option
Questions
ayuda
daypo
search.php
ERASED TEST, YOU MAY BE INTERESTED ON SAP PP Test-01
COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP PP Test-01

Description:
SAP PP Test-01

Author:
J Kuravi
Other tests from this author

Creation Date:
09/04/2013

Category: Others

Number of questions: 50
Share the Test:
New CommentNuevo Comentario
GAURAV123 ( uploaded 10 years )
Report comment
nice test...learned a lot
bhasker28 ( uploaded 10 years )
Report comment
Please update some more test question papers for SAP PP
ORDEPHA ( uploaded 10 years )
Report comment
I believe that answer of question "At the time of BOM status change, you can define an explosion date for BOM, by entering an explosion number" is wrong - it should be be "NO".
Content:
Material Master settings can override settings in the MRP group. YES NO.
The principle of LTP is to simulate different versions of the demand program. YES NO.
Standard SOP is the only functionality provided to support the MRP process. YES NO.
How demand can be entered into SOP tool? Statistical forecast Manually entered Copy from COPA Copy from Sales info System.
Parallel Processing must be active to use scope of planning. YES NO.
If a distribution is used the material must be distributed equally among the individual time periods. YES NO.
At the time of BOM status change, you can define an explosion date for BOM, by entering an explosion number. YES NO.
Identify the Correct statements: PIRs can be transferred to the operative plan using the current stock level is optional Dep. reqts for Kanban and bulk materials can be created in the planning scenario The Planning Time Fence can be deactivated for the LTP.
In dependent/parallel discontinuation all materials are replaced when their inventory levels are zero YES NO.
Choose the Correct statement (s) A strategy group will contain one main planning strategy The main planning strategy will indicate the .default. Requirement type when entering independent requirements Strategy groups are only necessary for the materials for which independent demand will be placed.
MRP group settings, which in turn can override settings in the plant parameters YES NO.
What supplies will MRP create to offset shortages? None of the Below Planned Orders Production Orders Sales Orders.
Unrestricted use stock is the only stock considered in the planning run YES NO.
A material can be inventoried by In House Production and Procured Externally YES NO.
What criteria planning might use to determine a BOM for a material produced in-house? LotSize Explosion Date Alternative BOM Production Version.
Quota arrangements may be used to split procurement between what types of sources? External vendors Other Plants In house Manufacturing.
The MRP is always based on external procurement YES NO.
The planning time fence is only a function of MPS? YES NO.
There is only Single version of planned independent requirements. YES NO.
For material planning purposes, what controls the relationship between plants? Plant Master GR Processing Time Schedule Margin Key.
Dynamic safety stock shows up as an MRP elements throughout the horizon? YES NO.
Where would be defined procurement element (delay in days) for rescheduling? Schedule Margin Key Safety time Tolerance value Min Queue time Vendor delay factor Withdrawal period.
Item is marked as an MPS item; you cannot plan down to its required raw material. YES NO.
For selecting an alternate BOM, define the procedure to selecting the BOM in the Selection method field of the MRP data. YES NO.
Operative data that is used in the LTP (ex. sales orders, Production orders, firm purchase requisitions and firm planned orders) can be changed in the simulative planning area. YES NO.
ATP check is not limited to sales requirements. YES NO.
Distribution key is entered on what masters? Material Master Production Version BOM Header Routing Work center.
If one plant produces a component that the other plant needs for their manufacturing process, how could this be modeled in SAP ERP? Stock transfers between the plants Trucks and forklifts Withdrawal from another plant Set the procurement type to E.
If demand fluctuates, but production is always used to full capacity, what planning strategy makes most sense? Strategy 10 - Make to stock Strategy 20 - Make to Order.
MRP group settings, which in turn can override settings in the plant parameters. YES NO.
Sales orders are dependent demand. YES NO.
Inventory in the quality inspection is available for planning. YES NO.
When a quality check is performed, the results are recorded for a specific Inspection Lot. YES NO.
Explosion dates of BOM and routing are identical. YES NO.
Quotas always determine a source using the cumulative quantities. YES NO.
What are the types of discontinuation? Aggregate Parallel Simple Disaggregate.
How can the number of rescheduling exception messages be reduced or limited? Net Change planning Tolerance Values Planning time fence Reduce all lead times to 1.
Through Distribution Key Non discrete input and output can be controlled. YES NO.
In basic scheduling, you can trigger lead-time scheduling for the planning run by using the scheduling indicator. YES NO.
If MRP Areas are used, materials in the given storage locations are planned at the MRP area level. YES NO.
Requirements for a Raw Materials needed to manufacture Finished Product are dependent demand. YES NO.
One planner may only be responsible for one MRP controller. YES NO.
The low level code is calculated by the system and saved at the client level during BOM maintenance. YES NO.
If you designate backward/forward consumption with a backward period of 10 days and forward period of 5 days, the system will consume past requirements for a period of 10 calendar days before consuming any future requirements. YES NO.
If you do not review the exception messages or capacity prior to planning, than MPS is not a step you need in your planning process? YES NO.
If a safety time of one week specified, the requirement date is brought forward 1 week. YES NO.
Planned orders always generate production dates? YES NO.
If a material had to cure for a specific time period before it could be passed to the next operation, what time would be most appropriate to model? Curing time Wait time Sit around time.
For BOM explosion in MRP, you must set the BOM status in the BOM header so that it is active for MRP. YES NO.
While customizing MRP settings, you assign the strategy group to MRP group YES NO.