sizes Task list group number BOM status Work center hierarchy Validity dates.
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Equipment and Tools Management Enhanced characteristics based processes Enhanced Kanban Processing Packaging Logistics Parts interchangeability.
What must be used in the system to plan the requirements for different subcontractors separately? Planning plant MRP areas Storage locations Production versions.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP Sales Support replaces SAP CRM SAP GTS replaces ERP SD Foreign Trade Settlement Management replaces ERP SD Rebates SAP order Fulfillment replaces ERP SD Availability Checking.
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question. High product complexity Low product stability High product stability Low product complexity.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. Routing, in the component allocation BOM, in the item for the material Material master of the finished product Work center, in the production supply area.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Production version Bill of material Repetitive manufacturing profile Cost collector.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? Please choose the correct answer. The production manager can still see the capacity requirements The production operator cannot enter additional confirmations The warehouse clerk still carry out goods issue transactions The buyer can still see component reservations.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Please choose the correct answer Delivery date Costs Quota arrangement Component availability Vendor rating.
On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Production order type Production controller Material master MRP controller.
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Collective orders Transfers from batch to batch Planned orders Stock transfers Purchase orders.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer Periodic lot sizing Exact lot sizing Minimum lot sizing Fixed lot sizing.
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer By providing multilevel material requirements planning By providing future demands from demand figures in the past By providing cross-plant planning and deployment By providing replenishment proposals with exact times.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use a bucket-oriented capacity check Use optimization with respect to set-up times Use rescheduling with an alternative mode Use DS heuristic “Schedule Sequence” Use multilevel MRP run for the products on the resource.
What is the first step in the MRP run? Please choose the correct answer. Lot size calculation Net requirements calculation Source determination BOM explosion.
In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Control recipe Process order PI sheet Process message Control recipe Process order Process message PI sheet Process order Control recipe Process message PI sheet Process order Control recipe PI sheet Process message.
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Please choose the correct answer Capacity category Work center category Number of individual capacities Available capacity version.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Heuristics Optimization Detailed scheduling functions Backorder processing Demand consumption.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Reference operation sets (S) Routings (N) Rate routings (R) Master recipes (2).
Which of the following apply to MRP Live? There are 2 correct answers to this question. The definition of the planning scope is more flexible. Planned orders need to be converted to purchase requisitions for externally procured materials. The BAdIs for classical MRP also apply to MRP Live. The sequence of planning materials is calculated across plants.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are based on centralized planning It is mostly accomplished by manual postings It is a simplified form of production control Replenishments are created close to the actual need.
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Enter time-ticket confirmation for production orders Change planned order quantities Change sales order quantities Undo for drag & Drop planning activities.
Which process order function uses a resource network? Please choose the correct answer. Resource scheduling Capacity leveling Capacity planning Resource selection.
What are prerequisites for using batch derivation? There are 2 correct answers to this question. Batch determination selection conditions Receiver-sender relationships Batch where-used list Process instructions.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The checking group from the material master The ATP category for restricted-use stock The checking rule from the business application The checking control for the order type.
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer Wait Empty Full In use.
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual operations Individual process instructions Individual phases Individual control recipes.
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question. Assigning a production scheduling profile Creating a planned order within the planning time fence Setting a planning time fence in the Material Master Record Manually changing the quantity of a planned order.
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4HANA Professional services cloud SAP S/4HANA private cloud SAP S/4HANA on premise SAP S/4AHANA Enterprise Management cloud.
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be created automatically during month end process. They can be applied to make-to-stock production order. They can be used for repetitive manufacturing They can be used for manufacturing with collective orders.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer Material Master –> MRP Group –> Plant Settings MRP Group –> Material Master –> Plant Settings Plant Settings –> MRP Group –> Material Master Material Master –> Plant Settings –> MRP Group.
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Maintain adjustment parameter in the MRP group Set the requirements reduction indicator in the requirements class Use a planning strategy with requirements consumption Reorganize planned independent requirements.
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define selection profiles Define order-type-dependent parameter Define production scheduling profile Define scheduling parameters for production orders.
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. In-house production Subcontracting Vendor consignment Stock transfer.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? Please choose the correct answer. The requirement no longer exists The requirements date occurs before that of a firmed planned receipt A firmed planned receipt cannot be rescheduled The requirements date occurs that of a firmed planned receipt.
Report abuse Consent Terms of use