Questions
ayuda
option
My Daypo

ERASED TEST, YOU MAY BE INTERESTED ONManufacturing

COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
Manufacturing

Description:
Manufacturing

Author:
ljh63266
(Other tests from this author)

Creation Date:
01/07/2023

Category:
Sport

Number of questions: 209
Share the Test:
Facebook
Twitter
Whatsapp
Share the Test:
Facebook
Twitter
Whatsapp
Last comments
No comments about this test.
Content:
1. Which of the following business priorities are covered by the end-to-end process forProfessional Services? (3 correct) Accelerated Plan to Product Core Finance Project Services Optimized Order to Cash Inventory Management.
2. Which of the following tasks can you perform using the SAP Smart Business KPIsapp? (3correct) Change the visualization of KPIs. Report aggregated results in a tile on the SAP Fiori launchpad Drill down into KPIs. Run data mining algorithms. Drill down into a data model and modify it.
3. In which phase of the project can a project manager create a billing proposal? In the Execution phase In the Fit to Standard Analysis phase In the Contract Preparation phase In the Planning phase.
4. Which of the following system configurations are protected by Content LifecycleManagement against unwanted changes? (3 correct) Personalization done by the customer New process steps and processes added by customers or partners System languages Currencies Pre-configuration delivered by SAP.
5. What are the main value drivers of SAP S/4HANACloud? (3 correct) High degree of customization Rapid innovation cycles Fast time to value Open to any database Simplification of consumption.
6. Which key elements does SAP Activate consist of? (3 correct) Accelerated SAP (ASAP) Guided Configuration Simplification List Methodology SAP Best Practices.
7. Which of the following sources provide customers with useful information for the Prepare and Discover phases of an SAP S/4HANA Cloud implementation project? (3 correct) SAP S/4HANA Cloud Simplification List SAP S/4HANA Feature Scope Description SAP S/4HANA Cloud Release Information SAP S/4HANA Cloud Use Case Series SAP S/4HANA Cloud Installation Guide.
8. Which of the following best practices are included in the Order and Contract Management end-to-end solution? (3 correct) Intercompany and Sales Order Processing (Domestic and International) Accounts Receivable Accelerated Customer Returns Stock Handling Advanced Available-to-Promise Processing (aATP).
9. What are the main value drivers ofSAP S/4HANA Cloud? (3 correct) High degree of customization Rapid innovation cycles Fast time to value Open to any database Simplification of consumption.
10. What does guided configuration for SAP S/4HANA Cloud provide? Maintenance master data for SAP S/4HANA Finance Cloud Guidelines for the programming of extensions in the cloud Machine learning capabilities for autoconfigurations in SAP S/4HANA Cloud An assisted way to adapt SAP Best Practices for SAP S/4HANA Cloud.
11. Which of the following are activities in an SAP S/4HANA Cloud implementation that require key users' involvement? (3 correct) End-user training and onboarding Cloud subscription fees monitoring Accounts payable clearing System personalization and configuration Solution discovery.
12. Which of the following are milestones of SAPS/4HANA deployment with SAP activate? (2correct) Scope items Assessment Go-Live Trial System Subscription Starter System Deployment Contract.
13. What are some of the challenges that Velotics is facing? (3 correct) Eachof their lines of business is either working off spreadsheets or has its own insular,small-scale LoB application. They must convert from an existing SAP ERP system to SAP S/4HANA Cloud. They must add an accessories product line with products produced in-house as well as procured products to complement their cycles line of business. Their current system does not support e-bikes master data. They do not have an IT department.
14. What does public cloud stand for? (3 correct) Scalability Platform as a Service Fully mobilized Standardization High degree of configuration.
15. Which of the following are characteristics of public APIs used to connect SAP S/4HANA with third-party systems? (3 correct) They can use SAP Cloud Platform Integration. They use OData, REST, or SOAP protocols. They are publicly released on the SAP API Hub. Each public API can be used for only one operation. They can only be used to connect SAP cloud systems to SAP on-premise systems.
16. Which key elements does SAP Activate consist of? (3 correct) Accelerated SAP (ASAP) Guided Configuration Simplification List Methodology SAP Best Practices.
17. What do business users request today? (3 correct) Advanced analytical capabilities Separate front ends for analytics and transactions Real-time insight in their SAP S/4HANA system One report for all business requests Contextual information along their transactions.
18. When does the upgrade of the P and Q systems of your SAP S/4HANA Cloud happen? Quarterly, on the first weekend of the quarter On-demand, within one week of your request Once, four weeks after Release to Customer (RTC) According to the wave cycle that SAP assigned to you.
19. In which of the following System Lifecycle phases is the Q-system used? (3 correct) Change Realize Preset Run Deploy.
20. What lays the foundation for the new value levers for SAP S/4HANA Cloud? (3 correct) New user paradigms Digital core architecture Technology innovations SAP Cloud Platform Adoption in the LoB.
21. Where can you create custom-specific apps for your SAP S/4HANA Cloud? Only in SAP S/4HANA Cloud as in-app extensions In SAP S/4HANA Cloud or on SAP Cloud Platform Only on SAP Cloud Platform as side-by-side extensions Nowhere; custom-specific apps are not allowed in SAP S/4HANA Cloud.
22. Which of the following are project phases in SAP Activate? (3 correct) Run Ideate Discover Prepare Configure.
23. Which end-to-end solutions are mapped to the Project Services business priority? (3correct) Project Management Time and Expense Management Maintenance Management Contract to Cash HR Connectivity.
24. Which technology is used for output management in SAP S/4HANA Cloud? Adobe Document Server and Adobe Forms SAP Document Center HP Document Server SAP Cloud Platform Portal.
25. Which of the following tools are used during the Fit to Standard Analysis process of SAPS/4HANA Cloud deployment? (2 correct) SAP Best Practices Explorer SAP Transformation Navigator SAP Road Map Viewer Product Availability Matrix Code Inspector.
26. Which means increase effectiveness in business practice? (3 correct) Satisfy customers with new models Lower maintenance costs More value per employee Fewer stock-outs Operational excellence.
27. Which of the following statements regarding the starter system for SAP S/4HANA Cloud are true? (3 correct) It is provided by the SAP service center. You can transport your configuration in the starter system to your Q and P systems. It contains master data. It contains your required configuration. It contains model company configuration.
28. At which stage are we in adoption lifecycle of SaaS ERP? Acceptance/Enthusiasm Confidence Euphoria Confusion/Frustration.
29. Which of the following tasks can you perform using the Event-Based Revenue Recognition app? (2 correct) Launch a separate SAP Analytics Cloud report. Analyze individual recognition postings. Adjust the recognized revenue and cost of sales. Enter accruals. Pick values from a list of predicted and weighted results.
30. What do S/4HANA Cloud and S/4HANA on-premise has in common? They run on the same upgrade schedule The adoption of new innovations provided by SAP requires a similar time and efforts They share the same scope They are built from one single code line.
31. What is the right sequence of steps for an SAP S/4HANA Cloud upgrade? Q system upgrade test phase P system upgrade P system upgrade Q system upgrade test phase Test phase Q system upgrade P system upgrade Q system upgrade P system upgrade test phase.
32. Which of the following statements regarding customer-driven integration is true? SAP Cloud Platform Integration cannot be used for customer-driven integration. Customer-driven integration is operated by SAP. Customer-driven integration requires that the integration is scoped and built based onAPIs provided by SAP. Customer-driven integration enables you to achieve maximum speed to value.
33. What are some of the benefits of the Procurement Overview page? (3 correct) Increased efficiency of purchasers Supplier network communication Document management Business process acceleration Instant insight to action.
34. What is the leading principle of guided configuration? It is done by one line of business on behalf of another line of business. It can be done by key users in the lines of business without the support of a central IT department. It is done by line-of-business executives. It is done by IT consultants from the IT department.
35. When using the SAP S/4HANA migration cockpit, where can you find details regarding the structure of the fields in your migration objects, such as type and length? In the downloaded migration template In the system help for the cloud system In the online help for the migration tool In the individual object documentation.
36. Which of the following are characteristics of the analytics solutions for SAP S/4HANACloud? (3 correct) They require an additional deployment of business intelligence front ends. They provide instant insight to action. They provide data warehouse functionality. They provide KPI visualization and modeling apps. They support process execution through contextualized information.
37. Which embedded analytics capabilities are planned for stage 3 of SAP S/4HANA Cloud development? Prediction and machine learning capabilities Overview pages Insight-to-action reports Functions that allow you to extend the data model.
38. What can enterprises that deploy SAP S/4HANA Cloud in their subsidiaries achieve? (2correct) They can reduce the adoption effort since they can update their system on-demand. They do not need to update their SAP S/4HANA Cloud instance; this is done automatically once the headquarters' system is updated. They can increase their cloud footprint across their enterprise. Correct! They can get firsthand experience of using the latest ERP system from SAP.
39. Which means increase effectiveness in business practice? (3 correct) Satisfy customers with new models Lower maintenance costs More value per employee Fewer stock-outs Operational excellence.
40. Which of the following are functions of output management in SAP S/4HANA Cloud? (3correct) Updating multiple master data records at a time Entering a recipient Choosing the output method such as print, fax, or e-mail Assigning workflows Previewing a document.
41. Which of the following applications are embedded in SAP S/4HANA Cloud? (3 correct) SAP Learning Hub Migration app Configuration apps Test app SAP Best Practices Explorer.
42. What is the service-level agreement (SLA) on corrective action for priority 1 incidents? 6 hours, real time 6 hours, office hours 4 hours, office hours 4 hours, real time.
43. What kind of enterprise is the company described in the case study presented in this unit? A bicycle producer located in the United States A global manufacturing enterprise A distribution company located in Germany A consulting company in the manufacturing industry.
44. How can you model company-specific data access on top of public CDS views in SAPS/4HANA Cloud? By using the Query Browser app By modeling inside the ABAP for Eclipse environment By using the Custom CDS View app (view modeler) By using the CDS View Browser app.
45. How can you make your custom field searchable in free-text search? Use the search setting in SAP Fiori launchpad. Check the Search Relevance checkbox in the UIs and Reports section of the CustomFields and Logic app. Use the search setting in the Custom CDS Views app. Use the UI Adaptation Mode app.
46. What is the purpose of the Discover phase? To test the solution To support the Go-Live of the solution To help customers understand the breadth, depth, and functionality of SAP S/4HANACloud, and the benefits it can bring to their business To help customers understand the configuration options in detail.
47. What are the three value levers of the agility dimension? (3 correct) Assimilate process innovation Accelerate execution Increase organizational agility Increase process flexibility Increase organizational speed.
48. Which of the following are the priority areas for using the test automation tool for SAPS/4HANA Cloud? (2 correct) Regression test Scope and configure End-user acceptance test Fit-to-standard analysis Implementation support for new and changed processes.
49. What is the easiest way to familiarize yourself with SAP S/4HANA embedded analytics? Install an on-premise SAP S/4HANA system. Use the SAP S/4HANA Cloud trial online. Use an existing SAP BW/4HANA system. Download all analytics solutions delivered by SAP.
50. What did SAP develop to provide customers with implementation experience (guided implementation accelerated by tools, templates, and predefined content, clear guidance through each implementation phase, and an agile project management approach) for SAPS/4HANA Cloud? SAP Leonardo SAP BusinessObjects Project Systems Rapid Mart SAP Activate Accelerated SAP (ASAP).
51. Which of the following tools are used during the Realize phase of an SAP S/4HANA Cloud deployment? (3 correct) Test Tool Implementation Guide (IMG) Product Availability Matrix Migration Cockpit Manage Your Solution Application.
52. Which of the following processes uses predictive analytics in SAP S/4HANA Cloud? Direct Materials Procurement Supplier Activities Invoice Matching Contract Consumption.
53. During the Change phase, when can a change project be created in the quality system? Only after testing Only when the data is archived Only when the starter system has been deleted Only after the previous change has been imported to the productive system.
54. What do SAP Best Practices for analytics with SAP S/4HANA provide? (3 correct) A step-by-step implementation guide Guidance on how to integrate with SAP Cloud Platform Guidance on how to integrate with SAP Analytics Cloud A manual on how to use SAP S/4HANA Cloud as a data warehouse A set of business intelligence UX components.
55. Which of the following finance capabilities are on the roadmap for the 1708 release of SAPS/4HANA Cloud? (2 correct) Bank Fee Analysis Treasury and Risk Management Cost Center PlanAllocation Leveraging SAP Cloud Platform for finance Financial Shared Services.
56. Which of the following are characteristics of the SAP S/4HANA Cloud extensibility concept? (2 correct) The extensibility concept for SAP S/4HANA Cloud ensures cloud-ready lifecycle processes. SAP S/4HANA Cloud extensions are loosely coupled. SAP S/4HANA Cloud offers reduced extensibility capabilities, allowing only simple extension SAP S/4HANA extensions are designed only for SAP consultants.
57. What can companies achieve by using demand-driven manufacturing in SAP S/4HANACloud? (3 correct) They can evaluate forecasts correctly. They can permanently optimize the process flow. They can produce only for real demand. They can work event-driven and empower teams to make local decisions. They can plan for variations along the supply chain.
58. Which of the following systems are part of a two-system SAP S/4HANA Cloud landscape?(2 correct) Quality system (Q) Test system (T) Development system (D) Production system (P).
59. What are the three value levers of the increase efficiency dimension? (3 correct) Digital out-tasking Upskill employees Automate process steps Accelerate execution De-layer processes.
60. Which of the following configurations are performed during the Preset phase? (3 correct) Define the transaction types. Define the currencies. Define the organizational structure. Define the chart of accounts. Define the payment block reasons.
61. How are the relevant migration objects for your implementation of SAP S/4HANA Cloud determined? Manually, by selecting them in the SAP S/4HANA migration cockpit By your account manager based on your request Automatically by the SAP S/4HANA migration cockpit, depending on the activated scope items Based on the licensing agreement.
62. How can you change the default testing values for a process step when using the test automation tool for SAP S/4HANA Cloud? By using a self-service customizing (SSC) UI By importing the values from another test plan By adding a variant By creating a new test plan.
63. How many upgrades of your SAP S/4HANA Cloud system are you allowed to skip? Two Three None One.
64. Which types of integration are provided with SAP S/4HANA Cloud? (3 correct) Template-based integrations Integration of lines of business and IT teams SAP solutions with SAP-delivered productized integrations Customer-driven integrations with APIs provided by SAP Mergers and acquisitions integration.
65. Which of the following statements regarding SAP S/4HANA Cloud APIs is true? SAP S/4HANA Cloud APIs can be used to connect only SAP systems. Customers cannot use SAP S/4HANA Cloud APIs to integrate SAP systems with their own systems. SAP S/4HANA Cloud APIs can be used to connect only third-party cloud systems. SAP S/4HANA Cloud APIs use SAP Cloud Platform Integration and/or SAP HANA cloud.
66. In-app extensibility applications can be used to add custom fields, use custom forms, or use CDS views for analytics. For whom are these in-app extensibility applications designed? For SAP Your Answer For IT experts For key users(business experts) For consultants.
67. Which of the following are acceleratorson scope item level that SAP provides with SAP Best Practices Explorer for your SAP S/4HANA Cloud solution? (3 correct) Process diagrams Prerequisites matrix Scope-item fact sheets Roadmap presentation Test scripts.
68. What is the aim of the Prepare phase? To migrate, integrate, extend, and test your solution To onboard your users to SAP S/4HANA Cloud To configure your SAP S/4HANA Cloud starter system To perform the initial planning and preparation for your deployment project.
69. Which of the following tasks can you perform on an Analytical List page? Dig into KPIs, Overview pages, and transactions. Modify the data models. Define KPIs. Create and manage analytical queries.
70. What are some of the benefits of using Machine Learning procedures in SAP CashApplication? (3 correct) Improved overall service quality for Shared Service Centers Reduced time and effort spent by accountants matching open receivables to incoming payments Processing of large volumes of incoming payments Automatic currency conversion based on actual data Automatic management of petty cash payments.
71. Which of the following are some of the key capabilities of SAP S/4HANA Cloud? (3correct) Distributed storage management Workflow Master data management Output management Web server management.
72. Which of the following roles are required in the end-to-end process for ProfessionalServices? (3 correct) Sales Accountant Resource Manager Billing Clerk Warehouse Clerk Talent Manager.
73. What are the 4 pillars of SAP Preferred Care for SAP S/4HANA cloud? T transformation road-map, On-Site support, project based offerings, and value assurance. Co-innovations, Business Operation Continuity, System Measurement and Expert chat Digital Transformation Support, Co-Development, Software Updates and Upgrades ,and Knowledge Transfer Mission Critical Support, Collaboration Empowerment, and Innovation & ValueRealization.
74. Which of the following phases are phases in both System Lifecycle and SAP Activate? (3correct) Realize Explore Preset Deploy Change.
75. Which of the following tools are used during the Realize phase of an SAP S/4HANA Cloud deployment? (3 correct) TestTool Implementation Guide (IMG) Product Availability Matrix Migration Cockpit Manage Your Solution Application.
76. Which of the following features are new in the Accelerated Customer Returns process inSAP S/4HANA Cloud compared to traditional EPR systems? (3 correct) Triggering of each sub-process through separate transactions Automatic booking of materials Flexible compensation for returned materials Automatic generation of the return delivery document from the return sales order Extended Warehouse Management.
77. Which of the following scenarios that cover end-to-end process between headquarters and subsidiaries in a SAP S/4HANA Cloud two-tier landscape were highlighted in this unit? (3correct) Core Finance Recruiting Manufacturing Procure to Pay.
78. What does public cloudstand for? (3 correct) Scalability Platform as a Service Fully mobilized Standardization High degree of configuration.
79. What is the right sequence for an SAP S/4HANA Cloud upgrade? Q system upgrade > test phase > P system upgrade P system upgrade > Q system upgrade > test phase Test phase > Q system upgrade > P system upgrade Q system upgrade > P system upgrade > test phase.
80. What are some of the business benefits of demand-driven manufacturing in SAP S/4HANACloud? (3 correct) Adapting via feedback based on real data analytics Achieving an improved and smooth material flow with fewer exceptions Gaining responsiveness to react on real customer demand Maintaining a strong buffer level at each tier to cover safety stock Enabling you to make the right assumptions.
81. Which of the following business challenges does the Procurement Overview page address?(3 correct) Complex collaboration (internally and with vendors) Complex and time-consuming processes with high volume of purchasing documents Poor end-user adoption Repetitive errors in invoice matching Inconsistencies after clearing of open items.
82. What are some of the benefits of using master data remediation functions in SAPS/4HANA Cloud? (2 correct) You can change data "en masse" to adapt erroneousmaster data and ease the correction process. You can easily analyze payment advices and goods movements. You can ensure that product master data complies with the rules for data correctness and completeness. You can use the provided data mining capabilities.
83. What are the goals of the Realize phase? (3 correct) To adapt the company-specific business processes To test the adapted configuration To perform dry runs of data migration To conduct a fit-to-standard analysis To discover the solution.
84. When should you start with the enablement of the key users of SAP S/4HANA Cloud? Subcontracting Procurement of materials In the Prepare phase In the Deploy phase.
85. Which of the following are functions in the standard Order to Cash process? (3 correct) Subcontracting Procurement of materials Availability of the articles purchased Calculation of pricing and taxes Scheduling the delivery of goods.
86. How are Order to Cash processes realized? Based on SAP Best Practices By importing the existing processes from traditional SAP ERP systems By refactoring the code used in Procurement and Invoice Collaboration processes Based on add-ons provided by customers from the retail industry.
87. What is the main activity of the Explore phase? Scope and configure Discovery access Fit-to-standard analysis Realize.
88. Which of the following process steps is included in theMake to Stock process? Create sales order Check or preview purchase order Create return delivery Create production order.
89. What are the main tools that you are recommended to use during the Explore phase of anSAP S/4HANA Cloud Implementation project? (2 correct) SAP Solution Builder ABAP Workbench SAP S/4HANA Cloud starter system SAP Best Practices Explorer.
90. Which of the following are possible steps towards making SAP S/4HANA Cloud become a two-tier ERP deployment? (3 correct) Ensure that reporting provides visibility in subsidiaries. Implement all subsidiary-specific processes in your headquarter' ERP system. Differentiate with integrated processes that you need to run between headquarters and subsidiaries Integrate on the financial side by performing consolidation and corporate planning Upgrade your headquarters' ERP system.
91 .Our Machine Learning use case is an example of which value lever dimension? Increase agility Assimilate process innovation Increase efficiency Increase effectiveness.
92. Which of the following apps do you use to define a new field (in-app extensibility) for screens, forms, or APIs? Custom CDS Views Custom Fields and Logic UI Adaptation Mode Custom Business Objects.
93. What is the role of the workflow engine in SAP S/4HANA Cloud? To import workflows generated with third-party workflow toolsets To generate alternative, simple workflows from complex, error-prone workflows To run, control, and monitor all workflow-related activities in the system To transform flow charts and graphics into executable workflows.
94. Why do SAP-delivered integrations enable customers to achieve maximum speed to value?(3 correct) Because SAP Cloud to SAP Cloud integrations are pre-delivered with best practices content delivered by SAP Because they are operated by customers Because they are predefined and developed by SAP Because new developments and upgrades are performed by the customers Because they are operated by SAP.
95. What is a Learning Journey? A how-to guide for process tutorials in the My Learning app A guided tour embedded in SAP S/4HANA Cloud A document that describes your experience during the onboarding process to SAPS/4HANA Cloud A role-based collection of learning assets for a specific topic.
96. After you have reviewed the best practice process flow and you have demonstrated the business scenarios and concepts, what should you do next in a Fit to Standard workshop? Provide process flows, test scripts, and users. Enable the customer to execute the scenarios on their own. Discuss how the processes fit with customer requirements. Identify the required configuration.
97. Which of the following end-to-end solutions are part of the Core Finance business priority of SAP S/4HANA Cloud? (3 correct) Project Services Inventory Management Accounting and Closing Operations Cost Management and Profitability Analysis Treasury and Financial Risk Management.
98. Why does SAP deliver country-specific versions of SAP S/4HANA Cloud? (3 correct) To empower the business to run complaint lo cally and compete globally To facilitate deployment in local data centers To offer internationalization capabilities, such as Unicode compliance, currency support, time-zone adjustments, text processing using user locals, and more To offer the software in local languages To fulfill the export goals of the company.
99. Which of the following business priorities of SAP S/4HANA Cloud was presented in this unit 'Digital Order and Contract Management'? Accelerated Plan to Product Core Finance Optimized Order to Cash Streamlined Procure to Pay.
100. In which of the following steps can you create a value mapping in SAP S/4HANA migration cockpit? Convert Values Simulate Import Execute Import Validate Data.
101. Which of the following applications are embedded in SAP S/4HANA Cloud? (3 correct) SAP Learning Hub Migration app Configuration apps Test app SAP Best Practices Explorer.
102. How can you get an overview of the entire Core Data Services (CDS) views in SAPS/4HANA embedded analytics? Use the View Browser app. Use the Query Browser app. Use the ABAP Dictionary and search for the term "query". Use the Multidimensional Reporting client.
103. From where can you download the SAP S/4HANA Cloud migration templates? From the SAP S/4HANA migration cockpit From SAP Help Portal From SAP Cloud Platform From SAP Service Marketplace.
104. When should you start with the enablement of the end users of SAP S/4HANA Cloud? In the Explore phase In the Discover phase In the Prepare phase In the Deploy phase.
105. Which of the following business priorities in SAP S/4HANA Cloud focuses on production capabilities? Optimized Order to Cash Project Service HR Connectivity Accelerated Plan to Product.
106. Which of the following statements regarding the positioning of SAP S/4HANA Cloud andSAP Ariba are true? (3 correct) SAP S/4HANA Cloud covers operational procurement processes. SAP Ariba provides operational procurement with tight integration to other businessprocesses such as material requirements planning (MRP). SAP Ariba provides network communication and strategic procurement. SAP offers prebuilt integration for SAP Ariba and SAP S/4HANA Cloud. SAP Ariba is required on top of SAP S/4HANA Cloud to do operational procurement.
107. To which of the following systems does SAP provide pre-delivered integration with SAPS/4HANA? (3 correct) SAP Concur SAP SuccessFactors SAP Ariba SAP Human Capital Management Third-party system sfor managing travel and expenses.
108. What does "two-tier ERP system landscape of an SAP S/4HANA Cloud deployment" mean? Subsidiaries are managed by the headquarters' ERP system. A backup ERP system is installed at the headquarters. Subsidiaries run their own ERP system Backup and archiving solutions are installed at each subsidiary.
109. Why is it easy to create new workflows in SAP S/4HANA Cloud? (3 correct) Because you can use the intuitive SAP Fiori 2.0 design Because there is no technical know-how needed to set up a new workflow Because you can create alternative, simple workflows instead of large, error-prone workflows Because you can use the intuitive ARIS Toolset Because loops, branches, and thresholds for workflow steps are determined automatically without user interaction.
110. Which of the following are capabilities of master data management in SAP S/4HANACloud? (3 correct) Mass processing Master data consolidation Master data prediction Master data remediation Master data modeling.
111. Which of the following are possible steps towards making SAP S/4HANA Cloud become a two-tier ERP deployment? (3 correct) Ensure that reporting provides visibility in subsidiaries. Implement all subsidiary-specific processes in your headquarters' ERP system. Differentiate with integrated processes that you need to run between headquarters and subsidiaries. Integrate on the financial side by performing consolidation and corporate planning. Upgrade your headquarters' ERP system.
112. What are the three value levers of the increase efficiency dimension? (3 correct) Digital out-tasking Upskill employees Automate process steps Accelerate execution De-layer processes.
113. Which of the following tasks can you perform using in-app extensibility applications inSAP S/4HANA Cloud? (3 correct) Define custom CDS views for your analytical requirements. Add custom fields to screens, forms, or APIs. Develop add-ons. Add business logic, for example in a BAdI. Change the format of dates and numbers.
114. Why does a two-tier ERP approach increase the complexity of the supporting IT architecture? Because processes that are specific to one subsidiary must be replicated in all subsidiaries Because headquarters must backup all subsidiaries ERP systems Because master data management and configuration needs must be harmonized across systems Because integration becomes more complex in multi-vendor setup.
115. Is Production Version is also required for phantom items? No Yes.
116. What does provide advanced planning options and is especially suitable for repetitive manufacturing? The extremely flexible product planning table Detailed Scheduling planning board PP/DS Optimizer Release invoice for payment.
117. What is the PP planning procedure in the product master describes? Healthy security posture Proper configuration of controls Hardening and reporting That how a product is to be planned.
118. What is a monitoring Tool that provides the planner pointed information and access to problem situations in production planning in ePP/DS? Alert Monitor Natural Disasters IP Infringement Espionage.
119. PP/DS for SAP S/4HANA supports various Manufacturing Models. What are they? (4Correct) Engineer to Order Project Manufacturing Flow Manufacturing Make to Order with Order BOM Disruption of software deployment.
120. What is a solution that enables a collaborative problem–solving process together with suppliers? SAP Supplier Problem–Solving path to file name to read from maximum response waiting time only when you call an action.
121. In ePP/DS the Material Requirements Planning and Detailed Scheduling is performed by: Advanced Planning Heuristics Keypad PIN Hardware token.
122. Which user ID must be locked for security reasons after you create an administrator business user? SAP Customer Initial User (SAP_CUST_INI) SAP Customer Business User (SAP_CUST_BUS) AP E-Mail Inbound Processing (SAP_SMTP_IN) SAP Lifecycle Management Administrator (SAP_LMADM).
123. Which of the following option will not be supported in PP/DS for SAP S/4HANA? In Production Planning and Detailed Scheduling. Production Planning orders APO-PP/DS Standard PP planning procedures 3 the BADI implementation CUSLNTRTO_ADDIN.
124. What are the material requirements which can be executed in SAP S/4HANA Digital CoreERP-PP or embedded PP/DS? Protecting accounts with passwords. Disabling unnecessary accounts. planning (MRP) and capacity planning (CRP). Protecting management interfaces and applications. CVSS version 3 also includes the requirements of privileges in its base metrics.
125. Planned order in ERP on SAP S/4HANA contain the all dependent requirements for: Monitoring large data transfer transactions in the firewall logs both Advanced Planning and non-Advanced Planning components. Implementing a group policy to block user access to system files describes an approach, philosophy, or strategy regarding security.
126. What does determine expected material shortages and creates planned orders, purchase requisitions, or delivery schedule lines to cover the expected material shortages? MRP run Heuristic penetration test Metasploit.
127. Based on the generated orders in Detailed Scheduling (DS) the orders and operations are___________. Fixed Dynamic CVSS All of the above.
128. The selection guide offers the following new planning strategies. what are they? (3 Correct) Strategies for Make-to-Stock Production Strategies for Make-to-Order Production Strategies for Planning Components Planning strategies.
129. Which one of the following option reads material receipts and requirements, calculates shortages, and creates planned orders and purchase requisitions all in one database procedure? Degaussing Steganography MRP Live Netcat.
130. Who does provide a range of predefined alert types? MRP Live (MD01N) Alert Monitor Spark Streaming Solid Arrows.
131. What represent the business procedures for the planning of production and procurement quantities? Strategies for Make-to-Stock Production Strategies for Make-to-Order Production Strategies for Planning Components Planning strategies.
132. Which of the following option can make sure BOM and routing fit together? SAP S/4HANA Digital Core. Advanced Planning Production versions Language detection.
133. Which actions can you complete with the planning table tool in repetitive manufacturing?(2 Correct) Assign unassigned production quantities to the production lines. Perform component backflush on the planned orders. Perform planning tasks using production or process orders. Analyze the product cost collector for cost calculation.
134. The interactive planning in ePP/DS can be carried out from: Provides strong encryption at-rest and in-flight with best-in-class standards such asSSL and keys stored in AWS Key Management System (KMS). Integrated Identity Management: Facilitates seamless integration with enterprise identity providers via SAML 2.0 and Active Directory. This is the holy grail of what an RDD is. RDDs are a 'immutable resilient distributed collection of records' which can be stored in the volatile memory the product view, product planning table, and the detailed scheduling planning board or by the new MRP Apps like “Monitor Material Coverage” & “Manage MaterialCoverage” in the FIORI Launchpad.
135. Who are interested in PP/DS or responsible for the implementation of production planning with SAP S/4HANA? (2 Correct) project team members key user GeneralRegressionModel Multiple Spark Contexts.
136. How to schedule an operation from one alternative resource to another by drag & drop on the Detailed Scheduling Planning Board, in automatic rescheduling or optimization in case of overload? what is the value of the information that could be discovered through the system compromise? what is the specific threat that your system is facing? what mitigation strategies could be deployed to address the issues that are found? you have to add an alternative sequence to a routing with an alternative work center.
137. What can be executed as interactive single-Item for a product or as total planning for a group of products that may be freely defined (e.g. all products from a plant)? Advanced Planning Heuristics Keypad PIN Hardware token.
138. In ePP/DS in PP, What are the orders generated according to the required stock-/requirement situation and lot-sizing procedure (infinite order scheduling)? In Production Planning and Detailed Scheduling. Production Planning orders Advanced Planning Product Master the BADI implementation CUSLNTRTO_ADDIN.
139. The way in which independent requirements behave in material requirements planning can be determined by: Navigate to the Process Defects app from the defect details popover You can start a standalone master server by executing. Integrated Business Planning (IBP). their requirement type or by the requirements strategy.
140. How can you use the Alert Monitor to monitor production planning in PP/DS? we must define an alert profile for the application. transformations return pointers to new RDDs. where the argument to the for each method is an expression for an anonymous function. allows you to write quick throw away functions without naming them.
141. What can be used as exclusive requirements sources (make-to-order production), or, together with planned independent requirements, they can create the total requirement? QL injection Threat modeling Repudiation Sales orders.
142. In the SAP Ariba Payment and Discount Management process, what step comes immediately after the Suggest a Discount for Early Processing step? Update payment proposal. Start payment run. Release invoice for payment. Evaluate payment suggestion.
143. The planning in embedded PP/DS is always based on own master data (products, resources and PDSs) that must be integrated from: SAP S/4HANA Digital Core. Advanced Planning Production versions Language detection.
144. In SAP S/4HANA Demand Planning to generate forecasts as a future demand program is executed in ___________________. Navigate to the Process Defects app from the defect details popover You can start a standalone master server by executing. Integrated Business Planning (IBP). their requirement type or by the requirements strategy.
145. How can you specify a heuristic for product planning in PP/DS for SAP S/4HANA, if the product is not to be planned using the standard heuristic defined in Customizing? Navigate to the Process Defects app from the defect details popover You can start a standalone master server by executing. On the Advanced Planning tab page in the SAP S/4HANA Material master their requirement type or by the requirements strategy.
146. Who have to make sure material is available when needed? Advanced Planning Production versions Language detection Production planners.
147.Some PP/DS planning attributes can be maintained in the _____________ tab of the material master. SAP S/4HANA Digital Core. Advanced Planning Production versions Language detection.
148. What is the purpose of the Alert Monitor? to inform the planner of exception. Segment the network with firewalls to generate feasible production plans and increase the efficiency of production. to create a feasible production program.
149. How can be MRP procedure distinguished? it is distinguished between material requirement planning and consumption-based planning. you gather information about the target through reconnaissance you're going to enumerate the target to identify known vulnerabilities. exploit the network to gain user or privilege access. E. document all of your results of the pentest and give that report to the organization.
150. What does organize the material flow through all BOM levels, from the procurement of components and raw materials to delivery of a sales order? Accelerate ETL Heuristic Pegging Text Extracting.
151. In the standard version of Advanced Planning in SAPS/4HANA (e//PDS), where is a range of heuristics available for various tasks? In Production Planning and Detailed Scheduling. Production Planning orders Advanced Planning Product Master the BADI implementation CUSLNTRTO_ADDIN.
152. What does the calculation of the Accuracy in the Maintain PIRs app considers? applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately. the withdrawal quantity making the forecast accuracy of the planned independent requirements (PIRs) even more precise. where the argument to the for each method is an expression for an anonymous function. allows you to write quick throw away functions without naming them.
153. How can you change the planning situation? to fix a pegging relationship. the operations of the Standard sequence scheduled to the Basic dates. detailed scheduling planning board By changing resources (capacity, work times, and so on) or changing orders(quantities, data).
154. Based on pegging relationships, the system can: (3 Correct) Identify planning problems on various production levels and display them using alerts Automatically forward scheduling specifications for an order to the dependent orders in the pegging structure, in Detailed Scheduling Optimize delays and storage costs in PP/DS optimization Select the applicable data migration objects from the complete list of objects.
155. The operations in ERP Planned Orders are: to fix a pegging relationship. the operations of the Standard sequence scheduled to the Basic dates. detailed scheduling planning board By changing resources (capacity, work times, and so on) or changing orders(quantities, data).
156. What are some key steps in the SAP Best Practices scenario Nonconformance Management (2QN)? (2 Correct) Complete defect processing Define preventive actions Execute root cause analysis Process defect.
157. What capabilities are available in SAP Central Business Configuration? (2 Correct) Provision the quality and production system Deploy the solution scope Maintain Business Users Migrate data.
158. What must be defined in SAP Central Business Configuration prior to creating the organizational structure? (2 Correct) Fiscal year variant Group currency Chart of accounts Leading ledger.
159. What are the orders created for in-house production. These orders are converted into manufacturing orders at a later process? MRP Live (MD01N) Planned orders Spark Streaming Solid Arrows.
160. Where do you activate SAP Best Practice processes in your quality system? SAP Best Practices Explorer SAP Solution Builder SAP S/4HANA Cloud Manage Your Solution app SAP Central Business Configuration.
161. What will be replaced by Integrated Business Planning IBP (Functionality available in SAPS/4HANA delivery but not considered as future technology)? Internal Service User Integrated Business Planning (IBP) J2EE User SAP S/4HANA Sales & Operations Planning (SOP).
162. Which of the following capabilities can you use in the SAP Fiori app Manage UsageDecisions? (2 Correct) View contextual information related to material. Edit comments of an inspection lot. Record inspection results. Change the inspection lot ID.
163. What will you determined using planned independent requirements from a demand forecast, sales orders or stock transfer requirements? SAP EWA provides the most comprehensive security check The demand program, which has to be covered by the production planning in the plant/ MRP_Area Configuration validation can check if security policies were applied Configuration validation helps to standardize and harmonize security relatedconfiguration items for ABAP systems only.
164. With the new Record Inspection Results app, a Quality Technician can now: (3 Correct) View the number of defects on the worklist page Display defect number, defect code group, defect category, defect description, and date of creation of defect on the defect details popover Navigate to the Process Defects app from the defect details popover You can start a standalone master server by executing.
165. What is the central tool for interactive capacity planning? The extremely flexible product planning table Detailed Scheduling planning board PP/DS Optimizer Release invoice for payment.
166. Which of the following option makes a statement about the compactness of the orders within the optimization horizon? Accelerate ETL Google AI platform Import external models used Production span.
167. In which of the following applications optimization is integrated? (3 Correct) Detailed Scheduling Planning Board Product Planning Table Production Planning Run Asset Identification.
168. Item grouping in multilevel BOM allows BOM engineers to group BOM items together so as to structure the BOM in an organized fashion without creation of subassembly material.This enables BOM engineers to: (3 Correct) Databricks Enterprise Security Framework Represent the modular structure of the product in a multilevel BOM Group component variants in variant BOMs Group a BOM without creating additional materials.
169. Which option covers a wide range of production planning functions and therefore cannot be described comprehensively? The extremely flexible product planning table Detailed Scheduling planning board PP/DS Optimizer Release invoice for payment.
170. What are the following activities you can do as a Production Engineer in the DiscreteManufacturing Industry? (3 Correct) can navigate to all the relevant apps to display work centers, create work centers, change work centers, replace existing values in work centers and check usage of work centers navigate to mass maintenance of work center capacities for creating or updating of intervals and shifts and to edit the capacities. applying this to your strategies will enable them to detect changes in customer behavior as they occur and act on them immediately.
171. The overall planning process starts with which of the following requirements? Databricks Regression Independent Generic Algorithm.
172. Which of the following option is integrated into the SAP S/4HANA Material Master withCDS Redirects on material master? In Production Planning and Detailed Scheduling. Production Planning orders Advanced Planning Product Master the BADI implementation CUSLNTRTO_ADDIN.
173. What are the two different types of pegging relationships? (2 Correct) Fixed Dynamic CVSS All of the above.
174. What was enhanced to provide additional selection criteria for the automatic processing of change requests for which no response has been received from suppliers? Spark's unified platform sharing information from memory The app Schedule Processing of MRP Change Requests To launch a Spark standalone cluster.
175. The consumption-based procedures of forecast- based and time-phased planning are supported in ePP/DS. True False.
176. What does fixed pegging enables? to fix a pegging relationship. the operations of the Standard sequence scheduled to the Basic dates. detailed scheduling planning board By changing resources (capacity, work times, and so on) or changing orders(quantities, data).
177. According to the SAP Activate methodology, in what phase is the Fit-to-Standard workshop executed? Prepare Realize Deploy Explore.
178. Which solution supports you in identifying root causes of problems, taking actions to prevent such problems in the future, and documenting the problem–solving process? SAP Supplier Problem–Solving path to file name to read from maximum response waiting time only when you call an action.
179. What does offer a great bandwidth of planning functionality with can be used in background jobs as well as interactive planning? Advanced Planning Heuristics Keypad PIN Hardware token.
180. What is the objective of a production planning run? to determine each item's relative value. Segment the network with firewalls Install a NIDS device at the boundary to create a feasible production program.
181. Which of the following activity is performed as a Quality Engineer? choose single inspection units (serial numbers) of an inspection lot on the usage decision details page and selectively post them to different stocks, such as, unrestricted use, scrap, sample, blocked, new material, or reserves. Instant access to reliable infrastructure and tools to explore data, prototype advanced analytics algorithms, and curate visual reports without building anything themselves or wait for someone else to do it for them. Because it can do many types of workloads, you don't mean various tools for managing each. access to historical data which exhibits known customer behavior and knowing what problem we are trying to solve.
182. What is an algorithm, which can be perform a planning function for selected objects? Accelerate ETL Heuristic Text Categorization Text Extracting.
183. What is use to define a custom developed solution for alternative resources / modes in thePDS or implement the SAP Consulting Solution? In Production Planning and Detailed Scheduling. Production Planning orders Advanced Planning Product Master the BADI implementation CUSLNTRTO_ADDIN.
184. What is used to assign suitable existing product receipts and product stocks, which can cover the requirement, to a product requirement? Phishing Pegging Gray box test 3rd Party Vendor breaches.
185. The Material requirements planning in PP/DS is usually evaluated from where? Data sensitive labeling Product view Asset Identification Threat Evaluation.
186. What is a current overview of the stock, receipts, and requirements for a product in a specific location for a specific planning version? Data sensitive labeling Product view Asset Identification Threat Evaluation.
187. Which of the following business roles are relevant for SAP Best Practices scenarioProduction Subcontracting – External Processing (BJK)? (2 Correct) Warehouse Clerk Production Supervisor Production Controller Production Controller.
188. Which business objects were initially released as part of the SAP One Domain Model? (2 Correct) Bank Workforce person Cost center Material.
189. What are some of the benefits that the SAP Best Practices scenario Make-to-OrderProduction - Semi-finished Goods Planning and Assembly (1BM) can provide? (2 Correct) Reduce total lead time Minimize inventory of semifinished goods Create purchase requisitions for raw materials early Optimize lot size of finished goods production order.
190. In SAP S/4HANA, what is the is a new MRP run optimized for SAP HANA? MRP Live (MD01N) Planned orders Spark Streaming Solid Arrows.
191. Which of the following option you can choose at the time of releasing a simulation in theProcess pMRP Simulation app? Decision Table, Scorecards, Decision trees and Predictive models, as well as expressions. To connect to a specific cluster, open the cluster menu by clicking theAttached/Detached menu item and then selecting your desired cluster. This script takes care of: setting up the class path with Spark and its dependencies To have capacity proposals created and exported to the Mass Maintenance of WorkCenter Capacities app for capacity adjustments.
192. In SAP S/4HANA, which type of MRP run has to be scheduled for SAP S/4HANA-ERP andAdvanced Planning Materials? Only single Tcpdump Privacy SMS text.
193. SAP standard heuristics are available in which of the following areas? (2 Correct) Production planning: This heuristic is mainly for lot-sizing procedures with planning focus on the products. Detailed scheduling: These heuristics are for scheduling; their planning focus is on resources and operations. Examples of such heuristics are reduce lead-time and dissolve backlog Understand attackers and their methods; often done by constructing threat scenarios The document is a key logger that stores all keystrokes should the account be compromised.
194. The priority of change request proposals can also be determined based on an: Easy data exploration allows teams to determine what the data lets you do. Interactive dashboards empower teams to create dynamic reports. implementation of the Business Add-In Retrieve Priority for MRP Change Request(PP_MRP_CR_RETRIEVE_PRIORITY) A strategy that contains an Adaptive Model component is executed.
195. What is an all-new implementation for Demand planning? Internal Service User Integrated Business Planning (IBP) J2EE User SAP S/4HANA Sales & Operations Planning (SOP).
196. How can be production dates are determined? Run a vulnerability scan on all the devices in the wireless network Enable MAC filtering on the switches that support the wireless network. Understand attackers and their methods By exploding the production data structure (PDS) and then carrying out lead time scheduling.
197. How to ensure consistency of the availability dates and requirements dates betweenPP/DS and ERP on SAP S/4HANA? All components and items of a planned order should be integrated with ePP/DS for which the requirements dates and availability dates that have been planned using detailed scheduling are required based on the dates of the assigned operations. Can indicate a serious impending situation A bot on the computer is brute forcing passwords against a website The end user purchased and installed a PUP from a web browser.
198. You are designing the migration of data for a new SAP S/4HANA Cloud customer. What must the customer do to prepare? Design the interfaces with the non-SAP legacy system for mass transfer. Design the programs or reports needed to extract the legacy data. Select the applicable data migration objects from the complete list of objects. Change the provided Excel templates to match the customer's requirements.
199. Who are able to specify subitems so that you can specify different installation points, quantity required, and subitem text? Alert Monitor Natural Disasters IP Infringement BOM engineers.
200. For which extensibility approach do you use the SAP Cloud Platform? Key user extensibility Side-by-side extensibility Classic extensibility Managed extensibility.
201. What are the two options maintaining the available capacity for planning in AdvancedPlanning? (2 Correct) Social engineering conversation by a threat actor done in person or by phone, email, text, or instant messaging to obtain sensitive information from the user such as credentials, date of birth, account information, social security numbers, and so on. You can maintain the available capacity in ePP/DS. Only the header data for the workcenter capacity is transferred from SAP S/4HANA Digital Core to PP/DS. Intervals of available capacity that exceed this overall capacity are maintained in ePP/DS The available capacity with intervals and shift pattern is maintained entirely in SAPS/4HANA-ERP as ’external capacity’ for planning in Advance Planning or APO-PPDS.Maintaining Intervals of available capacity that are in PP/DS is not possible. To prevent data inconsistencies when you are also using the Fiori App Monitor Capacity Utilization the Capacity Variants, Shifts and Definitions are disabled in SAP GUI when ExternalCapacity is selected for Resources It seeks to identify issues in a network, application, database, or other IT systems prior to it being inadvertently or purposely used to compromise a system.
202. Most of the resource master data does not need any maintenance in the ePP/DS resource master. True False.
203. What is the purpose of optimization? to determine each item's relative value. Segment the network with firewalls to generate feasible production plans and increase the efficiency of production. to create a feasible production program.
204. What is primarily used in the context of capacity planning and optimization, that is, in the step after material requirements planning? Attack surface Code review Service heuristics Attack tree.
205. In SAP S/4HANA several production versions can be defined in the _____________. Business Analysts Complex Material master Business Issue.
206. What is the most important tool in capacity planning? to fix a pegging relationship. the operations of the Standard sequence scheduled to the Basic dates. detailed scheduling planning board By changing resources (capacity, work times, and so on) or changing orders(quantities, data).
207. What is a planning function that executes planning for selected objects (in this way, the focus of planning can be products, orders, operations, resources, or line networks) using a particular algorithm? MRP run Heuristic penetration test Metasploit.
208. The Optimization allows to optimize the ___________ and the ___________ of existing operations/activities that were previously generated by the production planning run or manual planning. Cross-site scripting Poor system logging Server-side request forgery Production dates/sequences, resource assignment.
209. What does determine a manufacturing process by specifying a routing and a bill of material? Containerization Production version Vulnerability Management Automated Failover.
Report abuse Consent Terms of use