Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONA_SAc

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
A_SAc

Description:
Test for ABM1

Author:
ABM
(Other tests from this author)

Creation Date:
08/09/2021

Category:
Geography

Number of questions: 174
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
qazwsxedcrfvtgb ( uploaded 2 years )
Dear ABM , Is this set the questions for Test C_SAC_2114?
Answer
Content:
What is the What does the Side-by-Side Extensibility Option mean? Have two SAP S/4HANA instances - one for standard code, and another for custom developments Extensibility based on the SAP Cloud Platform and published Apls Transfer reporting to BW/4HANA Context-aware SAP S/4HANA extensions, focused on tight integration .
In which phase do you execute the User Acceptance Test? Realize Build and Test Deploy Final Preparation .
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? For the cloud edition, there is an additional Q-Gate for integration with on-premise systems For the cloud edition, there is an additional work stream for integration with on-premise systems For on-premise, there is an additional Q-Gate for system installation For on-premise, there are additional deliverables for the system setup .
What tool provides guidance on replacing custom code developed for SAP ERP with SAP S/4HANA functionality for the "System Conversion" transition path? Software Update Manager with Database Migration Option Software Provisioning Manager Simplification Item Check (SI-Check) SAP Code Inspector .
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps .
What tool do you use to configure an SAP Business Suite on-premise solution? Expert Configuration ABAP Workbench Configuration Composer SAP Implementation Guide .
How often will an upgrade be performed on an SAP S/4HANA Cloud, Single Tenant Edition environment? One upgrade and two feature packs per year Schedule is defined by Service Level Agreement for SAP HANA Enterprise Cloud and SAP S/4HA NA Cloud, Single Tenant Edition Services Every year Every quarter .
What is SCRUM of SCRUMS? Mechanism for gathering and validating requirements Frequent inspection of code and configuration prior to quality gates Alternative to regular SCRUM process for smaller teams Integration meeting between the various project teams .
What is the most granular level of the methodology you can view in the SAP Roadmap Viewer? Phase Task Deliverables Scenario .
What is the purpose of the scrumboard? To show the functional breakdown of the solution scope To document the results of integration testing To manage the resource load To visualize team progress .
What is the correct order of the SAP Activate Methodology phases? Prepare -> Discover -> Explore -> Realize -> Deploy -> Run Plan -> Build -> Run -> Sustain Plan -> Design -> Build -> Operate Discover -> Prepare -> Explore -> Realize -> Deploy -> Run .
In Which phase does the Transition to Operations work stream start? Explore Prepare Realize Deploy .
Which of the following is a Key Deliverable of the Prepare phase? Change Impact Analysis and Communication Plan Solution Scope and Value Determination Release and Sprint Plan Baseline Build .
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Interface setup Final testing Hyper care support Scheduling project plan .
In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP? Discover Explore Prepare Realize .
What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase? Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Technical Strategy Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Hardware Specification from Hardware Vendor .
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Navigate by assigned Delivery Mode Navigate by Project Team Member Role Navigate by work stream Navigate by RACI matrix accountability .
What do you do during Sprint Execution? Present status of selected user stories in the sprint scope on a scrumboard Hold a retrospective at the end of each week Measure the sprint progress with a percentage complete repor End a sprint when the sprint backlog items are all complete .
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? SAP S/4HANA On-Premise Edition SAP S/4HANA Cloud Edition SAP Hybris Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition .
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? During the daily SCRUM meeting During the sprint review During the sprint retrospective During user acceptance testing .
In which phase do you create a prioritized list of user requirements? Prepare Deploy Realize Explore .
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Full project SCRUM Rapid prototyping SAP Best Practices Project team training .
What can users do in the Roadmap Viewer tool? Download full SAP Activate methodology content for use off-line Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Create a customer-specific version of SAP Activate Methodology .
Which of the following is not a characteristic that the quality principles are based on? Best Practices Experience of Typical Pitfalls SAP Quality Award example winners International standard .
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Prepare Explore Realize Deploy .
In which phase do you create an ordered list of everything that is known to be needed in the product"? Deploy Realize Explore Prepare .
Which of the following content best outlines the sequence of testing within the Application Design and Configuration work stream in the Realize phase? "i. Data Migration ii. String test iii. User Acceptance Test" "i. String test ii. User Acceptance Test iii. Integration Test" "i. Integration Test ii. User Acceptance Test iii. String test" "i. String test ii. Integration Test iii. User Acceptance Test" .
What tool would you use for managing project tasks and Solution Documentation when implementing SAP S/4HANA Cloud? Implementation portal for SAP S/4HANA Cloud SAP Support Marketplace SAP Transformation Navigator SAP Roadmap Viewer .
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Task Scope Item Scenario Deliverable .
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? "a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration" "a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration" "a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration" "a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check" .
What is the focus of a SCRUM of SCRUMS in an Agile context? Backlog management Communication to the Project Management Office Integration topics Best Practice adoption .
Working in an Agile approach, what should your planning look like at the beginning of the Realize phase? User Stories are in a Ready state for NO more than the first three Sprints. Project scope and planning are completed and final. Timelines of the Sprint may differ due to the workload. Go-Live scope is fixed on the first of January the following year. .
What is the objective of a sprint retrospective meeting? Improve the SCRUM process Provide formal feedback to the project manager Review and prioritize the backlog Define the stakeholder management approach .
How many deliverables are a part of the Key Deliverable 'Project Initiation'? One Four Two Three .
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Deploy Prepare Realize Explore .
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Work Stream Key Deliverable Scenario Task .
How would you describe the Realize phase in the "New Implementation of SAP S/4HANA" transition path? Configure Configure and develop Configure and adjust custom code Configuration copy .
In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps? "Prepare Realize Explore Deploy .
Where can you find Data Migration templates SAP Best Practices Explorer SAP Cloud Appliance Library SAP Roadmap Viewer SAP S/4HANA Migration Cockpit .
When do you perform User Acceptance Testing during the Agile Build? During each Firm-up Sprint After each Sprint After Integration Testing Before Integration Testing .
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Prepare Explore "Realize " "Deploy " .
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? To activate the Best Practices content To create delta building blocks for complementary content To create customer-specific scope items To personalize activated, ready-to run business processes .
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Definition of Done Test strategy Available project resources Overall project schedule .
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Assemble and apply SAP Best Practices to the system Activate and apply SAP Best Practices content with the self-service configuration UI Apply SAP Best Practices with the Configure your Solution application Activate and apply SAP Best Practices with SAP Solution Manager .
What is a Strategy Level 0 (LO) artifact? Approach document that is developed by a united Project Team (partner + customer) Preliminary strategy developed by the customer to approach the project in a specific work stream Optional information that is NOT important for project activities Project result that is developed solely by the partner .
Where can you find Project Library Accelerators? SAP Cloud Appliance Library SAP Roadmap Viewer Fully Activated Appliance SAP Best Practices Explorer .
What accelerator can help you document the Configuration Definition in the Explore phase? Backlog template Change Request template Test Strategy Data Definition .
What can you do in the SAP Roadmap Viewer tool? Create a customer-specific version of a roadmap. Comment on Deliverables and Tasks within Roadmaps. Download full roadmap content for offline navigation. Navigate detailed Solution Implementation Roadmaps. .
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Scenario Work Stream Key Deliverable Task .
What does SAP Activate recommend to keep team members informed and aligned? Daily status meeting with project manager Daily e-mail status updates to project manager Daily progress review meeting with sponsor Daily team stand-up meeting .
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level? Definition of Ready for Sprint Scrum of Scrums meeting decision Agreed and met Acceptance Criteria within Quality Gate Definition of Done for User Story .
What accelerator can help you document the Configuration Definition in the Explore phase? Data Definition Test Strategy Change Request template Backlog template .
Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA Cloud, Single Tenant Edition" transition path? Because the Fit-to-Standard workshop is conducted using the Q-system Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business processes which should NOT be changed Because the project team uses the DEV system to confirm solution fit and define delta requirements Because the customer may use the SAP Model Company .
What is the primary purpose of the SAP Activate Methodology? To provide the sequence of actions in the project To provide end-to-end Application Lifecycle Management To manage solution documentation To enable access to the SAP ecosystem .
In which phase will the customer develop a preliminary strategy for building a target Operations and Support organizational model? Run phase Explore phase Prepare phase Discover phase .
Which key deliverable includes the development of RICEFW objects? Enhancement Delivery Development Build Sprint Execution Custom Extensions Management .
How would you describe the Explore phase in the "New Implementation of SAP S/4HANA Cloud" transition path? Fit-to-standard Simplification and Custom Code Impact Analysis Setup and Enablement Solution Validation and Delta Design .
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Realize Explore Prepare Deploy .
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud' transition path? Setup and Enablement Simplification and Custom Code Impact Analysis Fit-to-standard Solution Validation and Delta Design .
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks? Retrofit Business Process Change Analyzer SAP Code Vulnerability Analyzer SAP Code Inspector .
Which end-to-end turn-key Application Lifecycle Management (ALM) solution can support you in managing requirements and software development for large, Agile projects? Requirement Management Focused Build Solution Manager Test Suite Change Request Management .
Which of the following tools is used to install SAP S/4HANA. SAP Solution Manager SWPM (Software Provisioning Manager) Data Migration server "Cloud Application Library" .
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Deploy Explore "Realize Prepare .
Which deliverable is specific to on-premise and NOT for the cloud? " Adaptation Specification" Learning Needs Analysis Technical Design Solution Knowledge Transfer .
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Waterfall approach imited involvement of business stakeholders Design-based Start with executable content .
How are the build and test tasks planned and executed in the Realize phase? By using incremental build in fixed-scope iteration With Q-Gates for sign off after each iteration By executing regression tests after each iteration By using the sprint backlog list as input for each iteration. .
How do you gain access to the SAP Activate Methodology Jam site? Send e-mail to SAP contact address Join SAP S/4HANA group on SAP Community Network Submit e-mail address via on-line form Register on SAP Service Marketplace .
Where can you find Data Migration templates? SAP S/4HANA Migration Cockpit SAP Cloud Appliance Library SAP Roadmap Viewer SAP Best Practices Explorer .
Who determines the priority of user stories in the backlog of an Agile project? Product Owner Project Team Project Manager SCRUM Master .
When does the Scrum Team receive formal confirmation that the User Stories are completed to the satisfaction of the Product Owner? During the Sprint Retrospective During the Sprint Review During the User Acceptance Test During the daily Scrum meeting .
What is SAP Activate? A methodology for each of the deployment modes (cloud , on-premise, hybrid) A combination of SAP best practices , methodology, and guided configuration A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions A step-by-step instruction on how to remove from SAP best practices to your custom solution .
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Knowledge transfer to end users Project Documentation Project Charter Learning plan .
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? Guided Configuration SAP Best Practices SAP Activate Methodology SAP Implementation Assistant .
What tool provides sizing estimations for the "System Conversion" transition path? SAP Readiness Check SAP Best Practices Explorer Scope and Effort Analyzer SAP Transformation Navigator .
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Realize Prepare Explore Deploy .
"What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the ""New Implementation of SAP S/4HANA"" transition path?" Fit-to-Standard Design Thinking Delta Design Solution Validation .
What term is used for a Ready-to-run SAP S/4HANA system with pre-built Solution Documentation, which supports End-to-End Processes for a specific industry so that the Project Team can focus on differentiation and innovation? SAP Model Company Fully Activated Appliance SAP Cloud Appliance Library Best Practice System .
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Prepare Realize Explore Deploy .
In SAP Activate, what replaces the detailed Blueprint from ASAP? Business Process Mapping Custom Extension management Value Determination Fit/Gap Workshops .
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? "a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog" "a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops" "a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops" "a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops" .
Which accelerator can help you document the detailed design of solution extensions? Which accelerator can help you document the detailed design of solution extensions? Change Request Template RICEF Specification Template Sprint Backlog Template .
Which activity helps the Project Team add User Stories to the Product Backlog? Conducting the Solution Validation workshop Preparing a Project Schedule Assessing Project Risks Planning the User Acceptance Test .
How can SRCUM teams be organized? By work stream By job title By project phase By project governance level .
Which of the following content best outlines the scope of the Integration Test? "a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application" "a. Prototype b. Delta configuration c. Data flows between SAP solutions" "a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application" "a. Solution baseline b. Delta configuration c. Data flows between SAP solutions" .
What is the key characteristic of Agile project delivery? Frequent and detailed project scheduling Formal and detailed documentation Iterative build with frequent inspections Frequent Quality Gates .
What is a benefit of using Guided Configuration instead of the Implementation Guide It ensures configuration is done using SAP Solution Manager It eliminates the need for Content Lifecycle Management It eliminates the need to generate transport requests for configuration settings It ensures SAP updates do NOT conflict with customer configurations .
What is the purpose of the SAP Activate Methodology? To enable access to the SAP ecosystem To accelerate the initial implementation of SAP S/4HANA To provide end-to-end integrated application lifecycle management " To manage project and solution documentation" .
SAP now offers the ability to deploy and manage solutions in which of the following environments? Cloud and On-premise On-premise Cloud Cloud, On-premise and Hybrid .
What technique helps a Scrum Team to prioritize a large, flat Backlog? Fit/Gap Analysis User Story Mapping Retrospective Planning Poker .
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? Data migration End-to-End walkthrough Readiness check Solution validation .
In what respect is SAP Activate Methodology different from the ASAP Methodology? Supports cloud deployments Supports only new implementations Leverages iterative incremental build Includes Fit/Gap analysis instead of Blueprint .
What is the minimum number of Quality Gates mandated for SAP S/4HANA transition projects? 2 3 4 5.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? SAP Jam SAP Solution Manager SAP Implementation Assistant Roadmap Viewer .
What do you do during an iterative approach to build a solution? Build the solution module by module Deliver a prototype of the solution Provide a working solution only at the end of the release Include frequent inspection check-points .
What Solution Operations Framework can customers use to create a joint Business and IT organization, that will secure transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems? SAP Activate Customer Center of Expertise SAP Operations Control Center Business Transformation Management Methodology .
Which new role is introduced in the SAP Activate Methodology in a Full Scrum Team? Project Manager Application Consultant System Administrator Product Owner .
What does the Side-by-Side Extensibility Option mean Have two SAP S/4HANA instances - one for standard code, and another for custom developments Context-aware SAP S/4HANA extensions, focused on tight integration Transfer reporting to BW/4HANA Extensibility based on the SAP Cloud Platform and published Apls .
What is the purpose of a firm-up sprint? To demonstrate functionality from previous sprint To perform String test To revise a release plan and sprint plan To run end-to-end integration test .
Which of the following statements about Scrum is correct? In Scrum, the team is Self-organized, define all task necessary for all project life cycle. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). Scrum Master defines and prioritizes features and gathers requirements. In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. .
What do you do during post cutover? Setup Operational Support Perform the Verification Session of the SAP Going Live Check Perform Technical System Test Conduct Organizational Readiness Check .
Which criterion does the Product Owner use to sequence the product backlog? Resource availability Complexity Business priority Relative effort .
"What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the ""New Implementation of SAP S/4HANA"" transition path?" Solution Validation Design Thinking Delta Design Fit-to-Standard .
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity Product Owner’s relative estimate of the effort that will be needed to implement the user story .
Which of the following is not correct about workstreams? It is a collection of related deliverables It can span phases Workstreams are dependent on phase start and end It is assigned as an attribute to phases, deliverables and tasks .
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? Value determination Custom code Adjustment planning Data aging configuration Non-production systems migration .
Which of the following are the benefits of SAP JAM? Highly available User collaboration Reduced Recovery Time Easy to use .
Which of the following is not correct about Fit/Gap Analysis? Validate pre-activate and pre-assembled solution in the development system. Drive towards adopting customers processes Minimize the needs for rework during realization. Prioritize delta requirement and gaps. .
Which of the following tasks are part of the Production support after the Go Live key deliverable? Set up the Operations Control Center Perform a Technical systems test Resolve issues identified during the Hyper Care period Provide further training to customer end users .
Which of the following are part of the 10 SAP Quality Principles? Plan one phase at a time. Achieve production readiness. Start scoping early. Use standard functionality optionally. .
Which of the following tools are used for rapid database migration? Database Migration Option (DMO) Software Update Manager (SUM) SWPM (software provisioning manager) SAP Solution Manager .
What are the responsibilities of the Product Owner in release and sprint planning? Analyze the functional and technical dependencies between the user stories. Define objectives for each release. Prioritize backlog user stories by business priority. Estimate the backlog user stories. .
Which new project roles are introduced with the SAP Activate Methodology for the Agile delivery approach? SCRUM Master Product Owner Integration Lead Design Thinking Coach .
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? Quality Gate Checklist Solution Validation Workshop Sprint Backlog Template RICEF Specification Template .
Which of the following are examples of Ready-to-run SAP S/4HANA systems? Fully Activated Appliance SAP Model Company SAP Best Practices Explorer SAP Mission ControlCenter .
Which content is made available after you activate SAP Best Practices for a new financial implementation? Pre-configured business processes Implementation Guide Online help Standard chart of accounts .
What are the responsibilities of the Project Team on level 4 in the picture below? Perform status reporting and communication Set Project policy, standards and oversight Identify and resolve issues and risks Set business priorities, goals and objectives .
Which of the following belong to the Application Design and Configuration work stream for SAP S/4HANA Cloud in the Explore phase? Kick-off workshop Fit-to-standard workshop Configuration definition Integration prerequisites confirmation .
In the "New Implementation of SAP S/4HANA" transition path, which systems are part of the project system landscape? DEV P-system Starter system QAS .
How does the provisioning of SAP S/4HANA Cloud differ from the setup of SAP S/4HANA? SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems. In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated automatically after the P-system is requested through the Manage Your Solution app, whereas in an SAP S/4HANA system, the DEV system persists. To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a Starter system is required for Fit-to-standard for SAP S/4HANA Cloud. There is a Preset phase for 0-system, which is unique for SAP S/4HANA Cloud. .
What is the difference between the "New Implementation of SAP S/4HANA Cloud" and the "New Implementation of SAP S/4HANA" transition paths? SAP S/4HANA uses the Implementation Guide (IMG) and the In-App Extensibility Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and the Side-by-Side Extensibility Option. Different sets of work streams are used for these transition paths. Upgrades of SAP S 4HANA Cloud are managed by SAP,and upgrades of SAP S/4HANA are managed by the customer. .
What are two important approaches, based on the Control Center concept that SAP proposes to use for streamlined implementation and operations within Premium Engagements? Build SAP Like a Factory Always Connected Run SAP Like a Factory Intelligent Enterprise .
Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud, Single Tenant Edition? Document deviations from Golden Rules for transparency and future use in upgrades. Use SAP Solution Manager 7.2 with Focused Build. Stick to the security standards of the customer organization. Foster a cloud mindset and adherence to the Fit-to-Standard approach. .
Which activities are critical for delivering Agile projects? Blueprint scheduling Release planning Sprint planning Retrospective agenda creation .
Ready-to-use Content in SAP Activate includes which of the following? Business models from leading companies in each industry sector Courses delivered by SAP Education SAP Best Practices Project Accelerators .
Which activities are part of the Design and Configuration application of the SAP Activate methodology? Schedule kick-off workshop Confirm Integration prerequisites Perform Fit/Gap Analysis Conduct Scope Validation .
Which content packages are available in the SAP Package Library? SAP Best Practices Solution Builder Rapid Deployment Solutions SAP Activate Methodology .
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? Non-production systems migration Custom code Adjustment planning Data aging configuration Value determination .
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? Optimize software Change Control Management Access organizational and production readiness Solution Activation Training delivery .
Which of the following is true about a cloud implementation project? Starter Systems are not required to be in place for the 'Fit to Standard' workshops. The entire transport system is kept intact and up and running. The Starter System is specific to SAP S/4HANA Cloud. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement. .
How do you set up Scrum teams? Based on group size, but a minimum of 12 people By type of work, like configuration Scrum, documentation Scrum, and testing Scrum. As a cross-functional team covering multiple functions, like configuration, data loads, and testing Based on End-to-End Processes like Order-to-Cash .
In which tools can the project team across the SAP Activate Methodology content including accelerators? SAP Jam SAP Community Network Roadmap Viewer SAP Service Marketplace .
Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of SAP S/4HANA Cloud" transition path? Functional Specifications Reporting Functional Specifications User Acceptance Test – Plan Functional Test Scenarios .
What is the difference between the "System Conversion and the "New Implementation of SAP S/4HANA" transition paths? There are different upgrade cycles. SSCUls are used in System Conversion for configuring SAP S/4HANA through the Manage Your Solution app. In the Realize phase, data is converted and NOT migrated for System Conversion. In the Realize phase, custom code is adjusted rather than developed for System Conversion. .
Which collaboration features can SAP Activate Jam users access? Comment on documents Tweet questions Update Key Deliverable wikis Ask questions .
Identify the two landscape transformation specific tasks in the explore phase Setup Landscape Transformation Software Define the Data Migration Architecture Perform Client transfer Run a Landscape Transformation Assessment .
Which of the following building blocks are part of the SAP S/4HANA platform? SAP Fiori UX SAP HANA in-memory database SAP Solution Manager LOB Cloud Solution .
Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments SAP Cloud Appliance Library Blu-ray disks SAP Solution Builder tool SAP App Center .
Which of the following are levels in the structure of an SAP Best Practices Solution Package? Scope Items Building Blocks Configuration Guides Business Process Scenarios .
Identify the two landscape transformation specific tasks in the explore phase. Setup Landscape Transformation Software Define the Data Migration Architecture Perform Client transfer Run a Landscape Transformation Assessment .
Via which media does SAP provide Ready-to-run systems for SAP S/4HANA deployments? SAP Cloud Appliance Library Blu-ray disks SAP Solution Builder tool SAP App Center .
Which of the following are examples of Ready-to-run SAP S/4HANA systems Fully Activated Appliance SAP Best Practices Explorer SAP Mission ControlCenter SAP Model Company .
How can the project manager help to keep momentum in the project and help to keep the customer involved? Increase the number of Q-Gates Add customer resources to the project to reduce the need for formal training Leverage agile cycles to build and test the solution Walk through the solution processes with the stakeholders .
Which of the following is not correct about the REALIZE phase? The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live. Detailed design workshops are held. .
Which accelerators support the Fit-to-standard workshop in the Explore phase Backlog template Business-Driven Configuration Questionnaire Test Strategy Quality Gate Checklist .
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? Value Determination Change Management Plan Production Support Plan Scope Validation Value Audits .
What are the three elements of SAP Activate?. Tools SAP Solution Manager Methodology Content Focused Build .
What are deliverables of the Application: Integration work stream in the prepare phase? Fit/Gap Analysis Data Cleansing Adaptation Specifications Security Checks Network Connectivity Checks .
Which Value Chains does SAP Solution Manager 7.2 deliver? Requirements-to-Deploy Detect-to-Correct Request-to-Fulfill Cash-to-Order Hire-to-Retire .
What are some of the key topics covered in the Customer Team Enablement workstream? Solution Expertise Technical Expertise Project Management Project Sourcing Approach Planning skills .
What are the three pillars of SAP Activate? SAP Activate Methodology Guided Configuration SAP Solution Manager SAP S/4HANA in-memory database SAP Best Practices .
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA Cloud, Single Tenant Edit on? SAP Code Inspector A developer key Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud, Single Tenant Edition The Side-by-Side Extensibility Option (such as SAP Cloud Platform) The 5 Golden Rules .
Which of the following are components of SAP Model Company? Preconfigured Solution Quality Gate Checklist Accelerators Business Process Content for SAP Solution Manager Business-Driven Configuration Questionnaire .
What are the benefits of the SAP best practices? "Fixed organizational structure" Fast time to value Predictable results Simple on-boarding to cloud Reduced functional scope .
Which of the following scenarios are enabled for the "Selective Data Transition" transition path with the SAP Landscape Transformation tool? Security Migration Extraction of Business Units Consolidation through online data replication System Consolidation System Upgrade .
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? Solution Scope and Value Determination Design for the Gaps and Deltas Baseline Build Data Migration Approach Validation Workshops .
What does the Content element of SAP Activate provide? End-User guides Migration Content Business Processes Content Integration Content Functional Specifications for WRICEF development .
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? Creating transactional data Adjusting custom code objects Organizational structure Implementing best practices Changing master data .
Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path? Delta Requirements List - Register Roles and Authorizations Management Concept Organization Structure Specification Detailed Design - Business Process Project Procedure - Mock-up Modeling .
Which artifacts are part of the Solution Adoption work stream? Project Business Case Business Transformation Review (Point of View) System Go live Announcement (order) Detailed Design - Business Process Project Plan .
What is the purpose of the Solution Validation activity in the Explore phase? To educate project participants To challenge changes to standard To identify gaps To verify technical installation "To log additional scope items" .
Which of the following are the pillars of SAP Activate? SAP Launch Methodology SAP Activate Methodology SAP ASAP Methodology Guided Configuration SAP Best Practices .
Which of the following are the key responsibilities of the Scrum Master? Responsible for the project delivery Team support Leadership skill Task initiator Team protection .
Where can you find the Integration Content? SAP Solution Manager SAP API Business Hub SAP Best Practices Explorer Cloud Integration Automation Service SAP Cloud Appliance library .
What are some of the key characteristics of the implementation approach in SAP Activate Methodology? On premise only Based on Ready-to-use Content Delta-based Cloud Ready Fixed scope .
Which of the following SAP S/4HANA Landscape Transformation options are enabled? Migration of Selected Applications System Upgrade System Consolidation Migration of Business Units Security Migration .
Which of the following tools are specific to the Data Management work stream? SAP Landscape Transformation SAP Roadmap Viewer SAP Solution Manager SAP Data Services SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP S/4HANA editions) .
Which key activities does the Guided Configuration support you with? Manage roles of configuration users Train new users Create test data Test configured processes View solution scope .
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? Value Audits Production Support Plan Value Determination Change Management Plan Scope Validation .
Which tools does SAP Activate provide to support Guided Configuratio Solution Builder Expert Configuration Self Service Configuration SAP Solution Compose Model Company .
What are key characteristics of the implementation approach in SAP Activate Methodology? Premium engagement ready On-premise only Fixed scope Validate solution Start with SAP Best Practices .
Which of the following tasks are required in the Prepare Phase? Train the project team Set up the infrastructure to support the project Define the communication plan Approve the test strategy Identify relevant SAP Best Practices .
Which of the following will help you avoid modification of standard functionality in SAP S/4HANA Cloud, Single Tenant Edit on? Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud, Single Tenant Edition The 5 Golden Rules SAP Code Inspector A developer key The Side-by-Side Extensibility Option (such as SAP Cloud Platform) .
Which tools does SAP Activate provide to support Guided Configuration? Solution Builder Expert Configuration Self Service Configuration SAP Solution Composer "Model Company" .
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? Operations impact analysis Custom code adjustment Delta configuration Development system migration Sandbox system migration .