option
Questions
ayuda
daypo
search.php
ERASED TEST, YOU MAY BE INTERESTED ON SAP Academy WM-01
COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP Academy WM-01

Description:
Preguntas WM

Author:
Marcela Murillo
Other tests from this author

Creation Date:
10/05/2014

Category: Others

Number of questions: 10
Share the Test:
New CommentNuevo Comentario
No comments about this test.
Content:
630-303. Staging components for production from the warehouse is mapped as another goods issue in Logistics Execution (LE): If you do not use the WM-PP interface, the goods issue posting for the work order generates a transfer requirement in an interim storage area, the goods issue area. True False.
630-303 If you use the WM-PP interface, which of the following statements are true. (There are 3) The confirmation of the transfer order completes the staging process. The transfer requierement is not created as a result of a goods issue posting or another Inventory Management Posting. The transfer requirement is created using request with special transactions either in a separate step or directly out for the work order. Using the transfer order, the system transfer the requested components to a goods issue area. The goods issue posting for the components used in the production process completes the staging process.
630-303. The advantages of staging a work order using the interface are as follow: (There are 2) You can backflush components, that is, post the goods issue after completion of the production process together with the confirmation of the work order (Material consumed for production You can fine tune how and where you stage materials for production using control cycles. This means that you can stage some components for a specific order, others for multiple orders, and others with no reference at all to an order. You cant request Order-based staging directly from the work order. The system only can adjust the transfer requeriement manually or create it again, if there are changes to the quantities, dates, or times in the plant order.
630-304. In the WM/PP Interface process what are the main features : The source document for the staging process is always a work order. The system determines the Warehouse Management movement type that is assigned to this Inventory Management movement type in Customizing (261 in the standard system) and creates a transfer requirement. The system maps the material quantities that are picked in the next step as negative quants in an interim storage area, wich is the goods issue area.” The required materials are removed from storage and brought to the goods issue area using a transfer order. When the transfer order is confirmed, the quants that have been put away in the goods issue area balance out the negative quants. All the options.
630-305. Which of the following features Not corresponding a stock removal through the WM – PP Interface: The transactions generate a transfer requirement, which is the basis for the transfer order for picking the required components. This staging process is controlled by Inventory Management movement type in the SAP ECC standard system. The picked material quantity is placed in interim storage area 100 (.production supply.), which is assigned to this movement type. The Inventory Management posting reduces not only the storage location stocks, but also the warehouse number stocks. The goods issue posting, which can be either immediate or use backflushing, completes the process.
630-305. In the WM-PP interfase Which of the following statements is true: The putaway of the finished product is the same as an external procurement process, regardless of whether or not you use the WM-PP interface. The goods receipt for a work order is not posted in Inventory Management. The putaway of finished products from production is controlled by Inventory Management movement type 103 (.GR production order.) in SAP ECC.
630-307. To use the interface between Warehouse Management and production control, you must create at least : (There are 2) One production supply area (PSA) One control cycle for staging as master data in Warehouse Management. One storage section for putaway the materials to be consumed.
630-307. Production supply areas group together work centers, created as master data in production control, for the purpose of staging from the warehouse. True False.
630-307. In the WM/PP Interfase the control cycle involves: (There are 5) Material Plant Storage section Producción supply area Storage bin Material staging indicator Batch.
630-307. The following material staging indicators are available in SAP ECC Indicator 1 (pick part) Indicator 2 (crate part) Indicator 3 (release order part) Indicator 4 (manual staging) All the options.
Report abuse