option
Questions
ayuda
daypo
search.php
ERASED TEST, YOU MAY BE INTERESTED ON SAP PP Master Data
COMMENTS STATISTICS RECORDS
TAKE THE TEST
Title of test:
SAP PP Master Data

Description:
SAP PP Master Data

Author:
Muhammad Ashfaq
Other tests from this author

Creation Date:
17/03/2014

Category: Others

Number of questions: 60
Share the Test:
New CommentNuevo Comentario
AVATARDevi Prasad ( uploaded 2 years )
Report comment
Business area covered in order type design ? 1. Planning 2. Warehouse 3. Finance 4. Implementation
Content:
Can a work center for which only basic data view has been maintained be used in an operation of a routing Yes, without any problem Yes, but you must enter the control key into the operation manaually No, it can't.
What is the lot size dependent in-house production time in the material master Determine precise operation dates in planning Determine precise basic order dates in planning Determine the base quantity Mandatory requirement for creating an order.
What are the ways of changing an operation of a referenced referenced operation set in a routing It cannot be done You must unlock the operation of the reference operation set You must unlock the entire operation set. This copies the reference operation set and you can change the operation You must change the operation in the reference operation set if you want the change to apply to all reference operation set usage.
The classification system, all classes, characteristics, and characteristic values are predefined by SAP and delivered with the system and cannot be changed by users. True False.
Only material master records can be classified using the classification system True False.
A batch is a unique homogeneous subset of a material, which is not reproducible. True False.
Variant configuration uses classification to select specific items on the bill of material and the corresponding operation on the routing for products that have many different options. True False.
A new material type can be created by simply clicking New Entries and entering the data True False.
Which of the following can be used to influence the screen sequence and attributes (required, visible, hidden) of the material master record. UserID Material type Plant Industry Transaction.
A bill of material is a complete, formally structured list of components that make up a product or assembly True False.
All of the components are stored in a multilevel bill of material for the finished goods. True False.
A material BOM is the only BOM category that can be created in the SAP ECC system. True False.
A material BOM can have many different usages for specific departments within a company. True False.
Each material BOM is material and plant unique and each material plant combination BOM has a separate internal number assigned to it. True False.
At minimum a basic data view of a material master record must exist before you can create a BOM for that material. True False.
The base unit of measure defaults into the BOM item but can be overridden with the issue unit of measure from the work scheduling view if it is populated. True False.
Each time a BOM is saved the system calculates the low level code which is used for planning. True False.
The area of validity is: The materials that can use a BOM The plants that can use a BOM The materials that are used by a BOM as components The industry that can use a BOM.
The validity period is: The materials that can use a BOM The plants that can use a BOM The time during which a BOM can be used to create an order The time during which a BOM is created.
Select each of the following that is not an item category. Stock item Non-stock item Class item Non-class item Text item.
Once an item category is assigned to a BOM item it cannot be changed. True False.
A variable sized item category requires you to enter the dimensions of the item. True False.
A non-stock item category does not require a material number. True False.
A recursive component on a BOM appears twice as a component with two different item numbers. True False.
Select each of the following that is a reason to use engineering change management. Monitoring and documentation of changes Planning and execution at a specific point in time You can save several change statuses for the same object Integration in the logical process chain All of the above None of the above.
When making a change to a BOM using a change number the validity dates on the BOM are changed to match the key date in the change number. True False.
Select each of the following that are ways to delete a BOM Delete the entire BOM Delete a BOMitem Set the deletion indicator Delete with a change number Archive the BOM.
Which report would you use to determine which BOMs will be affected by a component change? BOM comparison Level by level BOM explosion Multilevel BOM explosion Material where-used list.
Which report would you use to see an overview of all the necessary parts and materials? BOM comparison Level by level BOM explosion Multilevel BOM explosion Material where-used list.
Which report would you use to see the differences between two BOMs with different change statuses? BOM comparison Level by level BOM explosion Multilevel BOM explosion Material where-used list.
Which of the following are required to be configured before you can create a BOM? BOM usage BOMstatus Item Categories User-specific settings None of the above.
In Materials types for use in BOMs, you can indicate which material types can be used as the header material in a BOM True False.
A material with any material type can be used as a BOM component and this cannot be changed in the system True False.
Which of the following can be set in the user-specific settings? Item increment Default item category for materials Default BOM usage Default BOM category.
Which of the following is not a way to create routing material assignments in SAP ERP? Create a material specific routing Copy a materials master record and the BOM and routing are automatically copied also In the routing header create a material assignment Create a production version.
Which of the following is not a pre-requisite for component allocation? Operations in the routing must exist Production version must exist BOM for the material to be produced must exist Backflush indicator must be set.
Which of the following are ways to make changes to routings in SAP ERP? Without record of changes With change documents With history using ECM All of the above.
Any materials component that is not assigned to an operation in the routing will default to the first operation. True False.
Each item on the BOM can be assigned to one and only one operation on the routing. True False.
Component allocation to an operation is the only additional information which can be maintained with regard to components. True False.
Suboperations can be used for more detailed capacity planning and costing True False.
When using suboperations costing is automatically done at the operation level regardless of the control keys. True False.
You can use user-defined fields to assign data fields to an operation or suboperation for information purposes only True False.
A where-used list can show you which task lists will be affected by a change in work center. True False.
It is not possible to make mass changes to routings using an ECM number. True False.
A component with a negative quantity exists on a BOM. Select each of the following that it could be. Co-product By-product Waste product Recursive product.
Co-products, by-products, and waste products are materials on the BOM which you can choose to produce. True False.
One of the differences between co-products, by-products, and waste products is their inventory valuation and settlement. True False.
In order to use a material on a BOM as a co-product, you must first enable it to be used as a co-product in the material master. True False.
Float time that can be modeled in the scheduling of the routing include: Float before production Float after production Setup time Queue time Teardown time.
Which of the following are types of PRT's? Material Equipment Component Miscellaneous Document.
The duration of an operation consists of a maximum of 5 components. True False.
Teardown and wait time are always scheduled simultaneously. True False.
Only the minimum wait time is scheduled. True False.
Move time is defined only in the operation details. True False.
You can only split an operation processing time on a work center with more than 1 individual capacity. True False.
Operation can be set to overlap so that the next operation starts before the previous operation has finished. True False.
Reduction measures are applied when the lead time schedule of a routing does not fit within the basic date schedule. True False.
PRT is another name for a component that is used in production. True False.
The same PRT can be assigned to more than one operation on the same routing. True False.
Report abuse