In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? Please choose the correct answer. The priority of the proposed solution The viability of the proposed solution The presence of firmed planned orders The presence of production orders.
How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer By defining a status profile and assigning it to the order type By activating the user statuses in status and action management By creating a user profile and assigning it to the production scheduling profile By enhancing the system status customizing table with user statuses.
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Stock transfers Planned orders Transfers from batch to batch Purchase orders Collective orders.
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer. Full Empty In use Wait.
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Sort Forecast Drilldown Scheduling Filters.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer Planning without final assembly (50) Planning with final assembly (40) Production by lot size (30) Make-to-order production (20).
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? Please choose the correct answer. APO Demand Planning PP Standard Sales and Operations Planning Flexible Planning Integrated Business Planning.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can create production orders automatically MRP Live can priorities demand from sales orders MRP Live can propose alternative solutions MRP Live can plan materials with recursive BOMs.
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Change sales order quantities Enter time-ticket confirmation for production orders Undo for drag & Drop planning activities Change planned order quantities.
What must be used in the system to plan the requirements for different subcontractors separately? MRP areas Storage locations Planning plant Production versions.
What is the first step in the MRP run? Please choose the correct answer. BOM explosion Lot size calculation Source determination Net requirements calculation.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? Please choose the correct answer. A user trigger printing of shop floor paper manually (transaction CO02). A user trigger material availability check via mass processing (transaction COHV) A user can trigger material staging via mass processing (transaction COHV). A user can schedule a background job to release production orders (transaction COOIS).
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer. Parallel processing across servers Net change planning MRP list Planning horizon.
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. Stock transfer Subcontracting Vendor consignment In-house production.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Automatic update of story boards Real time decision support Comparison of current data with historical data to identify trends Strategic analysis.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Only the OLAP system has the latest data The OLAP system needs to write back the data to the OLTP system Only the OLAP system has a predefined subset of the data Batch process are required to keep OLTP and OLAP in sync Multiple copies of the data exist.
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Use a planning strategy with requirements consumption Maintain adjustment parameter in the MRP group Reorganize planned independent requirements Set the requirements reduction indicator in the requirements class.
What are pillars of SAP Activate? There are 2 correct answers to this question. Premium engagement SAP Best Practices SAP Max Attention Guided Configuration.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? Please choose the correct answer By assigning the same production version to different materials By creating routings with alternative sequences By creating routings with parallel sequences By assigning different materials to the same routing.
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Please choose the correct answer. Kanban Crate parts Release order parts Pick parts.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Material master Contract Production plant Work center.
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer By providing multilevel material requirements planning By providing future demands from demand figures in the past By providing cross-plant planning and deployment By providing replenishment proposals with exact times.
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Equipment and Tools Management Enhanced Kanban Processing Packaging Logistics Parts interchangeability Enhanced characteristics based processes.
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Allowed material type Default values for the item status Default unit of measure Maximum allowed low-level code.
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question. Move time Tear down time Queue time Processing time Floating time.
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual process instructions Individual phases Individual operations Individual control recipes.
Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Hybris Concur SAP Human Capital Management SAP Fieldglass SAP Visual Enterprise.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It is only a grouping of related technical simplifications It was created for better planning and estimation of your way to S/4HANA It details transaction and solution capabilities at a functional level It contains references to the relevant training material It can have a business and a technical impact.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? Please choose the correct answer. The Planning Strategy of the finished product The MRP Type of the component The Individual/Collective indicator of the component The item category of the component in the BOM.
In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Control recipe Process order PI sheet Process message Control recipe Process order Process message PI sheet Process order Control recipe Process message PI sheet Process order Control recipe PI sheet Process message.
You are using the document management system (DMS) . Where should the DMSdocument links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Material master Bill of material Work center Routing header.
Which data object can be updated with the scheduling results of a routing? Please choose the correct answer Production version Production scheduling profile Material master MRP profile.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Master recipes (2) Routings (N) Rate routings (R) Reference operation sets (S).
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Routing Production Version Bill of Material Engineering Change Record.
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4AHANA Enterprise Management cloud SAP S/4HANA private cloud SAP S/4HANA on premise SAP S/4HANA Professional services cloud.
Which of the following apply to MRP Live? There are 2 correct answers to this question. Planned orders need to be converted to purchase requisitions for externally procured materials. The definition of the planning scope is more flexible. The BAdIs for classical MRP also apply to MRP Live. The sequence of planning materials is calculated across plants.
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question. Low product complexity High product complexity Low product stability High product stability.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The checking rule from the business application The checking group from the material master The ATP category for restricted-use stock The checking control for the order type.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Production scheduling profile Scheduling margin key Confirmation profile Operation control key.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the plant parameters In the material master In the MRP group In the requirements class.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to a common key date for product and each assembly With respect to a defined separate change status for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a common change status for product and each assembly.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer. Outbound delivery order Outbound delivery request Warehouse task Warehouse order.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Heuristics Demand consumption Optimization Detailed scheduling functions Backorder processing.
On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Production order type Production controller MRP controller Material master.
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. Basic Data 1 MRP 4 Work Scheduling Purchasing.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use a bucket-oriented capacity check Use optimization with respect to set-up times Use multilevel MRP run for the products on the resource Use DS heuristic “Schedule Sequence” Use rescheduling with an alternative mode.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It links receipts from an alternative location in case of a shortage in the default location It replaces fixed pegging relationships unless they have been created for stock It enables the propagation of network alerts across the bill of materials structure It propagates changed sales order priorities to the pegged planned orders.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. Planning file entries Operation list Production list Production overview WIP list.
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define scheduling parameters for production orders Define order-type-dependent parameter Define production scheduling profile Define selection profiles.
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Building blocks Configuration guides Process diagrams Scope items Solution packages.
What is the correct sequence of the following Activate methodology phases? Please choose the correct answer. Prepare, Realize, Iterate, Continuous Improvement Validate, Realize, Test , Deploy Prepare, Explore, Realize, Deploy Prepare, Validate, Test, Go-Live.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP GTS replaces ERP SD Foreign Trade Settlement Management replaces ERP SD Rebates SAP order Fulfillment replaces ERP SD Availability Checking SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP Sales Support replaces SAP CRM.
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question. Float before and float after production Setup time Opening period Goods receipt processing time.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. Landscape transformation System activation System conversion System upgrade New implementation.
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of LIS tables for rebates Elimination of output condition tables Elimination of status tables Elimination of document index tables Elimination of customer master tables.
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer Warehouse transfer order status Production order header status Production order total order quantity Shop floor information system.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? Please choose the correct answer The requirements date occurs that of a firmed planned receipt The requirements date occurs before that of a firmed planned receipt The requirement no longer exists A firmed planned receipt cannot be rescheduled.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Minimum lot sizing Exact lot sizing Periodic lot sizing Fixed lot sizing.
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Purchasing info records Production versions Quota arrangements Special procurement keys.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer Bill of material Cost collector Repetitive manufacturing profile Production version.
A customer is considering switching from order-related settlement to product related settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for manufacturing with collective orders. They can be created automatically during month end process. They can be applied to make-to-stock production order They can be used for repetitive manufacturing.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. Plant Settings –> MRP Group –> Material Master Material Master –> MRP Group –> Plant Settings MRP Group –> Material Master –> Plant Settings Material Master –> Plant Settings –> MRP Group.
What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are based on centralized planning It is a simplified form of production control Replenishments are created close to the actual need It is mostly accomplished by manual postings.
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Please choose the correct answer. Mixed MRP indicator Individual/Collective Indicator Dependent Requirements indicator Storage Location MRP Indicator.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Please choose the correct answer. Component availability Vendor rating Quota arrangement Delivery date Costs.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Flow manufacturing Lock-free inventory movements Material Coverage Fiori app Monitor Production Orders Fiori app Rough-cut capacity planning.
Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Automatically predict alerts in future planning cycles Automatically send alerts with Alert Notification Engine Nominate time-dependent substitutes for a planner Automatically reschedule in case of overload alerts Generate alerts based on defined threshold values.
What are properties of MRP Live? There are 2 correct answers to this question. It is executed on the database server The code is written in SQL Script Data is read sequentially from the database tables It uses the same BAdis as classic MRP.
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Occasional Business partner Expert Employee Developer.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the fore casted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 20 – Make to order production 40 – Planning with-final-assembly 50 – Planning without final assembly 10 – Anonymous make-to-stock.
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Expected goods receipt Labor Management Handling Unit Management Yard Management Slotting.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Finite resource and infinite strategy Infinite resource and finite strategy Finite resource and finite strategy Infinite resource and infinite strategy.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating inventory tables By eliminating material master tables By eliminating fields for different stock types By eliminating hybrid tables By eliminating inventory history tables.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Validity dates Task list group number Work center hierarchy Lot sizes BOM status.
Which process order function uses a resource network? Please choose the correct answer Resource scheduling Capacity leveling Capacity planning Resource selection.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. BOM, in the item for the material Routing, in the component allocation Work center, in the production supply area Material master of the finished product.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. When goods issues can wait for final confirmation You require an up-to-date inventory for components For production lines with short lead times When you need to determine the work in progress.
Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. The Selection Method must be set to “2 Selection by production version”. An overall profile be assigned on the Work Scheduling view At least one valid production version must exist on the MRP4 view A repetitive manufacturing profile must be assigned on the MRP4 view.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Contract Purchasing Info Record Production Version Selection Method.